| IIT(BHU)/CE/GIS/24-25/305 | Civil | Selection of consultancy firm for Decision support System for Water Resource Management | 28/03/2025 | 18.04.2025 (04:00 PM) | Download BOQ, Corrigendum 18.04.2025 |
| IIT(BHU)/ PHY/RKS/QTN/25-26/144 | Physics | CW Single frequency laser (Red and Green) | 28/03/2025 | 18.04.2025, (04:00 PM) | Download BOQ |
| IIT (BHU)/SMST/2024-25/H2-Retort/NK | SMST | High Temperature Controlled Atmosphere Hydrogen Retort Furnace along with Accessory | 10/03/2025 | 17.03.2025 | Download BOQ |
| IIT BHU/GI/2025/01 | E-Procurement Cell | Group Term Insurance Policy for employees of the Institute | 06/03/2025 | 26.03.2025, 03:00 PM | Download BOQ |
| IIT(BHU)/PEH/24-25/001 | Precision Engineering Hub | Supply and Installation of Modelling and Simulation software suite (additive manufacturing, welding and forming processes) | 05/03/2025 | 14.03.2025 | GeM |
| IIT (BHU)/Min/CQMURC/2024-25/124 | Mining | Thermal Gravimetric Analyzer | 05/03/2025 | 04/04/2025 at 03:00 pm | Download BOQ, Corrigendum 17.03.2025, Corrigendum 26.03.2025 |
| IIT (BHU)/AABS/CA/2024-25/03 | Balance Sheet Section | Works related to Taxation and Filing of Tax Return of the Institute | 28.02.2025 | 20.03.2025 (Thursday) | Download BOQ |
| IIT (BHU)/AABS/CA/2024-25/02 | Balance Sheet Section | Works related to Auditing of Projects, issuance of UC/EC, 15CA/CB form for LCs and wire transfers | 28.02.2025 | 20.03.2025 (Thursday) | Download BOQ |
| IIT (BHU)/AABS/CA/2024-25/01 | Balance Sheet Section | Work related to preparation of Annual Accounts & Balance Sheet and Bank Reconciliation Statement | 28.02.2025 | 20.03.2025 (Thursday) | Download BOQ |
| IIT(BHU)/ME/PS/2024-25/TD/016 | Mechanical | Fabrication, assembling and installation of inert gas atomizationbased powder production equipment | 28.02.2025 | 22.03.2025, 04:00 PM | Download BOQ |
| IIT(BHU)/IWD/ET-53/2024-25/2430 | IWD | Electrical installation wiring & illumination Work in the Limbdi & Satish Dhawan Hostel IIT(BHU), Varanasi | 28.02.2025 | 20.03.2025 (4:00 P.M.) | Download BOQ, Corrigendum 28.05.2025 |
| IIT(BHU)/IWD/ET-52/2024-25/2429 | IWD | Electrical wiring, illumination, power point, light & fan point works in the CV Raman, Morvi. | 28.02.2025 | 10.06.2025 (4:00 P.M.) | Download BOQ, Corrigendum 28.05.2025 |
| IIT(BHU)/IWD/ET-51/2024-25/2341 | IWD | Annual Operation & Maintenance Contract for round the clock routine services, Preventive/Breakdown | 21.02.2025 | 12.03.2025 (4:00 P.M.) | Download BOQ, Corrigendum 16.05.2025 |
| IIT(BHU)/CIF/2024-25/BioPrinter/184 | CIF | Supply, Installation and Commissioning of 3D Bio Printer Instrument | 19.02.2025 | 12.03.2025, (04:00 PM) | Download BOQ |
| IIT(BHU)/CIF/2024-25/DSO/183 | CIF | Supply, Installation and Commissioning of Digital Signal Oscilloscope | 19.02.2025 | 12.03.2025, (04:00 PM) | Download BOQ |
| IIT(BHU)/CIF/2024-25/SS/185 | CIF | Supply, Installation and Commissioning of Solar Simulator with IPCE Measurement | 19.02.2025 | 12.03.2025, (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/ET-49/2024-25/2218 | IWD | Electrical installation, wiring, illumination, cabelling, power point, light, fan point works in (SITC) of Indoor CPRI | 11.02.2025 | 03.03.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.03.2025, |
| IIT(BHU)/IWD/ET-48/2024-25/2217 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works in the Rapid Solidification Lab | 11.02.2025 | 03.03.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.03.2025, |
| IIT(BHU)/IWD/CT-67/2024-25/2208 | IWD | Renovation of 5 nos. of quarters in Thyagraj Colony | 10.02.2025 | 28.02.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.03.2025, |
| IIT(BHU)/IWD/ET-46/2024-25/2215 | IWD | Electrical installation, lighting, illumination in Rajputana and Gymkhana ground | 10.02.2025 | 28.02.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.03.2025, |
| IIT(BHU)/IWD/ET-47/2024-25/2216 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works at various location in the Library | 10.02.2025 | 28.02.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.03.2025, |
| IIT(BHU)/CIF/2024-25/TJP/176 | CIF | Supply, Installation and Commissioning of Twin Jet Electro Polisher Instrument | 10.02.2025 | 28.02.2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/EEE/SKS/DRDO/2024-25/Tender/1 | Electrical | Supply, Installation and Commissioning of Rack Server with Tower Workstations and other Accessories | 10.02.2025 | 03.03.2025, 04:00 PM | Download BOQ |
| भा.प्रौ.सं.(का.हि.हि.)/सं.क्र.प्र./2024-25/680 | संस्थाि क्रय प्रकोष | न्यू फैकल्टी अपाटटमेंट,भारतीय प्रौद्योनिकी संस्थाि(का.नि.नि. नि.), िाराणसी में जिरल स्टोर के नलए स्थाि पट्टे पर देिे के नलए निनिदा दस्तािेज | 10.02.2025 | 07/04/2025, 04:00 PM | Download BOQ, Corrigendum 24.03.2025 |
| IIT (BHU)/SMST/2024-25/H2-Retort/NK | SMST | High Temperature Controlled Atmosphere Hydrogen Retort Furnace along with Accessory | 06.02.2025 | 27.02.2025 | Download BOQ |
| IIT(BHU)/IWD/CT-63/2024-25/1960 | IWD | Renovation work in first floor Corridor of Workshop area, Rapid solidification lab | 06.02.2025 | 15.02.2025 (4:00 P.M.) | Corrigendum 06.02.2025 |
| IIT(BHU)/IWD/CT-41/2024-25/1576 | IWD | P/F Aluminium partition, False ceiling, Tile flooring, Painting work and Renovation | 06.02.2025 | 15.02.2025 (4:00 P.M.) | Corrigendum 06.02.2025 |
| IIT(BHU)/IWD/ET-35/2024-25/1771 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works | 06.02.2025 | 15.02.2025 (4:00 P.M.) | Corrigendum 06.02.2025, Corrigendum 12.03.2025 |
| IIT(BHU)/CHE/GM/24-25/Tender/133 | Chemical | Electrochemical Potentiostat Testing Machine for Batteries | 05.02.2025 | 10/03/2025, (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/ET-44/2024-25/2161 | IWD | Electrical renovation, installation, rewiring, illumination, power point, light & fan point works | 04.02.2025 | 25.02.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.03.2025, Corrigendum 21.05.2025 |
| IIT(BHU)/IWD/ET-43/2024-25/2179 | IWD | Solar street lighting Works | 04.02.2025 | 25.02.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-45/2024-25/2162 | IWD | Electrical renovation, installation, rewiring, illumination, power point, light & fan point works in Gopal Tripathi Auditorium Chemical Engineering | 04.02.2025 | 25.02.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.03.2025, Corrigendum 28.05.2025 |
| IIT(BHU)/IWD/CT-65/2024-25/2774 | IWD | Renovation work of Lab/Workshop/Faculty chamber and construction of connecting road and cycle | 31.01.2025 | 19.02.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-66/2024-25/2775 | IWD | Renovation of Toilet, Patch plaster and painting work in Shreenivas Deshpandey Library | 31.01.2025 | 19.02.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.03.2025, |
| IIT(BHU)/IWD/ET-33/2024-25/2165 | IWD | | 30.01.2025 | | Corrigendum 30.01.2025 |
| IIT(BHU)/IWD/ET-33/2024-25/2159 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works in Room-43 & Lab-18 (Machine room) in the Pharmaceutical Engineering | 30.01.2025 | 19.02.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.03.2025, |
| IIT(BHU)/IWD/ET-42/2024-25/2160 | IWD | Supply, Installation and commissioning of Bollard Lighting illuminations works in the guest house | 30.01.2025 | 19.02.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.03.2025 |
| IIT(BHU)/IWD/CT-32/2024-25/1365 | IWD | Making of platform of nano 2 micro materials design lab, Aluminium partition and false ceiling | 28.01.2025 | 07.02.2025 (4:00 P.M.) | Corrigendum 28.01.2025 |
| IIT(BHU)/IWD/CT-29/2024-25/1363 | IWD | Renovation works in Behavioural Research Lab of Department of Pharmaceutical Engineering & Technology | 28.01.2025 | 07.02.2025 (4:00 P.M.) | Corrigendum 28.01.2025 |
| IIT(BHU)/IWD/ET-23/2024-25/1395 | IWD | SITC of Electrical installation, wiring, illumination, cabeling, power point, light & fan point works | 28.01.2025 | 28.02.2025 (4:00 P.M.) | Corrigendum 28.01.2025, Corrigendum 12.03.2025 |
| IIT(BHU)/SBChE/2024-25/PD-OTR/T01/177 | Biochemical | Oxygen Permeability Tester | 28.01.2025 | 3/02/2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/ET-25/2024-25/1452 | IWD | Electrical installation, illuminations and wiring work in the Carpentry workshop for DRDO | 21.01.2025 | 28.02.2025 (4:00 P.M.) | Corrigendum 21.01.2025 |
| IIT(BHU)/IWD/CT-30/2024-25/1368 | IWD | P/F Granite work in NCC Building, Painting work in Committee Hall & Head Chamber and Parking Tile | 21.01.2025 | 10.02.2025 (4:00 P.M.) | Corrigendum 21.01.2025 |
| IIT(BHU)/IWD/ET-26/2024-25/1453 | IWD | Electrical installation, wiring, illumination, cabeling, power point, light & fan point works at first floor in the Humanistic Studies Department | 21.01.2025 | 28.02.2025 (4:00 P.M.) | Corrigendum 21.01.2025 |
| IIT(BHU)/CE/2024-25/3896 | Civil | Unmanned Aerial Vehicle (UAV) for Mapping | 17.01.2025 | 08-02-2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/CE/GIS/24-25/182 | Civil | Water Resources Modelling Software | 17.01.2025 | 08-02-2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/CIF/2024-25/RSM/139 | CIF | Supply, Installation and Commissioning of High End Research Grade Rheometer System with Microscopy | 15.01.2025 | 30/01/2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/CT-50/2024-25/1669 | IWD | Construction of Children Park at faculty Apartment | 14.01.2025 | 03.02.2025 (4:00 P.M.) | Corrigendum 13.01.2025 |
| IIT(BHU)/IWD/ET-41/2024-25/2064 | IWD | Supply, Installation, Testing and Commissioning of Battery Bank in the Dhanrajgiri DSS and Battery Charging Panel in the DSS-B | 14.01.2025 | 03.02.2025 (4:00 P.M.) | Download BOQ, |
| IIT(BHU)/IWD/CT-35/2024-25/1376 | IWD | Renovation works in Lab No-43(FF), Lab No-21, GT-18 of Department of Pharmaceutical Engineering &Technology | 10.01.2025 | 31.01.2025 (4:00 P.M.) | Corrigendum 10.01.2025 |
| IIT(BHU)/IWD/CT-46/2024-25/1590 | IWD | Construction of paver block for parking, repair of drain, providing and laying of concrete cover in drain and cable trench work in front of new faculty apartment | 10.01.2025 | 31.01.2025 (4:00 P.M.) | Corrigendum 10.01.2025 |
| IIT(BHU)/ME/PS/2024-25/TD/012 | Mechanical | Long Distance Microscopes with shadow strobe illumination unit | 09.01.2025 | 21.01.2025, (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/ET-21/2024-25/1465 | IWD | Annual Operation & Maintenance Contract for round the clock routine services, Preventive/Breakdown maintenance of 1 No. 33/11kV PSS | 09.01.2025 | 29.01.2025 (6:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/ET-24/2024-25/1396 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works of Ganga Laboratory | 09.01.2025 | 10.01.2025 (4:00 P.M.) | |
| IIT(BHU)/IWD/CT-54/2024-25/1745 | IWD | Renovation of Ganga Laboratory, Department of Civil Engineering | 09.01.2025 | 10.01.2025 (4:00 P.M.) | Download BOQ, Corrigendum 09.01.2025 |
| IIT(BHU)/IWD/CT-48/2024-25/1668 | IWD | Providing and fixing of net door profile sheets for guard and false ceiling in Proctor Office and P/f of wooden wall panelling, making of dais | 09.01.2025 | 10.01.2025 (4:00 P.M.) | Download BOQ, Corrigendum 09.01.2025 |
| IIT(BHU)/IWD/ET-40/2024-25/2042 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works in lab CR-209 and CR-219 in the Department of Ceramic engg | 08.01.2025 | 04.03.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.02.2025, Corrigendum 28.05.2025 |
| IIT(BHU)/CE/GIS/24-25/149 | Civil | Acoustic Doppler Current Profiler | 08.01.2025 | 29-01-2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/ET-39/2024-25/2039 | IWD | SITC of Electrical installation, wiring, illumination, cabeling, power point, light & fan point works in the Vivekanand Hostels | 06.01.2025 | 04.03.2025 (4:00 P.M.) | Download BOQ, Corrigendum 12.02.2025 |
| IIT(BHU)/Ceramic Engg./Tender/24-25/TGA | Ceramic | Simultaneous Thermogravimetry – Differential Scanning Calorimetry NETZSCH With complete system & Accessories | 03.01.2025 | 25/01/2025, (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/CT-64/2024-25/1959 | IWD | Providing and laying tiles flooring and Distempering for Lecturer theatre 1, 2, 3 and 4 and chamber of Dr. Nitai C Majhi in Department of Chemical Engineering | 03.01.2025 | 22.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-63/2024-25/1960 | IWD | Renovation work in first floor Corridor of Workshop area, Rapid solidification lab and Construction of Toilet in First floor in Department of Metallurgical Engineering | 03.01.2025 | 22.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-62/2024-25/1958 | IWD | Construction of Paver block for Parking, Dismantling store room, Apron one side of Library Building, Surface Dressing, Levelling, Cement Concreting work | 31.12.2024 | 21/01/2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/ET-38/2024-25/1956 | IWD | SITC of Electrical installation, wiring, illumination, cabeling, power point, light & fan point works | 31.12.2024 | 21/01/2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/CT-61/2024-25/1957 | IWD | Repair of seepage of walls of the rooms in Morvi, S.C. Dey, GSMC, Satish Dhawan & mess area of S.C Dey & GSMC. | 31.12.2024 | 21/01/2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/SBChE/2024-25/PD-OTR/T01/177 | Biochemical | Oxygen Permeability Tester | 31.12.2024 | 21/01/2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/ECE/MT/DRDO/2024-25/Tender/97 | Electronics | Supply, Installation and Commissioning of Benchtop Performance Vector Network Analyzer (PNA) up to 50 GHz along with Extender Modules (Both 50 GHz to 75 GHz & 75 GHz -110 GHz), Configurable Test Set and all Related Accessories | 30.12.2024 | 27.01.2025, (04:00 PM) | Download BOQ, Corrigendum 20.01.2025 |
| IIT(BHU)/ME/PS/2024-25/TD/12 | Mechanical | Long Distance Microscopes with shadow strobe illumination unit | 26.12.2024 | 02.01.2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/CHY/IIT(BHU)/2024-25/G.C/01 | Chemistry | Gas Chromatography | 24.12.2024 | 25.01.2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/CHE/RG/2024-25/Tender/104 | Chemical | Supply of Battery Life Cycler | 23.12.2024 | 09.01.2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/CT-59/2024-25/1879 | IWD | P/F acoustic panel for noise absorption in Drawing Halls16,17 and B.S.Singh Hall | 20.12.2024 | 09.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-60/2024-25/1880 | IWD | Construction of new platform with granite, plumbering, door, making wood shelve, false ceiling, aluminium partition (cabin), painting works in Department of Chemistry | 20.12.2024 | 09.01.2025 (4:00 P.M.) | Download BOQ, Corrigendum 24.02.2025 |
| IIT(BHU)/CE/2024-25/3732 | Civil | Unmanned Aerial Vehicle (UAV) for Mapping | 19.12.2024 | 10-01-2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/CIF/2024-25/RSM/139 | CIF | Supply, Installation and Commissioning of High End Research Grade Rheometer System with Microscopy | 19.12.2024 | 09/01/2025 (04:00 PM) | Download BOQ, Corrigendum 15.01.2025 |
| IIT(BHU)/Cafeteria/2024-25/02 | Institute Development Fund | Catering Services in IIT (BHU) Cafeteria | 19.12.2024 | 08.01.2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/GTAC/2024-25/01 | Institute Development Fund | Providing House Keeping and Catering Services in Gandhi Technology Alumni Centre (GTAC) | 19.12.2024 | 08.01.2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/CT-58/2024-25/1877 | IWD | Construction of new bicycle stand of C.V. Raman & expansion of the area of old bicycle stand of vivekanand | 17.12.2024 | 07.01.2025 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/SBChE/2024-25/Lyophilizer/T03/135 | Biochemical | Lyophilizer | 17.12.2024 | 01/01/2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/CIF/2024-25/RSM/134 | CIF | Supply, Installation and Commissioning of High End Research Grade Rheometer System with Microscopy | 16.12.2024 | 06/01/2025 (04:00 PM) | Download BOQ, Corrigendum 19.12.2024 |
| IIT(BHU)/CIF/2024-25/NMTS/133 | CIF | Supply, Installation and Commissioning of Nanomechanical Testing System | 16.12.2024 | 06/01/2025 (04:00 PM) | Download BOQ, Corrigendum 08.01.2025 |
| IIT(BHU)/IWD/ET-37/2024-25/ 1865 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works in the Drawing hall-16, 17 & B.M. Singh hall | 16.12.2024 | 06.01.2025 (5:00 P.M.) | Download BOQ, Corrigendum 23.01.2025 |
| IIT(BHU)/CE/GIS/24-25/75 | Civil | Acoustic Doppler Current Profiler | 16.12.2024 | 06-01-2025 (04:00 PM) | Download BOQ |
| IIT(BHU)/ PHE/SKJ/SLCR/01 | Pharmaceutical | LIQUID CHROMATOGRAPHY-HIGH RESOLUTION MASS SPECTROMETRY (LC-HRMS) | 12.12.2024 | 08-01-2025 (04:00 PM) | Download BOQ, Corrigendum 24.12.2024 |
| IIT(BHU)/SDLIB/Tender/2024-25/01 | Shreenivas Deshpande Library | Supply, Installation, Testing and Commissioning of RFID (Radio Frequency Identification) System in the Shreenivas Deshpande Library | 03.12.2024 | 16.12.2024 (03:00 PM) | Download BOQ, Corrigendum 05.12.2024, Corrigendum 11.12.2024 |
| IIT(BHU)/IWD/ET-34/2024-25/1647 | IWD | SITC of Electrical installation, wiring, cabelling, electrical panel, illumination, power point, light & fan point works in the lab no. CR-208, CR-111, CR109, CR-217 | 03.12.2024 | 30.12.2024 (5:00 P.M.) | |
| IIT(BHU)/IWD/CT-57/2024-25/1773 | IWD | Renovation of CCD Near new faculty appartment, IIT (BHU) | 03.12.2024 | 23.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-35/2024-25/1771 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works in the PG Research lab, Room no. 69 ground floor | 03.12.2024 | 22.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-36/2024-25/1770 | IWD | Electrical installation,wiring,illumination,power point,light & fan point works in the Research laboratory21 of Pharmaceutical | 03.12.2024 | 22.01.2025 (4:00 P.M.) | Download BOQ,Corrigendum 12.03.2025 |
| IIT(BHU)/IWD/CT-56/2024-25/1769 | IWD | Renovation of PG Research Lab, (Room no-69) at the Department of Pharmaceutical Engineering &Technology | 29.11.2024 | 23.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/ME/PS/2024-25/TD/012 | Mechanical | Supply of Combined Vacuum Inert Gas Atomization (VIGA) and Electrode Inert Gas Atomization (EIGA) System | 22.11.2024 | 07.12.2024 | Download BOQ |
| IIT(BHU)/PH/FY/2024-25/Ball Mill/41 | Pharmaceutical | Ball Mill | 21.11.2024 | 05.12.2024 | Download BOQ |
| IIT(BHU)/PH/FY/2024-25/Micro. Spec./40 | Pharmaceutical | Microplate Spectrophotometer | 21.11.2024 | 05.12.2024 | Download BOQ |
| IIT(BHU)/IWD/CT-54/2024-25/1745 | IWD | Renovation of Ganga Laboratory, Department of Civil Engineering | 21.11.2024 | 11/12/2024 (04:00 PM) | Download BOQ, Corrigendum 20.12.2024 |
| IIT(BHU)/CIF/2024-25/MDS/114 | CIF | Supply, Installation and Commissioning of Microwave Digestion System | 19.11.2024 | 10/12/2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/ET-23/2024-25/1395 | IWD | SITC of Electrical installation, wiring, illumination, cabeling, power point, light & fan point works in Behavioural Research lab | 19.11.2024 | 14.01.2025 (4:00 P.M.) | |
| : IIT(BHU)/IWD/CT-32/2024-25/1365 | IWD | Making of platform of nano 2 micro materials design lab, Aluminium partition and false ceiling works and renovation in department of chemical engineering | 19.11.2024 | 13.01.2025 (4:00 P.M.) | Corrigendum 23.12.2024 |
| : IIT(BHU)/IWD/CT-48/2024-25/1668 | IWD | Providing and fixing of net door profile sheets for guard and false ceiling in Proctor Office and P/f of wooden wall panelling, making of dais | 19.11.2024 | 09.12.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-24/2024-25/1396 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works of Ganga Laboratory, Department of Civil Engineering | 19.11.2024 | 09.12.2024 (5:00 P.M.) | |
| IIT (BHU)/BME/QTN/2024-25/04 | Biomedical | Supply, Installation and Commissioning of: “Fluorescence Spectrophotometer (With All Accessories)” | 18.11.2024 | 12.12.2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/ME/2024/TD/BP | Mechanical | Long Distance Microscope | 18.11.2024 | 05-12-2024 | Download BOQ |
| IIT(BHU)/CIF/2024-25/Twin Jet/113 | CIF | Supply, Installation and Commissioning of Twin Jet Polisher Instrument | 14.11.2024 | 29.11.2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/CT-50/2024-25/1669 | IWD | Construction of Children Park at faculty Apartment, IIT | 14.11.2024 | 02.01.2025 (5:00 P.M.) | Download BOQ, Corrigendum 20.12.2024 |
| IIT(BHU)/IWD/CT-51/2024-25/1670 | IWD | P/F aluminium partition, tiles flooring, making of platform and painting work in Energy Resource lab | 14.11.2024 | 02.01.2025 (5:00 P.M.) | Download BOQ, Corrigendum 20.12.2024 |
| IIT(BHU)/IWD/CT-52/2024-25/1634 | IWD | P/F wall paneling, upvc windows & door, false ceiling and painting work in server room | 14.11.2024 | 05.12.2024 (5:00 P.M.) | Download BOQ, Corrigendum 20.12.2024 |
| IIT(BHU)/IWD/CT-53/2024-25/1671 | IWD | Providing & fixing of floor & wall tiles in Morvi, S.N. Bose, Satish Dhawan hostel and false ceiling in bathroom of Nivedita Hostel. | 14.11.2024 | 02.01.2025 (5:00 P.M.) | Download BOQ, Corrigendum 20.12.2024 |
| IIT(BHU)/CED/SK-VA/2024-25/0001 | Civil | Dynamic Actuator with Hydraulic Control Unit and Accessories | 13.11.2024 | 06/12/2024 | Download BOQ |
| IIT(BHU)/SBME/Paik/01 | Biomedical | Supply, Installation and Commissioning of: “UV-Vis Spectrophotometer (with all accessories) | 13.11.2024 | 12.12.2024 (05.00 PM) | Download BOQ |
| IIT(BHU)/ME/PS/2024-25/TD/011 | Mechanical | Fabrication, assembling and installation of inert gas atomization-based powder production equipment | 13.11.2024 | 28.11.2024 | |
| IIT(BHU)/IWD/CT-35/2024-25/1376 | IWD | Renovation works in Lab No-43(FF), Lab No-21, GT-18 of Department of Pharmaceutical Engineering | 13.11.2024 | 03.12.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-30/2024-25/1368 | IWD | P/F Granite work in NCC Building, Painting work in Committee Hall & Head Chamber and Parking Tile & plinth protection work in Training and placement Cell | 13.11.2024 | 03.12.2024 (5:00 P.M.) | Download BOQ, Corrigendum 20.12.2024 |
| IIT(BHU)/IWD/CT-31/2024-25/1364 | IWD | Renovation work in Lab of Dr. Brijesh Kumar and Dr. Sudip Mukharaji in the school of Biomedical Engineering | 13.11.2024 | 30.12.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-36/2024-25/1369 | IWD | Providing and Fixing Water tank and puff sheet in Gymkhana | 13.11.2024 | 30.12.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/ECE/MT/DRDO/2024-25/Tender/79 | Electronics | Supply, Installation and Commissioning of Rack Server with 15 Thin Client having Dual Processors including Dual GPU Card/Co-Processor and other Accessories | 13.11.2024 | 04.12.2024 | Download BOQ |
| IIT(BHU)/CHY/IIT(BHU)/2024-25/UV-Vis/01 | Chemistry | UV-Vis Spectrometer/ Advanced Spectrophotometer | 13.11.2024 | 27.11.2024 | Download BOQ |
| IIT(BHU)/IWD/ET-25/2024-25/1452 | IWD | Electrical installation, illuminations and wiring work in the Carpentry workshop for DRDO Industry AcademicCentre of Excellence for the development of the DIA-CoE Laboratory | 12.11.2024 | 30.12.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-26/2024-25/1453 | IWD | Electrical installation, wiring, illumination, cabeling, power point, light & fan point works at first floor in the Humanistic Studies | 12.11.2024 | 30.12.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-21/2024-25/1465 | IWD | Annual Operation & Maintenance Contract for round the clock routine services, Preventive/Breakdown maintenance of 1 No. 33/11kV PSS (with GIS Panels & AIS), 07 Nos. 11kV/433V DSS, 04 nos. | 08.11.2024 | 26.12.2024 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-46/2024-25/1590 | IWD | Construction of paver block for parking, repair of drain, providing and laying of concrete cover in drain and cable trench work in front of new faculty apartment | 06.11.2024 | 26.11.2024 (5:00 P.M.) | Download BOQ, Corrigendum 05.12.2024 |
| IIT(BHU)/IWD/CT-49/2024-25/1591 | IWD | Providing and fixing tiles and painting work for faculty chambers, the Research lab and the classroom Laying in ground floor in the department of Mathematical sciences | 06.11.2024 | 26.11.2024 (5:00 P.M.) | Download BOQ, Corrigendum 05.12.2024 |
| IIT(BHU)/IWD/ET-31/2024-25/1580 | IWD | SITC of outdoor CPRI certified Electrical cubical main panel in IMD and extension of new Electrical line Division / Department office in the Metallurgical | 05.11.2024 | 25.11.2024 (5:00 P.M.) | Download BOQ, Corrigendum 05.12.2024, |
| IIT(BHU)/ME/PS/2024-25/TD/012 | Mechanical | Supply of Combined Vacuum Inert Gas Atomization (VIGA) and Electrode Inert Gas Atomization (EIGA) System | 04.11.2024 | 20.11.2024 | Download BOQ |
| IIT(BHU)/SBChE/2024-25/Lyophilizer/T03/135 | Biochemical | Lyophilizer | 30.10.2024 | 21.11.024 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/CT-45/2024-25/1579 | IWD | Construction of new platform with granite, plumbering, door, making wood shelve, false ceiling, aluminium partition (cabin), painting works in Department of Chemistry, Repair of Toilet T-15 GRTA and various civil | 30.10.2024 | 20.11.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-43/2024-25/1580 | IWD | Renovation work in first floor Corridor of Workshop area, Rapid solidification lab and Construction of Toilet in First floor in Department of Metallurgical Engineering | 30.10.2024 | 20.11.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-41/2024-25/1576 | IWD | P/F Aluminium partition, False ceiling, Tile flooring, Painting work and Renovation of Toilet in Department of Humanistic studies | 30.10.2024 | 23.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-42/2024-25/1581 | IWD | Construction of new bicycle stand of C.V. Raman & expansion of the area of old bicycle stand of vivekanand, GSMC, Aryabhatta and sewer line of Morvi, vivekanand hostel and Renovation of toilet in A.S.N Bose hostel, P/F of SS mosquito net in Bathrooms in Rajputana hostels & Vishwakarma hostels, P/F of 14 nos of western/Indian commode in C.V. Raman hostel, GSMC, Vishwasraiya & Ramanujan Hostels | 30.10.2024 | 20.11.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-44/2024-25/1578 | IWD | P/F aluminium partition, tiles flooring, false ceiling, upvc window and painting work in lab and cabin of Dr. Abir Ghosh (on first floor) | 30.10.2024 | 23.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-47/2024-25/1577 | IWD | P/F of aluminium partition, tiles flooring and false ceiling work in composite structure and materials | 30.10.2024 | 20.11.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/CIF/2024-25/Twin Jet/94 | CIF | Supply, Installation and Commissioning of Twin Jet Polisher Instrument | 30.10.2024 | 08.11.2024 (04:00 p.m.) | Download BOQ, Corrigendum 30.10.2024 Corrigendum 13.11.2024 |
| IIT(BHU)/IWD/ET-30/2024-25/1572 | IWD | Electrical Installation, wiring, illumination, power point, light & fan point works in the old building at ground & first floor in Department of SMST | 29.10.2024 | 10.01.2025 (4:00 P.M.) | Download BOQ, Corrigendum 20.12.2024 |
| IIT(BHU)/PH/FY/2024-25/QTN/M/23 | Pharmaceutical | Fluorescence microplate reader (Multimode Microplate Reader and Fluorimeter) | 25.10.2024 | 21-11-2024 | Download BOQ |
| IIT(BHU)/IWD/ET-32/2024-25/1565 | IWD | Street lighting Works in the various locations of the institute i.e Academic Area , Karmanveer temple road Hyderabad choti gate, between Limbdi Hostel to Rajputana hostel to Satvik mess road, Chief proctor office road and lawn infront of main workshops etc | 24.10.2024 | 14.12.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/PH/FY/2024-25/Micro Spec/40 | Pharmaceutical | Microplate Spectrophotometer | 24.10.2024 | 16.11.2024 | Download BOQ |
| IIT(BHU)/ME/PS/2024-25/TD/011 | Mechanical | Fabrication, assembling and installation of inert gas atomization-based powder production equipment | 24.10.2024 | 11.11.2024 (04.00 pm) | |
| IIT (BHU)/Met-PS/DRDO/24-25/18 | Metallurgical | Supply And Installation of Two-Dimensional Digital Image Correlation (2D-DIC) System for Non-Contact Strain Measurement | 22.10.2024 | 26.11.2024 (04.00 pm) | Download BOQ, Corrigendum 11.11.2024 |
| IIT(BHU)/IWD/ET-27/2024-25/3164 | IWD | Electrical wiring of various of three phase, single phase power connection power point and light point works and shifting of main power board from carpentry shop to main work shop | 22.10.2024 | 14.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-28/2024-25/3163 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works after renovation works in the various rooms & corridor | 22.10.2024 | 14.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-29/2024-25/3162 | IWD | Electrical Installation, wiring, illumination, power point, light & fan point, in the air pollution control lab, Newley Allocated Laboratory and replacement of electrical main panel board | 22.10.2024 | 14.01.2025 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/ PHE/RC-GT/2024-25/03 | Pharmaceutical | HIGH-PERFORMANCE LIQUID CHROMATOGRAPHY (HPLC) | 22.10.2024 | 18-11-2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/CHY/IIT(BHU)/2024-25/UV-Vis/01 | Chemistry | UV-Vis Spectrometer/Advanced Spectrophotometer | 18.10.2024 | 08.11.2024 | Download BOQ |
| IIT(BHU)/CE/2024-25/2749 | Civil | Transient Electromagnetic Equipment | 18.10.2024 | 31.10.2024 | Download BOQ |
| IIT(BHU)/DRDO/ME/2024-25/TD/002R | Mechanical | Optical 2D DIC strain measurement system | 16.10.2024 | 29.10.2024 | Download BOQ |
| IIT(BHU)/IWD/CT-38/2024-25/1476 | IWD | P/L Paver block both side of road for parking from proctor | 15.10.2024 | 05.11.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-40/2024-25/1475 | IWD | P/F car parking shed and c/o pathway behind ABLT Building, | 15.10.2024 | 05.11.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-39/2024-25/1474 | IWD | Construction of Paver block for Parking, Dismantling store room, Apron one side of Library Building, Surface Dressing, Levelling, Cement Concreting work in Campus of Shreenivas | 15.10.2024 | 05.11.2024 (5:00 P.M.) | Download BOQ,Cancellation |
| IIT(BHU)/IWD/CT-37/2024-25/1473 | IWD | Renovation of Ganga Laboratory, Department of Civil Engineering | 15.10.2024 | 04.11.2024 (5:30 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/ET-21/2024-25/1465 | IWD | Annual Operation & Maintenance Contract for round the clock routine services, Preventive/Breakdown maintenance of 1 No. 33/11kV PSS (with GIS Panels & AIS), 07 Nos. 11kV/433V DSS, 04 nos. 11kV/433V Compact Substation, all allied Substation systems (SCADA ,Battery etc.) and HT/ LT service Lines at IIT (BHU) Campus | 14.10.2024 | 01.11.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/ET-26/2024-25/1453 | IWD | Electrical installation, wiring, illumination, cabeling, power point, light & fan point works at first floor | 10.10.2024 | 31.10.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-25/2024-25/1452 | IWD | Electrical installation, illuminations and wiring work in the Carpentry workshop for DRDO Industry AcademicCentre of Excellence for the development of the DIA-CoE Laboratory | 10.10.2024 | 31.10.2024 (5:00 P.M.) | Download BOQ |
| IIT (BHU)/BME/QTN/2024-25/03 | Biomedical | VIRTUAL REALITY HARDWARE AND SOFTWARE SETUP | 09.10.2024 | 05-11-2024 | Download BOQ |
| IIT(BHU)/ME/PS/2024-25/TD/010 | Mechanical | COLD ISOSTATIC PRESS | 09.10.2024 | 23.10.2024 | Download BOQ |
| IIT(BHU)/IWD/ET-24/2024-25/1396 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works of Ganga Laboratory | 07.10.2024 | 28.10.2024 (5:00 P.M.) | Download BOQ, Corrigendum 11.11.2024 |
| IIT(BHU)/IWD/ET-23/2024-25/1395 | IWD | SITC of Electrical installation, wiring, illumination, cabeling, power point, light & fan point works in Behavioural Research | 07.10.2024 | 28.10.2024 (5:00 P.M.) | Download BOQ, Corrigendum 11.11.2024 |
| IIT(BHU)/IWD/CT-36/2024-25/1369 | IWD | Providing and Fixing Water tank and puff sheet in Gymkhana | 04.10.2024 | 25.10.2024 (5:00 P.M.) | Download BOQ, Corrigendum 11.11.2024 |
| IIT(BHU)/IWD/CT-35/2024-25/1376 | IWD | Renovation works in Lab No-43(FF), Lab No-21, GT-18 of Department of Pharmaceutical Engineering &Technology | 04.10.2024 | 25.10.2024 (5:00 P.M.) | Download BOQ, Corrigendum 11.11.2024 |
| IIT(BHU)/IWD/CT-34/2024-25/1374 | IWD | Providing and laying tiles flooring, Distempering and false ceiling for Lecture Theatre 1, 2, 3 and 4 and chamber in Department of Chemical Engineering | 04.10.2024 | 25.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-33/2024-25/1375 | IWD | Construction of Children Park at faculty Apartment | 04.10.2024 | 25.10.2024 (5:00 P.M.) | Download BOQ, Corrigendum 11.11.2024 Cancellation |
| IIT(BHU)/DRDO/ME/2024-25/TD/002 | Mechanical | Optical 2D DIC strain measurement system | 04.10.2024 | 11.10.2024 (04:00 PM) | Download BOQ |
| IIT (BHU)/MET/DRDO/SDY/2024-25/1 | Metallurgical | Supply, Installation and Commissioning of High Temperature Vacuum Furnace for 1600 °C | 04.10.2024 | 25.10.2024 (04:00 pm) | Download BOQ |
| IIT (BHU)/Min/HD/24-25/157 | Mining | Borehole Deviation Probe | 01.10.2024 | 29.10.2024 (04.00 PM) | Download BOQ, Corrigendum 21.10.2024 |
| IIT(BHU)/IWD/CT-30/2024-25/1368 | IWD | P/F Granite work in NCC Building, Painting work in Committee Hall & Head Chamber and Parking Tile & plinth protection work in Training and placement Cell, Toughened glass work in SAC and Renovation of UTS Lab in Mining Department | 30.09.2024 | 21.10.2024 (5:00 P.M.) | Download BOQ, Corrigendum 11.11.2024 |
| IIT(BHU)/IWD/CT-32/2024-25/1365 | IWD | Making of platform of nano 2 micro materials design lab, Aluminium partition and false ceiling works and renovation in department of chemical engineering | 27.09.2024 | 18.10.2024 (5:00 P.M.) | Download BOQ, Corrigendum 11.11.2024, Corrigendum 12.03.2025 |
| IIT(BHU)/IWD/CT-29/2024-25/1363 | IWD | Renovation works in Behavioural Research Lab of Department of Pharmaceutical Engineering & Technology | 27.09.2024 | 11.12.2024 (4:00 P.M.) | Download BOQ, Corrigendum 11.11.2024 |
| IIT(BHU)/IWD/CT-28/2024-25/1362 | IWD | P/F of Tile flooring, Painting work in System Lab and Kota stone work at store room of machine and Drive Laboratary, Department of Electrical Engineering | 27.09.2024 | 13.01.2025 (4:00 P.M.) | Download BOQ, Corrigendum 11.11.2024, Corrigendum 23.12.2024 |
| IIT(BHU)/IWD/CT-31/2024-25/1364 | IWD | Renovation work in Lab of Dr. Brijesh Kumar and Dr. Sudip Mukharaji in the school of Biomedical Engineering | 27.09.2024 | 18.10.2024 (5:00 P.M.) | Download BOQ, Corrigendum 11.11.2024 |
| IIT(BHU)/IWD/ET-22/2024-25/1361 | IWD | SITC of Electrical installation, wiring, illumination, cabeling, power point, light & fan point works in Mine Environment Laboratory, girls’ toilets in Mining Dept, Common areas and Instrument Lab of Bio Medical Dept, women toilet in Pharmaceutical dept, Lab in physics dept in LT-1.1, LT-1.2, LT-1.3 for installation of new instrument/machine in SMST, Pharmaceutical dept, admin building | 27.09.2024 | 18.10.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-26/2024-25/1321 | IWD | Providing and fixing of net door profile sheets for guard and false ceiling in Proctor Office and P/f of wooden wall panelling, making of dais, upvc windows and painting work in seminar room, School of Biochemical Engineering | 26.09.2024 | 17.10.2024 (5:30 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-25/2024-25/1311 | IWD | Providing & fixing of floor & wall tiles in Morvi, S.N. Bose, Satish Dhawan hostel and false ceiling in bathroom of Nivedita Hostel. Diluting and Injecting chemical emulsion for Post-Constructional anti-termite treatment in S.C.Dey, Vivekananda ... | 26.09.2024 | 17.10.2024 (5:30 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-24/2024-25/1322 | IWD | Providing and fixing tiles and painting work for faculty chambers, the Research lab and the classroom Laying in ground floor in the department of Mathematical sciences | 26.09.2024 | 17.10.2024 (5:30 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/ACD/2024-25/13Conv/04 | Office ( Dean Academic Affairs) | Illumination of Buildings for 13th Convocation | 25.09.2024 | 07.10.2024 (5:00 P.M.) | |
| IIT(BHU)/ACD/2024-25/13 Conv/05 | Office ( Dean Academic Affairs) | Printing and Supply of Invitation Cards, Convocation Proceedings, Directors Report and Institute Brochure for 13th Convocation | 25.09.2024 | 07.10.2024 (5:00 P.M.) | |
| IIT(BHU)/IWD/ET-20/2024-25/1302 | IWD | Street lighting Works in the various locations of the institute i.e Academic Area , Karmanveer temple road Hyderabad choti gate, between Limbdi Hostel to Rajputana hostel to Satvik mess road, Chief proctor office road and lawn infront of main workshops etc | 25.09.2024 | 16.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/ET-19/2024-25/1301 | IWD | Supply, Installing, Testing and Commissioning of ‘Silent Type 125 KVA Diesel Generator' in the Nivedita Girls Hostel, Morvi-II and Faculty Apartment Block C & D | 25.09.2024 | 16.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-27/2024-25/1310 | IWD | P/F of aluminium partition, tiles flooring and false ceiling work in composite structure and materials, Department of Civil Engineering | 25.09.2024 | 16.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/ChE/RKU/BRNS/02/24-25 | Chemical | High temperature fluidized bed setup with side wall nozzle injection system for gas, decomposing and non-decomposing liquid with RPT stand and oil free air compressor | 24.09.2024 | 01-10-2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/ACD/2024-25/13 Conv/06 | Office ( Dean Academic Affairs) | Supply of Packed Lunch for 13th Convocation of IIT(BHU) | 24.09.2024 | 14.10.2024 (05:00PM) | Download BOQ |
| IIT(BHU)/IWD/CT-22/2024-25/1305 | IWD | Renovation and construction work Required in Department of Mining Engineering | 24.09.2024 | 15.10.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-21/2024-25/1304 | IWD | Construction of paver block for parking, repair of drain, providing and laying of concrete cover in drain and cable trench work in front of new faculty apartment | 24.09.2024 | 15.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-20/2024-25/1303 | IWD | Construction of new platform with granite, plumbering, door, making wood shelve, false ceiling, aluminium partition (cabin), painting works in Department of Chemistry, Repair of Toilet T-15 GRTA and various civil work in Ceramic | 24.09.2024 | 15.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/2024-25/CCIS/34 | CCIS | Procurement of Microsoft Campus License (Supply, Installation, Testing & Commissioning) | 18.09.2024 | 09.10.2024 | Download BOQ Corrigendum 27.09.2024 |
| IIT(BHU)/IWD/CT-23/2024-25/1282 | IWD | P/F wall paneling, upvc windows & door, false ceiling and painting work in server room, Centre for Computing and Information Services (CCIS) | 18.09.2024 | 09.10.2024 (5:30 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-18/2024-25/1281 | IWD | P/F aluminium partition, tiles flooring, false ceiling, upvc window and painting work in lab and cabin of Dr. Abir Ghosh (on first floor) Department of Chemical Engg | 18.09.2024 | 09.10.2024 (5:30 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/CHY/2024-25/Rosy/Battery Cycler1 | Chemistry | Battery Cycler | 18.09.2024 | 03.10.2024 (04.00 PM) | Download BOQ |
| IIT(BHU)/SMST/2024-25/OH-35/01 | SMST | DOUBLE BEAM UV-VIS SPECTROPHOTOMETER | 18.09.2024 | 08.10.2024 | Download BOQ |
| IIT/HTL/CoW/24-25/QTN/200 | CoW | Quotation enquiry for supply Gadda Takiya & Bed Sheet for 13th Convocation. | 17.09.2024 | 04.10.2024 (5:00 P.M.) | |
| IIT(BHU)/IWD/CT-19/2024-25/1225 | IWD | Construction of cement concrete pavement road, portico and canopy inside guest house boundary | 17.09.2024 | 07.10.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-12/2024-25/1220 | IWD | P/F aluminium partition, tiles flooring, making of platform and painting work in Energy Resource lab (on the First Floor) Department of Chemical Engineering. | 17.09.2024 | 07.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/CE/2024-25/01 | Civil | Transient Electromagnetic Equipment | 13.09.2024 | 04.10.2024 | Download BOQ |
| IIT(BHU)/IWD/CT-17/2024-25/1224 | IWD | Repair of seepage of walls of the rooms in Morvi, S.C. Dey, GSMC, Satish Dhawan & mess area of S.C Dey & GSMC. Repairing of plaster near bathroom of Limbidy & Rajputana hostel, repairing of plaster in two room, construction of railing in front of three rooms in Rajputana hostel, repairing of plaster of s. c dey hostel, construction of 6 nos. of watercooler platform in C.V Raman & S.N Bose hostel, P/F 2nos. of washbasin in C.V Raman hostel | 13.09.2024 | 04.10.2024 (5:30 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-16/2024-25/1223 | IWD | Renovation work in first floor Corridor of Workshop area, Rapid solidification lab and Construction of Toilet in First floor in Department of Metallurgical Engineering | 13.09.2024 | 04.10.2024 (5:30 P.M.) | Download BOQ, Corrigendum 11.11.2024 |
| IIT(BHU)/IWD/CT-15/2024-25/1222 | IWD | Construction of new bicycle stand of C.V. Raman & expansion of the area of old bicycle stand of vivekanand, GSMC, Aryabhatta and sewer line of Morvi, vivekanand hostel and Renovation of toilet in A.S.N Bose hostel, P/F of SS mosquito net in Bathrooms in Rajputana hostels & Vishwakarma hostels, P/F of 14 nos of western/Indian commode in C.V. Raman hostel, GSMC, Vishwasraiya & Ramanujan Hostels | 13.09.2024 | 04.10.2024 (5:30 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-14/2024-25/1221 | IWD | Construction of boundary wall with chain link fencing, profile shade, paver block and water supply work and renovation of inside rooms of Dump yard and Construction of chain link fencing in the empty space in front of black smriti shop and Carpentry shop of main workshop and Civil works required in Experimental Mechanics lab | 13.09.2024 | 04.10.2024 (5:30 P.M.) | Download BOQ |
| IIT(BHU)/ PHE/RC-GT/2024-25/02 | Pharmaceutical | GH-PERFORMANCE LIQUID CHROMATOGRAPHY (HPLC) | 13.09.2024 | 03.10.2024 | Download BOQ |
| IIT(BHU)/IWD/ET-18/2024-25/1202 | IWD | Electrical Supply and laying of power cable for underground of overhead line and feed the power supply in various office/lab/workshop with supply, Installation, testing & Commissioning (SITC) of outdoor CPRI certified cubical Feeder pillar in the mining | 12.09.2024 | 03.10.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-17/2024-25/1201 | IWD | SITC of Electrical installation, wiring, illumination, cabeling, power point, light & fan point works in the Vivekanand Hostels | 12.09.2024 | 03.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/ET-13/2024-25/1199 | IWD | SITC of Electrical installation, wiring, illumination, cabeling, power point, light & fan point works in the Visvesvaraya Hostels | 12.09.2024 | 03.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/ME/2024/TD/BP | Mechanical | Long Distance Microscope | 12.09.2024 | 02-10-2024 | Download BOQ |
| IIT(BHU)/IWD/ET-16/2024-25/1192 | IWD | Electrical wiring of various of three phase, single phase power connection power point and light point works and shifting of main power board from carpentry shop to main work shop | 11.09.2024 | 02.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/ET-15/2024-25/1191 | IWD | Electrical Installation, wiring, illumination, power point, light & fan point, in the air pollution control lab, Newley Allocated Laboratory and replacement of electrical main panel board | 11.09.2024 | 02.10.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/ET-14/2024-25/1200 | IWD | SITC of outdoor CPRI certified Electrical cubical main panel in IMD and extension of new Electrical line Division / Department office in the Metallurgical Engg | 11.09.2024 | 02.10.2024 (5:30 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/ACD/2024-25/13 Conv/02 | Academic Affairs | Supply of 999 Purity Gold Plated Silver Alloy Medals with Diameter 2.5" for 13th Convocation. | 11.09.2024 | 25-09-2024 at 17:00 Hrs. | |
| IIT(BHU)/ACD/2024-25/13 Conv/03 | Academic Affairs | Enquiry for Convocation Stole/Uttariya-Reg. | 11.09.2024 | 25-09-2024 at 17:00 Hrs. | |
| IIT(BHU)/ACD/2024-25/13Conv/01 | Academic Affairs | Procurement of Matka Silk Sadri of Different Sizes for 13th Convocation of IIT(BHU) Varanasi to be held on 28th October, 2024 | 10.09.2024 | 30.09.2024 | Download BOQ |
| IIT(BHU)/ME/PS/2024-25/TD/008 | Mechanical | COLD ISOSTATIC PRESS | 10.09.2024 | 01.10.2024 | Download BOQ |
| IIT(BHU)/IPCell/2024-25/CCTV/385 | IP Cell | Campus Surveillance System: Supply, Installation, Testing, Commissioning and Maintenance | 09.09.2024 | 03.10.2024 | Download BOQ, Corrigendum 20.09.2024 Corrigendum 01.10.2024 Corrigendum 09.10.2024 |
| IIT(BHU)/IWD/CT-13/2024-25/1173 | IWD | P/F Aluminium partition, False ceiling, Tile flooring, Painting work and Renovation of Toilet in Department of Humanistic studies | 06.09.2024 | 28.09.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/ET-11/2024-25/1169 | IWD | Electrical wiring, illumination, power point, light & fan point, Main panel board works in the Energy source lab, in Chemical Engineering | 06.09.2024 | 28.09.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-12/2024-25/1168 | IWD | Electrical installation, wiring, illumination, power point, light & fan point works after renovation works in the various rooms & corridor in the Metallurgical Engg | 06.09.2024 | 28.09.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/PH/FY/2024-25/QTN/M/22 | Pharmaceutical | Fluorescence microplate reader | 06.09.2024 | 26-09-2024 | Download BOQ |
| IIT(BHU)/IWD/ET-10/2024-25/1162 | IWD | Electrical work for electrical wiring connection & illuminations works in CCIS | 04.09.2024 | 25.09.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-09/2024-25/1163 | IWD | Electrical installation, wiring, illumination, power point, light, fan point & Replacement of electrical board, fan in room no. 216 and Lab CR-215 & CR-218 in the Ceramic | 04.09.2024 | 25.09.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-08/2024-25/1165 | IWD | Electrical Installation, wiring, illuminations in the lab of Dr. Asha Gupta Lab, M-Tech Lab, Dr Sarvaanakumar Elon Govan, Dr. Rosy lab, Dr. Pandeepwar Makam Lab, Earthing in CIFL Lab & Dr Arindam Indra lab Chemistry | 04.09.2024 | 25.09.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-07/2024-25/1164 | IWD | Electrical Installation, wiring, illumination, power point, light & fan point works in the old building at ground & first floor in Department of SMST | 04.09.2024 | 25.09.2024 (5:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/ET-05/2024-25/1146 | IWD | SITC of Electrical installation, wiring, illumination, cabeling, power point, light & fan point works in the CoW office, S N Bose, Limbdi, Rajputana, Vishvakarma, S. C. Dey, Ramanujam, Dhanarajgiri, Satish Dhawan, Aryabhattya, GSMC old & new, Nivedita Girls and C V | 03.09.2024 | 24.09.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/CHE/RG/2024-25/Tender/38 | Chemical | Supply of Battery Testing System | 02.09.2024 | 20.09.2024 | Download BOQ |
| IIT(BHU)/Che/2024-25/UG/139 | Chemical | Optical Microscope | 02.09.2024 | 19/09/2024 (04:00PM) | Download BOQ |
| IIT(BHU)/IWD/CT-11/2024-25/1129 | IWD | P/L vitrified tile flooring, P/F false ceiling, aluminium partition and painting work of in Air Pollution Control laboratory | 30.08.2024 | 20.09.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-10/2024-25/1137 | IWD | P/F aluminium partition work in COW office, Demolishing of old plaster, water proofing of wall, bathroom wall tiles and badminton court repairing works, construction of cycle stand and replace stair s.s. (304) grade hand railing, granite flooring work | 30.08.2024 | 20.09.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-09/2024-25/1138 | IWD | Construction of interlocking and Renovation work in UG Laboratory, Research Labs | 30.08.2024 | 20.09.2024 (5:00 P.M.) | Download BOQ |
| IIT (BHU)/SMST/2024-25/H2-Retort/ | Materials Science and Technology | High Temperature Controlled Atmosphere Hydrogen Retort Furnace along with Accessory | 29.08.2024 | 18.09.2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/SMST/2024-25/QTN/OH-35/05 | Materials Science and Technology | Magneto Electric Coupling Measurement System | 29.08.2024 | 13.09.2024 ( 04:00 PM) | |
| IIT(BHU)/SMST/2024-25/QTN/OH-35/04 | Materials Science and Technology | Single Vessel Dip Coating System | 29.08.2024 | 13.09.2024 ( 04:00 PM) | |
| IIT(BHU)/SMST/2024-25/QTN/OH-35/03 | Materials Science and Technology | Spare of High Temperature Box Furnace | 29.08.2024 | 13.09.2024 ( 04:00 PM) | |
| IIT(BHU)/SMST/2024-25/QTN/OH-35/02 | Materials Science and Technology | Digital Thickness Monitoring System | 29.08.2024 | 13.09.2024 ( 04:00 PM) | |
| IIT(BHU)/IWD/CT-11/2024-25/1129 | IWD | P/L vitrified tile flooring, P/F false ceiling, aluminium partition and painting work of in Air Pollution Control Lab | 29.08.2024 | 19.09.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/SBChE/2024-25/Lyophilizer/T02/98 | Biochemical | Lyophilizer | 28.08.2024 | 24.09.2024 (04:00 PM) | Download BOQ, Corrigendum 13.09.2024 |
| IIT(BHU)/IPCell/2024-25/TCCF/EoI/327 | IP Cell | Expression of interest (eoi) for supply, installation, integration, and commissioning of thin client-based computing facility (tccf) | 23.08.2024 | 16.09.2024 (4:00 PM) | Corrigendum 06.09.2024, Corrigendum 13.09.2024 |
| IIT(BHU)/PHY/FY/2024-25/QTN/01 | Physics | Arc Melting Furnace | 21.08.2024 | 04.09.2024 | Download BOQ |
| IIT(BHU)/IWD/CT-08/2024-25/1052 | IWD | P/F of aluminium partition, tiles flooring and false ceiling work in composite structure and materials | 19.08.2024 | 10.09.2024 (5:00 P.M.) | Download BOQ, Cancellation of Tender |
| IIT(BHU)/IWD/CT-06/2024-25/1054 | IWD | Providing and fixing of net door profile sheets for guard and false ceiling in Proctor Office and P/f of wooden wall panelling, making of dais, upvc windows and painting work in seminar room | 19.08.2024 | 10/09/2024 (5:00 P.M.) | Download BOQ, Cancellation of Tender |
| IIT(BHU)/IP Cell/2024-25/325 | IP Cell | Leasing out Space for General Store at New faculty apartment | 19.08.2024 | 14.09.2024 (04.00 pm) | Download BOQ, Corrigendum 06.09.2024 |
| IIT(BHU)/CHY/2024-25/Rosy/Battery Cycler | Chemistry | Battery Cycler | 19.08.2024 | 06.09.2024 (04.00 PM) | Download BOQ |
| IIT(BHU)/IWD/ET-06/2024-25/1025 | IWD | Street lighting Works in the various locations of the institute i.e Academic Area , Karmanveer temple road Hyderabad choti gate, between Limbdi Hostel to Rajputana hostel to Satvik mess road, Chief proctor office road and lawn infront of main workshops | 16.08.2024 | 06.09.2024 (5:00 P.M.) | Download BOQ, Cancellation of Tender |
| IIT(BHU)/ChE/RKU/BRNS/01/24-25 | Chemical | High temperature fluidized bed setup with side wall nozzle injection system for gas, decomposing and non-decomposing liquid with RPT stand and oil free air compressor | 16.08.2024 | 04-09-2024 | Download BOQ |
| IT(BHU)/IPCell/2024-25/CCTV/317 | IP Cell | Campus Surveillance System: Supply, Installation, Testing,Commissioning and Maintenance at IIT (BHU) Varanasi | 14.08.2024 | 05-09-2024 | Download BOQ, Corrigendum 03.09.2024 |
| IIT(BHU)/PH/FY/2024-25/QTN/M/20 | Pharmaceutical | Spinal cord impactor | 13.08.2024 | 28-08-2024 | Download BOQ |
| IIT(BHU)/SMST/2024-25/OH-35/01 | School of Materials Science and Technology | DOUBLE BEAM UV-VIS SPECTROPHOTOMETER | 12.08.2024 | 30.08.2024 | Download BOQ |
| IIT(BHU)/IP Cell/BLS-A/2024-25/292 | Institute Purchase Cell | Hiring of Basic Life Support (BLS)Ambulance Vehicle (TYPE-B) | 09.08.2024 | 06.09.2024 (04.00 pm) | Download BOQ, Corrigendum 03.09.2024, Corrigendum 16.08.2024 |
| IIT(BHU)/ PHE/RC-GT/2024-25/01 | Pharmaceutical | High-performance Liquid Chromatography (HPLC) | 07.08.2024 | 04-09-2024 (04:00 PM) | Download BOQ |
| R&D/IIT(BHU) Varanasi SERB/MECH/24-25/02 | Mechanical | UV-VIS-NIR SPECTROPHOTOMETER | 07.08.2024 | 27-08-2024 (04:00 PM) | Download BOQ |
| IIT (BHU)/BME/QTN/2024-25/01 | Biomedical | VIRTUAL REALITY HARDWARE AND SOFTWARE SETUP | 06.08.2024 | 02-09-2024 | Download BOQ, Corrigendum Dated 16.08.2024 |
| IIT(BHU)/BME/QTN/2024-25/02 | Biomedical | Universal Testing Machine (For Mechanical Properties Measurement) | 06.08.2024 | 02-09-2024 | Download BOQ |
| IIT(BHU)/IP Cell/Vehicle/2024-25/281 | Institute Purchase Cell | Hiring of Vehicle- Staff Car (Innova Hycross) | 04.08.2024 | 23.08.2024 (04.00 pm) | Download BOQ |
| IIT(BHU)/IWD/CT-07/2024-25/863 | IWD | Construction of toilet rooms G+1 in Department of Ceramic Engineering. | 02.08.2024 | 23.08.2024 (5:30 P.M.) | Download BOQ |
| IIT(BHU)/ME/2024/TD/BP | Mechanical | Long Distance Microscope | 02.08.2024 | 22-08-2024 | Download BOQ |
| IIT(BHU)/SBChE/24-25/SKS-Project – T01/64 | Biochemical | High Performance Liquid Chromatography System with Accessories | 02.08.2024 | 29/08/2024 | Download BOQ |
| IIT(BHU)/IP Cell/2024-25/280 | IP Cell | Installation, Operation & Maintenance of Automated Vending Machines For Sanitary Napkins | 02.08.2024 | 22.08.2024 (04.00 pm) | Download BOQ |
| IIT(BHU)/IWD/CT-04/2024-25/835 | IWD | Renovation and construction work Required in Department of Mining Engineering. | 30.07.2024 | 20/08/2024 (5:00 P.M.) | Download BOQ Corrigendum Dated 27.08.2024 |
| IIT (BHU)/CIF/2024-25/Twin Jet/63 | CIF | Supply, Installation and Commissioning of Twin Jet Polisher Instrument at CIF, IIT(BHU) Varanasi | 30.07.2024 | 19.08.2024 | Download BOQ |
| IIT(BHU)/IWD/CT-05/2024-25/834 | IWD | P/F wall paneling, upvc windows & door, false ceiling and painting work in server room, Centre for Computing and Information Services (CCIS) | 30.07.2024 | 20/08/2024 (5:00 P.M.) | Download BOQ Corrigendum Dated 27.08.2024 |
| IIT(BHU)/ME/PS/2024-25/TD/003 | Mechanical | Supply of High energy planetary ball mill | 29.07.2024 | 19.08.2024 | Download BOQ |
| IIT(BHU)/IWD/CT-03/2024-25/824 | IWD | Construction of paver block for parking, repair of drain, providing and laying of concrete cover in drain and cable trench work in front of new faculty apartment. | 29.07.2024 | 19/08/2024 (5:00 P.M.) | Download BOQ Corrigendum Dated 27.08.2024 |
| IIT(BHU)/IP Cell/ /2024-25/260 | Institute Purchase Cell | Installation, Operation & Maintenance of Semi Refrigerated Automated Vending Machines For Non-Aerated Soft Drinks & Snacks | 26.07.2024 | 17.08.2024 (04.00 pm) | Download BOQ, Corrigendum Dated 19.08.2024 |
| R&D/SA/ICMR/BME/21-22/04/320 | Biomedical | CARDIAC PULSATILE PUMP | 26.07.2024 | 16.08.2024 | Download BOQ |
| IIT(BHU)/IWD/ET-04/2024-25/808 | IWD | Supply, Installation, Testing, Fixing and mounting of Energy Meter on existing Meter Panel in the Faculty Apartment (C&D Block) | 25.07.2024 | 16.08.2024 (5:30 P.M.) | Download BOQ |
| IIT(BHU)/PH/FY/2024-25/QTN/M/21 | Pharmaceutical | Fluorescence microplate reader | 25.07.2024 | 21.08.2024 | Download BOQ |
| Chy/IIT(BHU)/2024-25/PT/UPWPS/01 | Chemistry | HPLC grade ultra-pure water purification system | 24.07.2024 | 21.08.2024 | Download BOQ |
| IIT(BHU)/IWD/ET-03/2024-25/794 | IWD | Supply, Installing, Testing and Commissioning of ‘Silent Type 125 KVA Diesel Generator' in the Nivedita Girls Hostel, Morvi-II and Faculty Apartment Block C & D | 23.07.2024 | 12.08.2024 (5:30 P.M.) | Download BOQ, Corrigendum Dated 29.07.2024, Cancellation of Tender |
| IIT(BHU)/SBChE/ ASD-Project/2024-25/T01/78 | Biochemical | Liquid Chromatograph with Accessories | 23.07.2024 | 12/08/2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/NKP/SERB/2024-25/7 | Metallurgical | High & Low Temperature Stage for VSM system | 15.07.2024 | 05/08/2024 (04:00 PM) | Download BOQ |
| R&D/IIT(BHU) Varanasi SERB/MECH/24-25/01 | Mechanical | UV-VIS-NIR SPECTROPHOTOMETER | 10.07.2024 | 30-07-2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/Ceramic Engg./Tender/KK/24-25/HTFurnace | Ceramic | High Temperature Atmospheric Controlled Tube furnace | 05.07.2024 | 25.07.2024 | Download BOQ |
| IIT(BHU)/HOSTEL/SD/2024-25/001 | Satish Dhawan Hostel | Providing and fixing of duct lines for section of hot air from burner hood and deliver it to roof top | 03.07.2024 | 09.07.24 | Download BOQ |
| IIT(BHU)/Admin/2024-25/02 | Establishment Section | Cleaning, Sanitation and Disposal of Solid Waste | 27.06.2024 | 18.07.2024 (17:00 Hrs) | Download BOQ |
| IIT(BHU)/ME/PS/2024-25/TD/002 | Mechanical | Battery Testing System (Electro chemical station) | 27.06.2024 | 17.07.2024 | Download BOQ, Corrigendum Dated 05.07.2024 |
| IIT(BHU)/ME/PS/2024-25/TD/001 | Mechanical | Glove Box | 26.06.2024 | 17.07.2024 | Download BOQ |
| IIT(BHU)/ChE/2023-24/JPC/01 | Chemical | Biomass Pyrolysis Setup | 26.06.2024 | 16/07/2024 (04:00 PM) | Download BOQ, Corrigendum Dated 16.07.2024 |
| IIT(BHU)/DRDO/ME/2024-25/TD/001 | Mechanical | High Temperature Microwave Sintering Furnace Suitable for Reducing and Inert Atmosphere | 21.06.2024 | 19.07.2024 | Download BOQ, Corrigendum Dated 05.07.2024 |
| IIT(BHU)/IWD/CT-02/2023-24/563 | IWD | Construction of toilet rooms G+1 in Department of Ceramic Engineering | 20.06.2024 | 11.07.2024 (5:00 P.M.) | Download BOQ,Cancellation Tender |
| Chy/IIT(BHU)/2024-25/PT/UPWPS/01 | Chemistry | HPLC grade ultra-pure water purification system | 19.06.2024 | 04.07.2024 | Download BOQ |
| IIT(BHU)/IPC/Water Cooler/2024-25/191 | Central Purchase Committee | Rate contract for submission of rate for servicing of water cooler, spare parts of all types and makes of water cooler cum purifier with compressor | 18.06.2024 | 08.07.2024 (04.00 pm) | Download BOQ, Corrigendum Dated 05.07.2024 Corrigendum Dated 28.06.2024 |
| IIT(BHU)/IWD/ET-02/2024-25/550 | IWD | Supply, Installation, Testing, Fixing and Mounting of Energy, Meter on existing Meter Panel in the Faculty Apartment (C&D Block) | 18.06.2024 | 08.07.2024 (5:00 P.M.) | Download BOQ, Cancellation of Tender |
| IIT(BHU)/IWD/ET01/2024-25/474 | IWD | Electrical installation wiring & illumination Work in the Limbdi Hostel IIT(BHU) | 14.06.2024 | 05.07.2024 (5:00 P.M.) | Download BOQ, Cancellation of Tender |
| IIT(BHU)/NKP/SERB/2024-25/1 | Metallurgical | Pulsed Magnetizer system | 12.06.2024 | 03/07/2024 (04:00 PM) | Download BOQ, Corrigendum Dated 18.06.2024 |
| IIT(BHU)/NKP/SERB/2024-25/2 | Metallurgical | High & Low Temperature Stage for VSM system | 12.06.2024 | 02/07/2024 (04:00 PM) | Download BOQ, Corrigendum Dated 18.06.2024 |
| IIT(BHU)/IPC/DBW/2024-25/150 | Registrar | Disposal of Biomedical Waste | 12.06.2024 | 26.06.2024 | Download BOQ |
| IIT(BHU)/RAAM2024/2024-25/01 | Mathematical Sciences | Supply and Catering Services for 2nd International Conference on Recent Advances in Applied Mathematics (RAAM 2024) | 06.06.2024 | 20-06-2024 (05:00 PM) | Download BOQ |
| IIT(BHU)/IWD/CT-01/2024-25/424 | IWD | Renovation/ Modification of girls toilet, Demolishing of walls, Cycle parking and Paver block Road in Limbdi Hostel | 06.06.2024 | 27.06.2024 (4:00 P.M.) | Download BOQ, Cancellation Tender |
| IIT(BHU)/ PHE/RC/2024-25/01 | Pharmaceutical | HIGH-PERFORMANCE LIQUID CHROMATOGRAPHY (HPLC) | 05.06.2024 | 25.06.2024 | Download BOQ |
| IIT(BHU)/ PH/SHL/2024-25/01 | Pharmaceutical | Automated Flash Chromatography System | 05.06.2024 | 25.06.2024 | Download BOQ |
| R&D/IIT(BHU) Varanasi CSIR/MET/24-25/03 | Metallurgical | HOT EXTRUSION MACHINE | 04.06.2024 | 24-06-2024 (04:00 PM) | Download BOQ |
| IIT (BHU)/Met-JB/DST-FIST/2024-25/02 | Metallurgical | Supply, installation, demonstration of Analytical Transmission Electron Microscope and Ion Beam Milling System | 04.06.2024 | 01.07.2024 | Download BOQ |
| IIT(BHU)/CeramicEngg./2024-25/MIA/01 | Ceramic | Supply, Installation & Demonstration of Universal Testing Machine with Furnace | 20.05.2024 | 06/06/2024 | Download BOQ |
| R&D/IIT(BHU) Varanasi CSIR/MET/24-25/02 | Metallurgical | HOT EXTRUSION MACHINE | 03.05.2024 | 24-05-2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/Admin/2024-25/01 | Establishment Section | Cleaning, Sanitation and Disposal of Solid Waste | 24.04.2024 | 14.05.2024 (17:00 Hrs) | Download BOQ |
| IIT (BHU)/Met-JB/DST-FIST/2024-25/01 | Metallurgical | Supply, installation, demonstration of Analytical Transmission Electron Microscope and Ion Beam Milling System | 18.04.2024 | 15.05.2024 | Download BOQ |
| R&D/IIT(BHU) Varanasi CSIR/MET/24-25/01 | Metallurgical | HOT EXTRUSION MACHINE | 08.04.2024 | 26-04-2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/I.P.Cell/A.R.C./2023-24/822 | Institute Purchase Cell | Chemical, Glassware, Filter Papers | 22.03.2024 | 11.04.2024 (04.00 pm) | Download BOQ, Corrigendum Dated 08.04.2024 |
| IIT(BHU)/Che/2022-23/UG/148 | Chemical | High speed camera | 13.03.2024 | 02/04/2024 (04:00PM) | Download BOQ |
| IIT(BHU)/IPC/Air Conditioners/2023-24/804 | Central Purchase Committee | Rate contract for submission of rate for camc, servicing of acs, spare parts of all types and makes of air conditioners | 12.03.2024 | 25.03.2024 (04.00 PM) | Download BOQ, Corrigendum Dated 20.03.2024 |
| IIT (BHU)/CIF/2023-24/157 | Central Instrument Facility (CIF) | Supply and installation of Auto Sampler for Bruker 500 MHz NMR Instruments | 11.03.2024 | 21.03.2024 (04.00 PM) | Download BOQ, Cancellation Tender |
| IIT(BHU)/Admin/2023-24/03 | Registrar, IIT (BHU) | Cleaning, Sanitation and Disposal of Solid Waste | 11.03.2024 | 29.03.2024 (17:00 Hrs) | Download BOQ |
| IIT(BHU)/IWD/ET-38/2023-24/2771 | IWD | Supply, Installation, Testing, Fixing and Mounting of Energy, Meter on existing Meter Panel in the Faculty Apartment (C&D Block) | 06.03.2024 | 27.03.2024 (4:00 P.M.) | Download BOQ, Cancellation |
| IIT(BHU)/IWD/CT-103/2023-24/2756 | IWD | Providing and fixing of aluminium partition work Glass chamber in Mine Environment Laboratory | 05.03.2024 | 26.03.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/Physics/SC/2023-24/QTN/01 | Physics | High Pressure Cell | 04.03.2024 | 16-03-2024 | Download BOQ |
| IIT(BHU)/CED/VA/2023-24/0001 | Civil | Accelerated Carbonation Curing Chamber with Accessories | 04.03.2024 | 22/03/2024 | Download BOQ |
| IIT(BHU)/IWD/CT-101/2023-24/2702 | IWD | Removing old distemper and Oil bound distemper painting works in Common Area Corridor, Prof. M.P. Netarwala Memorial Hall & Mine Planning and Design Division Hall of the Department of Mining Engineering. | 01.03.2024 | 22.03.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-95/2023-24/2700 | IWD | Construction of toilet rooms G+1 in Department of Ceramic Engineering | 01.03.2024 | 22.03.2024 (5:00 P.M.) | Download BOQ Cancellation |
| IIT(BHU)/IWD/CT-102/2023-24/2703 | IWD | P/F aluminium partition, making of platform and painting work of in laboratory, P/L tiles flooring, repair to patch plaster with water proofing compound and painting work in Department of Chemical Engineering, P/F aluminium partition and door work in lab | 01.03.2024 | 22.03.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-97/2023-24/2701 | IWD | Renovation of 4 nos toilet GF & FF in Department of Ceramic & 2 nos toilet in Department of Chemical and construction of drain & drain chamber behind Vivekanand & Vishwakarma Hostel and construction of sewer line, chamber & covering works at Aryabhatta Hostel | 01.03.2024 | 22.03.2024 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/COE/MTD/2023-24/TD/013 | CoE on Machine Tools Design | Program Controlled Tabletop Induction Melting machine for the Centre of Excellence on Machine Tools Design | 28.02.2024 | 20.03.2024 | Download BOQ |
| IIT(BHU)/CE/2023-24/SaM/SRG/4528 | Civil | Vibration Sensors, Inertial Measurement Units (Imu) With Multi-input Data Logger | 27.02.2024 | 19.03.2024 | Download BOQ |
| IIT(BHU)/IWD/CT-98/2023-24/2669 | IWD | Providing and fixing of 10 nos. collapsible steel shutters, grills and painting work in various place of Acadamic area | 27.02.2024 | 19.03.2024 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-100/2023-24/2671 | IWD | Providing and fixing of Aluminium partition and painting work | 27.02.2024 | 19.03.2024 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-99/2023-24/2670 | IWD | PF aluminium partition work on First Floor (Right side) and Installation of power, light electrical board with wiring and connection in the Computer lab | 27.02.2024 | 19.03.2024 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-37/2023-24/2672 | IWD | Electrical installation, illuminations and wiring for development of Carpentry Shop of Main Workshop building establishment of DRDO Industry AcademiaCentre of Excellence (DIA-COE) | 27.02.2024 | 19.03.2024 (4:00 P.M.) | Download BOQ, Cancellation of Tender |
| IIT (BHU)/Budget/CA/2024-25/01 | Registrar, IIT (BHU) | Hiring of services of Chartered Accountant firms for the F.Y. 2024-25 | 24.02.2024 | 04.03.2024 (16:00 Hrs) | Download BOQ |
| IIT(BHU)/COE/MTD/2023-24/TD/012-R | CoE on Machine Tools Design | Coordinate Measuring Machine with Non-Contact Measurement for the Centre of Excellence on Machine Tools Design | 21.02.2024 | 09.03.24 | Download BOQ |
| IIT(BHU)/IWD/CT-94/2023-24/2662 | IWD | P/F aluminium partition, false Ceiling, pvc flooring, and panting work and Construction of cement concrete road, work of Carpentry Shop of Main Workshop for the establishment of DRDO industry Academia-Centre of Excellence (DIA-COE) | 20.02.2024 | 12.03.2024 (4:00 P.M.) | Download BOQ, Cancellation of Tender |
| IIT(BHU)/MEC-RT/DRDO/2023-24/TD/011 | Mechanical | High Temperature Vacuum Graphite Furnace 2000 ℃ | 16.02.2024 | 08.03.24 | Download BOQ |
| IIT(BHU)/IWD/ET-35/2023-24/2574 | IWD | Supply, Installation of Electric panel with power cable to energize the ductable Acs Installed on the Ground Floor of Shreenivas Deshpande Library | 15.02.2024 | 07.03.2024 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-36/2023-24/2573 | IWD | Electrification for central power backup system in the Pharmacetucal Engineering | 15.02.2024 | 07.03.2024 (4:00 P.M.) | Download BOQ, Corrigendum |
| :IIT (BHU)/CIF/2023-24/142 | Central Instrument Facility | Supply and installation of Nanomechanical Testing System | 15.02.2024 | 06/03/2024 | Download BOQ, Cancellation Tender |
| IIT(BHU)/SBME/Paik/01 | Biomedical | Supply, Installation and Commissioning of: “Small Animal Anesthesia system (with all accessories) | 13.02.2024 | 05.03.2024 (04.00 PM) | Download BOQ |
| IIT(BHU)/IPC/RO/2023-24/735 | Central Purchase Committee | Procurement of 85 nos. of RO Water Cooler | 12.02.2024 | 19-02-2024 | Download BOQ |
| IIT(BHU)/COE/MTD/2023-24/TD/011-R | Centre of Excellence on Machine Tools Design | Automatic Polishing Machine for Metallography Sample Preparation for the Centre of Excellence on Machine Tools Design | 12.02.2024 | 01.03.2024 | Download BOQ |
| IIT (BHU)/CIF/2023-24/112 | Central Instrument Facility | Supply and installation of Auto Sampler for Bruker 500 MHz NMR Instruments | 07.02.2024 | 28/02/2024 | Download BOQ |
| IIT(BHU)/PHY/RKS/QTN/23-24/119 | Physics | Monochrome CMOS sensor and Motorized Flip mount | 06.02.2024 | 26-02-2024 | Download BOQ |
| IIT(BHU)/Physics/RKS/2023-24/QTN/118 | Physics | Supply of Consumables | 02.02.2024 | 23-02-2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/Physics/BB/2023-24/QTN/01 | Physics | 18GHz 2-Port RF Vector Network Analyzer (VNA) | 31.01.2024 | 20-02-2024 | Download BOQ |
| IIT (BHU)/I.P. Cell/Tender-NW/23-24/687 | Institute Network Infrastructure Committee | Supply, Installation, Commissioning & Testing of Extension of the Existing Network | 23.01.2024 | 20.02.2024 | Download BOQ, Corrigendum Dated 15.02.2024 |
| IIT(BHU)/CSE/2023-24/555 | Computer Science & Engineering | Supply & Installation of GPU based Server | 23.01.2024 | 20.02.2024 | Download BOQ |
| IIT(BHU)/IWD/CT-96/2023-24/2375 | IWD | Providing and fixing of 10 nos. collapsible steel shutters, grills and painting work in various place of Acadamic area | 19.01.2024 | 09.02.2024 (4:00 P.M.) | Download BOQ Corrigendum Dated 19.02.2024 |
| IIT(BHU)/COE/MTD/2023-24/TD/012 | CoE on Machine Tools Design | Coordinate Measuring Machine with Non-Contact Measurement | 17.01.2024 | 07.02.2024 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/ET-33/2023-24/2355 | IWD | Electrical installation, illuminations and wiring for development of Carpentry Shop of Main Workshop building establishment of DRDO Industry AcademiaCentre of Excellence (DIA-COE) IIT(BHU) | 17.01.2024 | 06.02.2024 (4:00 P.M.) | Download BOQ Corrigendum Dated 19.02.2024 |
| IIT(BHU)/IWD/ET-34/2023-24/2354 | IWD | Electrical work various department, main panel/board outside the glass lab in department of Chemical Engineering & Technology , Newly Joint faculty at room no.CR207 Ceremic Engineerring , Ceiling lighting in Dr. Sanjay Katheria Camber Department of Chemical | 17.01.2024 | 06.02.2024 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/COE/MTD/2023-24/TD/011 | Mechanical | Automatic Polishing Machine for Metallography Sample Preparation for the Centre of Excellence on Machine Tools Design | 16.01.2024 | 06.02.2024 | Download BOQ |
| IIT(BHU)/SBME/FY/2023-24/QTN/02 | Biomedical | EEG MACHINE AND STIMULATION PRESENTATION SOFTWARE | 16.01.2024 | 12-02-2024 | Download BOQ |
| IIT (BHU)/BME/QTN/2023-24/05 | Biomedical | MULTIMODAL PHYSIOLOGICAL DATA ACQUISITION SYSTEM | 16.01.2024 | 12-02-2024 | Download BOQ |
| IIT(BHU)/ PH/DKR/2023-24/19 | Pharmaceutical | Portable Nanocoulomb Meter with Faraday Cup | 12.01.2024 | 03.02.2024 | Download BOQ |
| IIT(BHU)/IWD/ET-32/2023-24/2301 | IWD | Electrical works in the under construction faculty chamber (Total number of chamber-05) Deparment of Architecture ,Planing & Design and Chemical Engineering & Technology (Dr.Sweta Singh lab) | 12.01.2024 | 01.02.2024 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/CED/Struct./2023-24/3064 | Civil | Hydraulic Jack with Accessories | 11.01.2024 | 31/01/2024 | Download BOQ |
| IIT(BHU)/CED/H&WRE/2023-24/3287 | Civil | Supply, Installation and Commissioning of Modernisation of Flume-Phase- | 10.01.2024 | 30.01.2024 (04.00 PM) | Download BOQ |
| IIT(BHU)/Chemical Engg./RKU/DST/01/2023-24/22 | Chemical | Magnetron Sputtering | 09.01.2024 | 30-01-2024 | Download BOQ |
| IIT(BHU)/PH/FY/2023-24/QTN/Animal House/38 | Pharmaceutical | Small Animal Waste Incinerator (Rat/ Mice) | 08.01.2024 | 27.01.2024 | Download BOQ, Corrigendum Dated 29.01.2024 |
| IIT(BHU)/PHY/RKS/QTN/23-24/114 | Physics | Monochrome CMOS sensor and Motorized Flip mount | 05.01.2024 | 25-01-2024 | Download BOQ |
| IIT(BHU)/IPC/RO/2023-24/633 | Central Purchase Committee | Procurement of 80 nos. of RO Water Cooler | 04.01.2024 | 24-01-2024 | Download BOQ, Corrigendum Dated 04.01.2024 |
| IIT(BHU)/IWD/CT-93/2023-24/2222 | IWD | Construction of the Central Animal House Facility and Electrical wiring, illumination,power point,light & fan point and ducting works | 02.01.2024 | 23.01.2024 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/MIN/SERB/SKP/02 | Mining | Intrinsically Safe Camera | 01.01.2024 | 19.01.2024 (04.00 PM) | Download BOQ |