Ref. No.Dept. NameDescriptionUpload DateClosing DateAttachments
IIT (BHU))/IWD/ET-24/2019-20/ 1936Institute Works DepartmentSupply, installation, testing and commissioning of outdoor type power distribution panel or power rearrangement in GTAC, IIT(BHU)​ 24/12/201931/12/2019 till 15:00 hrs.
IIT (BHU))/IWD/ET-23/2019-20/1935Institute Works DepartmentStreet lighting work from IIT Square to Dhanrajgiri Square, IIT (BHU) 
Corrigendum Cancellation, Dated: 12.02.2020 
24/12/201931/12/2019 till 15:00 hrs.
IIT (BHU))/IWD/ET-22/2019-20/1934Institute Works DepartmentSupply, installation, testing and commissioning Battery Charger and Battery Bank in vivekanand DSS, IIT (BHU) 24/12/201931/12/2019 till 15:00 hrs.
IIT (BHU))/IWD/ET-21/2019-20/1933​Institute Works DepartmentSupply and laying of LT power cable from DSS A to SMST building​ 
Corrigendum, Dated 01.01.2020 
24/12/201906/01/2020 till 15:00 hrs.
IIT (BHU))/FPC/2019-20/001​Registrar Office, IIT (BHU) VaranasiTender for Rate contract for supply of furniture Items. 24/12/201913/01/2020 upto 15:00 Hrs.
IIT (BHU))/MET/CKB/SERB/19-20/EQP/01​Metallurgical EngineeringSupply of DC Magnetron Sputtering system​. 20/12/201915.01.2020 (03:00 PM).Download BOQ 
IIT (BHU))/EC/ MT/19-20/571​Electronics Engineering​Supply of “Tower Workstations”​. 17/12/201909/01/2020, up to 12:00 PM​.Download BOQ 
IIT (BHU)/IWD/ET-20/2019-20/1878​Institute Works DepartmentSupply, installation, testing and commissioning of outdoor type Power Distribution Panel near Main Library Crossing​. 17/12/201924/12/2019 till 15:00 hrs
IIT (BHU)/MIN/QTN/2505​Mining EngineeringMechanical Vane Anemometer​ 12/12/201926/12/2019
IIT (BHU)/PH/FY/2019-20/QTN/AK/01​Pharmaceutical EngineeringSupply and Installation of Workstation Computer/Server 12/12/201902/01/2020 at 03:00 P.M
IIT (BHU)/ME/2019-20/JS/IMP/QTN/1​Mechanical EngineeringFourier Transform Infrared (FTIR) Spectrometer setup​. 06/12/201930/12/2019, up to 15.00 Hrs.Download BOQ 
IIT (BHU)/Met/SERB/VJ/19-20/26​Metallurgical EngineeringHigh-temperature high vacuum furnace 
Corrigendum, Dated 17.12.2019 
29/11/201921.12.2019, up to 05.00 PMDownload BOQ 
IIT (BHU)/R&D/SERB/Met/19-20/02A​Metallurgical EngineeringControlled-Atmosphere High Temperature Furnace​ 
Corrigendum, Dated 18.12.2019 
Corrigendum, Dated 24.12.2019 
28/11/201904.01.2020 03.00 PMDownload BOQ 
IIT (BHU)R&D/SERB/Met/19-20/02B​Metallurgical EngineeringOnline Multi-Gas Analyser
Download BOQ 
28/11/201919.12.2019 03.00 PMDownload BOQ 
IIT (BHU)/R&D/SA/Electronice/DRDO/QTN/2019-20/01​Electronics EngineeringTower Workstation should have the following features​ 25/11/201914/12/2019
IIT (BHU)/SMST/2019-20/ENQ/Multimeter, Source meter/359 to 363​School of materials science and technologyEnquiry inviting quotation for Current source, nanovoltmeter and digital multimeter to use with thermopower measurement system​ 22/11/201909/12/2019, 14.00 Hrs
IIT (BHU)/R&D/SERB/ChE/19-20/02/Eq1Chemical Engineering​Supply of a Photovoltaic Spectrometer (A PV-Device Spectral Characterization System for Internal & External Quantum Efficiency)​. 
Corrigendum, Dated 20.12.2019 
22/11/201904/01/2020, 15.00 HrsDownload BOQ 
IIT (BHU)/CER/2019-20/ECR/AKD/EMRCeramic EngineeringSupply of “Elisa Micro-plate Reader with Accessories”​ 21/11/201909-12-2019 (03:00 PM)Download BOQ 
IIT (BHU)/R&D/BRNS/Chy/19-20/01/A​ChemistryPC based Double Beam solid state UV-VIS Diffuse reflectance Spectrophotometer for powder/ film sample measurement, working on 220V, 50Hz with variable bandwidth manufactured by an ISO 9001, ISO-14001 certified company, working on 32 bit software.
Corrigendum, Dated 17.12.2019 
21/11/201931.12.2019, up to 16:00 PMDownload BOQ 
IIT (BHU)/ME/PS/19-20/TD/02​​Mechanical EngineeringSpecifications & quantity of the item​ 19/11/201910/12/2019, 16.00 HrsDownload BOQ 
IIT (BHU)/IWD/CT-51/2019-20/1712​Institute Works DepartmentProviding and fixing of door shutter with frame in first floor rooms almirah in S.C. De Hostel 
Corrigendum, Dated 28.11.2019 
Corrigendum, Dated 05.12.2019 
Corrigendum, Dated 11.12.2019 
Cancellation, Dated 10.02.2020 
19/11/201916/12/2019 (03:00) PM
IIT (BHU)/IWD/ET-12/2019-20/1713​​Institute Works DepartmentSupply and laying of LT power cable from IT DSS to Feeder Pillar, Near Library Square 
Corrigendum, Dated 05.12.2019 
19/11/201909/12/2019 (03:00) PM
IIT (BHU)/IWD/ET-13/2019-20/1714​Institute Works DepartmentIllumination works from Rajputana Hostel Feeder Pillar to Vishwasareya Square 19/11/201925/11/2019 (03:00) PM
IIT (BHU)/IWD/ET-14/2019-20/1715​Institute Works DepartmentSupply and installation of outdoor Feeder Pillar near Library Square for feeding power to TLC Building, Library and ABLT 19/11/201925/11/2019 (03:00) PM
IIT (BHU)IWD/ET-15/2019-20/1716​Institute Works DepartmentSupply and Laying of LT power cable from IT DSS to TLC building, Library extension and ABLT extension 19/11/201925/11/2019 (03:00) PM
IIT (BHU)/IWD/ET-16/2019-20/1717​​Institute Works DepartmentIllumination work in badminton court of Vishwakarma Hostel 19/11/201925/11/2019 (03:00) PM
IIT (BHU)/IWD/ET-17/2019-20/1718​​Institute Works DepartmentElectrical Work in the 47 rooms and corridor of First Floor (North Wing) in Dhanrajgiri Hostel 19/11/201925/11/2019 (03:00) PM
IIT (BHU)/IWD/ET-18/2019-20/1719​Institute Works DepartmentElectrical work in Intre Demonstration lab of main workshop 
Corrigendum Cancellation, Dated: 26.02.2020​ 
19/11/201925/11/2019 (03:00) PM
IIT (BHU)/IWD/ET-19/2019-20/1720​Institute Works DepartmentIllumination work of inside courtyard and outside parking area of Aryabhatta, GSMC New, S.C. De, Saluja Boys and Vivekanand Hostel​ 19/11/201925/11/2019 (03:00) PM
IIT (BHU)/EE/2019-20/300​Electrical EngineeringPlease submit your lowest quotation for supplying the under mentioned items. 
Annexure(s) I-B 
Annexure(s) I-C 
13/11/201928/11/2019
IIT (BHU)/Che/19-20/QTN/131Chemical EngineeringQuotation Enquiry Fuel Cell Stack Hardware​ 
Annexure(s) I-B 
Annexure(s) I-C 
08/11/201928/11/2019
IIT (BHU)/Che/19-20/TD/128Chemical EngineeringSupply of following equipments. 30/10/201920/11/2019, 15.00 Hrs.Download BOQ 
IIT (BHU)/3DP/Polymer/002Chairman, Committee for 3D printer, Department of Mechanical EngineeringQuotation Inquiry for High Strength Colour Polymer 3D Printer 24/10/201914.11.2019 (up to 03:00 PM)Download BOQ 
IIT (BHU)/3DP-Metal/001Chairman, Committee for 3D printer, Department of Mechanical EngineeringQuotation Inquiry for Metal 3D Printer 
Corrigendum, Dated 19.11.2019 
24/10/201921.11.2019 (up to 03:00 PM)Download BOQ 
IIT(BHU)/ChE/19-20/VS/18Department of Chemical EngineeringQuotation Inquiry for Fluidised Bed Reactor 
Annexure(s) I-B 
Annexure(s) I-C 
24/10/201914/11/2019
IIT(BHU)/IWD/CT-35/2019-20/1342Institute Works Department, IIT(BHU), VaranasiWater proofing treatment of roof and repairing of patch plaster, Finishing walls with Acrylic Smooth exterior (outer wall) in Department of Electronics, IIT(BHU), Varanasi. 22/10/201913/11/2019 up to till 15:00 hrs.Download BOQ 
IIT(BHU)/IWD/CT-46/2019-20/1362Institute Works Department, IIT(BHU), VaranasiConstruction of Light Weight Structure for (with puff panel roofing/ puff panel walls) including internal false ceiling and vitrified tiles flooring on the fluid mechanics building for Architecture Engineering Department, IIT(BHU) Varanasi. 
Corrigendum, Dated 23.10.2019 
Corrigendum, Dated 15.11.2019 
Corrigendum, Dated 22.11.2019 
22/10/201928.11.2019 till 3:00 PM​Download BOQ 
IIT(BHU)/IWD/CT-47/2019-20/1380Institute Works Department, IIT(BHU), VaranasiRemoving of old Asbestos sheet & P/F puff panel roofing, false ceiling, tiles flooring and painting work of ID Lab of Main workshop, IIT (BHU) Varanasi. 
Corrigendum, Dated 23.10.2019 
Corrigendum, Dated 15.11.2019 
22/10/201921.11.2019 till 3:00PM.Download BOQ 
IIT(BHU)/IWD/CT-48/2019-20/1381Institute Works Department, IIT(BHU), VaranasiConstruction of Light Weight Structure for (with puff panel roofing/ puff panel walls) including internal false ceiling and vitrified tiles flooring (Left & Right side) on the Second floor in Department of Physics, IIT (BHU), Varanasi. 
Corrigendum, Dated 23.10.2019 
Corrigendum, Dated 22.11.2019 
Corrigendum, Dated 01.01.2021 
22/10/201928.11.2019 till 3:00 PM​Download BOQ 
IIT(BHU)/IWD/CT-49/2019-20/1382Institute Works Department, IIT(BHU), VaranasiProviding & fixing Corrugated puff panel roofing after removing of old G.I. profile sheet of Production lab in Department of Mechanical Engineering, IIT(BHU), Varanasi.​ 
Corrigendum, Dated 23.10.2019 
Corrigendum, Dated 15.11.2019 
Corrigendum, Dated 22.11.2019 
Corrigendum, Dated 01.01.2021 
22/10/201928.11.2019 till 3:00 PM​Download BOQ 
IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/22Dean (Academic Affairs) Office.Quotations for Stall for Poster Display 18/10/201927/10/2019.
IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/21Dean (Academic Affairs) Office.Quotations for Illumination of Buildings with LED focus Lights 18/10/201927/10/2019.
IIT(BHU)/IWD/CT-33/2019-20/1361Institute Works DepartmentConstruction of slab above staircase opening, providing and fixing of aluminum partition in the chamber of Dr. Naval Kishor, repairing of plaster, scrapping and painting of passage and staircase of all floor of Mining Engineering. 
Download BOQ 
Corrigendum, Dated 11.11.2019 
Corrigendum, Dated 19.11.2019 
Corrigendum, Dated 26.11.2019 
Corrigendum, Dated 29.11.2019 
Corrigendum, Dated 06.12.2019 
Corrigendum, Dated 13.12.2019 
Cancellation: Dated 10.08.2021 
18/10/201905/11/2019 up to till 15:00 hrs
IIT(BHU)/IWD/CT-50/2019-20/1383Institute Works DepartmentConstruction of profile shed for patrolling vehicle parking at proctor office, IIT(BHU) 
Corrigendum, Dated 29.10.2019 
Corrigendum, Dated 04.11.2019 
Corrigendum, Dated 15.11.2019 
Corrigendum, Dated 25.11.2019 
Cancellation: Dated 05.12.2019 
18/10/201928.11.2019 till 3:00 PM
IIT(BHU)/IWD/ET-11/2019-20/1384Institute Works DepartmentSupply, installation, testing and commissioning of Battery Charger and Battery Bank in IWD, IIT (BHU) Varanasi 
Corrigendum, Dated 29.10.2019 
Corrigendum, Dated 04.11.2019 
Corrigendum, Dated 15.11.2019 
Corrigendum, Dated 25.11.2019 
18/10/201925.11.2019 till 3:00PM
IIT (BHU)/IWD/2019-20/1377Registrar Office, IIT (BHU) VaranasiComprehensive Design Engineering, Construction & Development of Students’ Hostels and Faculty Apartments at IIT(BHU), Varanasi. 
Download BOQ 
Corrigendum, Dated 07.11.2019 
Corrigendum, Dated 13.11.2019 
17/10/201921/11/2019 at 4:00 P.M
IIT(BHU)/IWD/CT-30/2019-20/1316Institute Works DepartmentProviding & laying vitrified tile flooring, false ceiling, aluminium partition and Painting work in Engineering Geo-science lab of Department of Civil Engineering, IIT(BHU), Varanasi 15/10/201905/11/2019 up to till 15:00 hrsDownload BOQ 
IIT(BHU)/IWD/CT-31/2019-20/1317Institute Works DepartmentP/F of Aluminum partition, Granite flooring, false ceiling in Electrical Machines and Drive lab in Electrical Engg 15/10/201905/11/2019 up to till 15:00 hrsDownload BOQ 
IIT(BHU)/IWD/CT-32/2019-20/1318Institute Works DepartmentRenovation of toilet at 1st floor & 2nd floor & Construction of chain link fencing in front of porch (From north side to west side) of Mining Engineering 15/10/201905/11/2019 up to till 15:00 hrsDownload BOQ 
IIT(BHU)/IWD/CT-34/2019-20/1319Institute Works DepartmentP/F aluminium partition work for 7 nos rooms (at first floor) in production lab in Department of Mechanical Engineering 15/10/201905/11/2019 up to till 15:00 hrsDownload BOQ 
IIT(BHU)/IWD/CT-36/2019-20/1320Institute Works DepartmentWater proofing treatment of roof of Department of Metallurgical Engineering 15/10/201905/11/2019 up to till 15:00 hrs
IIT(BHU)/IWD/CT-37/2019-20/1321Institute Works DepartmentRepair to patch plaster, P/A of acrylic smooth exterior paint outer side in Varandah and distempering with oil bound distemper of Mess area, common place (Visitor room, Staircase & toilets) of S. Ramanujan Hostel 15/10/201905/11/2019 up to till 15:00 hrsDownload BOQ 
IIT(BHU)/IWD/CT-38/2019-20/1322Institute Works DepartmentP/F aluminium partition, false ceiling, tile flooring, construction working platform with granite and painting work in Pharmaceutical Chemistry Lab Room No. 1 
Corrigendum, Dated 06.11.2019 
Corrigendum, Dated 15.11.2019 
Corrigendum, Dated 22.11.2019 
Corrigendum, Dated 29.11.2019 
Corrigendum, Dated 06.12.2019 
Corrigendum, Dated 13.12.2019 
15/10/201919.12.2019 at 3:00 P.MDownload BOQ 
IIT(BHU)/IWD/CT-39/2019-20/1323Institute Works DepartmentSpecial repair of Slab and beam (Guniting work) of front & back side Corridor and left & right side corridor (at 1st floor) and painting work, Rampur Hall and Control system & Network Lab 
Download BOQ 
15/10/201921.11.2019 till 3:00 PM
IIT (BHU)/IWD/CT-40/2019-20/1324Institute Works DepartmentRepairing to patch plaster & chajja, Removing of painting and Finishing walls with Acrylic Smooth exterior (outer wall) of Production lab, new Building and old Building (including Office, drawing section, fluid mechanics, Tribology lab, Dynamics lab, CIMS and Ergonomic Labs) 15/10/201905/11/2019 up to till 15:00 hrsDownload BOQ
IIT (BHU)/IWD/CT-29/2019-20/1341Institute Works DepartmentGuniting of rooms between room no- 01 to 94 (Ground Floor) & room no- 95 to 141 (First Floor, Left side), painting with OBD, doors & windows repairing 15/10/201905.12.2019 at 3:00 PMDownload BOQ
IIT (BHU)/IWD/CT-43/2019-20/1343Institute Works DepartmentRenovation of Kitchen Block Including Dismantling Old Window & Door, P/F of uPVC Window & Panelled Door, P/L Vitrified Tiles, Plastering of Wall, Putty and Distempering at Ground Floor 15/10/201905/11/2019 up to till 15:00 hrsDownload BOQ
IIT (BHU)/IWD/CT-44/2019-20/1344Institute Works DepartmentRenovation of Kitchen Block Including Dismantling Old Window & Door, P/F of uPVC Window & Panelled Door, P/L Vitrified Tiles, Plastering of Wall, Putty and Distempering at Ground Floor 15/10/201905/11/2019 up to till 15:00 hrsDownload BOQ
IIT (BHU)/IWD/CT-41/2019-20/1345Institute Works DepartmentRenovation of toilet (in front of Class rooms G-1 and at office area) in Department of Civil Engineering, IIT(BHU) Varanasi 14/10/201925.11.2019 till 3:00 PM-
IIT (BHU)/IWD/CT-42/2019-20/1346Institute Works DepartmentWater proofing work of existing old roof in mess area of Rajputana Hostel & others IIT(BHU), Varanasi 14/10/201918.10.2019 (03:00 PM)-
IIT (BHU)/IWD/CT-45/2019-20/1347Institute Works DepartmentRenovation of toilet (GF&FF) office of the Department of Mechanical Engineering, IIT(BHU) Varanasi 14/10/201925.11.2019 till 3:00PM-
IIT (BHU)/IPCell/e-Auction/2019-20/492Institute purchase cellDisposal of unserviceable stores /goods lying at departments of IIT(BHU) 11/10/201901-11-2019 (04:00 PM)Download BOQ
IIT (BHU)/IPCell/e-Auction/2019-20/493Institute purchase cellDisposal of unserviceable stores /goods lying at Main Workshop 11/10/201901-11-2019 (04:00 PM)Download BOQ
IIT (BHU)/IPCell/e-Auction/2019-20/494Institute purchase cellDisposal of unserviceable stores /goods lying at Department of Mechanical Engineering 11/10/201901-11-2019 (04:00 PM)Download BOQ
IIT(BHU)/IWD/19-20/1306Institute Works DepartmentDocument for Empanelment of architects cum consultant 11/10/201931-10-2019 (04:00 PM)Download BOQ
IIT(BHU)/EOI/2019-20/PPC/01Press and publicity CommitteeRequest for Expression of Interest for Media Outreach Proposal 10/10/201931-10-2019 (04:00 PM)-
IIT(BHU)/CT-17/2019-20/1271Institute Works DepartmentWater proofing work of existing old roof in mess area of Rajputana Hostel and others 09/10/201916.10.2019 at 3:00 PM-
IIT(BHU)/IWD/CT-22/2019-20/1272Institute Works DepartmentProviding and fixing of door shutter with frame in S.C. De Hostel rooms 09/10/201916.10.2019 at 3:00 PM-
IIT(BHU)/IWD/CT-23/2019-20/1273Institute Works DepartmentConstruction of guard post at Gandhi Smriti crossing 09/10/201916.10.2019 at 3:00 PM-
IIT(BHU)/IWD/CT-24/2019-20/1274Institute Works DepartmentProviding and fixing aluminium partition, false ceiling and painting work in Room No. 9 09/10/201916.10.2019 at 3:00 PM-
IIT(BHU)/IWD/CT-25/2019-20/1275Institute Works DepartmentAluminium partition, false ceiling and renovation works in Room No. 10 and toilets 09/10/201916.10.2019 at 3:00 PM-
IIT(BHU)/IWD/CT-26/2019-20/1276Institute Works DepartmentAluminium partition work in Room No (F-3, F-4 & F-5) at first floor 09/10/201916.10.2019 at 3:00 PM-
IIT(BHU)/IWD/CT-27/2019-20/1277Institute Works DepartmentBoundary wall repair, grill refixing, plastering and badminton court construction at Aryabhatta-II Hostel 09/10/201916.10.2019 at 3:00 PM-
IIT(BHU)/IWD/CT-28/2019-20/1278Institute Works DepartmentRepair to plaster, waterproofing coating, distempering and exterior painting of Aryabhatta Hostel-II 09/10/201916.10.2019 at 3:00 PM-
IIT(BHU)/IWD/ET-04/2019-20/1268Institute Works DepartmentArea lighting work of Volleyball Girls court at Rajputana Ground 04/10/201910.10.2019 at 3:30 PM-
IIT(BHU)/IWD/ET-05/2019-20/1267Institute Works DepartmentArea lighting work of Handball court in Gymkhana Ground 04/10/201910.10.2019 at 3:30 PM-
IIT(BHU)/IWD/ET-06/2019-20/1266Institute Works DepartmentArea lighting work of Kho-Kho and Lawn Tennis courts 04/10/201910.10.2019 at 3:30 PM-
IIT(BHU)/IWD/ET-07/2019-20/1265Institute Works DepartmentArea lighting work of Kabaddi and Basketball courts 04/10/201910.10.2019 at 3:30 PM-
IIT(BHU)/IWD/ET-08/2019-20/1264Institute Works DepartmentArea lighting work of Cricket practice net and Boxing court 04/10/201910.10.2019 at 3:30 PM-
IIT(BHU)/IWD/ET-09/2019-20/1270Institute Works DepartmentElectrical wiring and illumination works in Lab No 1, Pharmaceutical Engineering 04/10/201918.10.2019 till 3:00 PM-
IIT(BHU)/IWD/ET-10/2019-20/1269Institute Works DepartmentSupply, installation and commissioning of LT power distribution panel 04/10/201910.10.2019 at 3:30 PM-
IIT(BHU)/CE/2019-20/1610Civil EngineeringSupply of “Flow Tracker II Lab ADV” 04/10/201920-10-2019 (05:00 PM)Download BOQ
IIT(BHU)ChE/2019-20/QTN/105Chemical Engineering & Tech.Quotation Enquiry for Fuel Cell Stack Hardware 04/10/201925-10-2019-
IIT(BHU)/IP Cell/Vehicle/2019-20/477Registrar, IIT (BHU)Hiring of vehicle rate 04/10/201914-10-2019 (15:00 hrs)-
IIT(BHU)/ChE/2019-20/QTN/99Chemical Engineering & Tech.Supply of Digital Mass Flow Controllers for H2 and O2 gases 01/10/201922-10-2019-
IIT(BHU)/CSE/2019-20/337 (Re-Tender)Computer Science and EngineeringSupply, Installation of Equipment and Setup of Networking LAB (Re-Tender) 11/09/201909-10-2019 (15:00 Hrs)Download BOQ
IIT(BHU)/Gym/SKT/2019-20/186Gymkhana IIT (BHU)Sound Light & Tent services for Spardha, Kashiyatra & Technex 30/09/201911-10-2019 (04:00 PM)-
IIT(BHU)/SMST/2019-20/Glove Box/285School of Materials Science & TechnologySupply of Intermetallic Sample Preparation setup with Glove Box 26/09/201918-10-2019 (04:00 PM)Download BOQ
IIT(BHU)/ME/2019-20/RKG/12/QTNMechanical EngineeringSupply of Bio-Tribometer with electrochemical workstation system 24/09/201930/10/2019 (03:00 PM)Download BOQ
IIT(BHU)/EC/2019-20/301Electronics EngineeringSupply of LabVIEW and Embedded Control & Monitoring System 23/09/201914-10-2019 (04:00 PM)Download BOQ
IIT(BHU)/CHE/AV/19-20/TD/03Chemical Engineering & Tech.Supply of Motorized Upright Fluorescence Research Microscope 21/09/201911-10-2019 (05:00 PM)Download BOQ
IIT(BHU)/CER/2019-20/UTM/ENQ/31Ceramic EngineeringSupply of Universal Testing Machine (10kN) 17/09/201910-10-2019 (03:00 PM)Download BOQ
IIT(BHU)BHU)/EE/NKSN/ECR/19-20/02Electrical EngineeringProgrammable bi-directional DC power supply with battery emulation 16/09/201915-10-2019 (04:00 PM)Download BOQ
IIT(BHU)BHU/MIN/HD/2019-20/2740Mining EngineeringGround Vibration Meter (Technical Specifications) 16/09/201904-10-2019 (03:00 PM)Download BOQ
IIT(BHU)/PH/FY/2019-20/QTN/M/29Pharmaceutical Engineering & Tech.Supply and Installation of UV-Vis Double Beam Spectrophotometer 13/09/201901-10-2019 (15:00 Hrs)-
IIT(BHU)/PH/FY/2019-20/QTN/M/28Pharmaceutical Engineering & Tech.Supply and Installation of Rotavapor, Vacuum Pump and Chiller 13/09/201901-10-2019 (15:00 Hrs)-
IIT(BHU)/CSE/2019-20/337Computer Science and EngineeringSupply, Installation of Equipment and Setup of Networking LAB 
Download BOQ
Corrigendum: 01.10.2019
Corrigendum: 16.09.2019
11/09/201901/10/2019 (15:00 Hrs)03/10/2019 (15:30 Hrs)
IIT(BHU)/ACAD/Convocation/Purchase/2019-20/QTN/06Academic AffairsTender enquiry for procurement of Sadri 
Corrigendum: 19.09.2019
06/09/201920/09/2019
IIT(BHU)/SMST/2019-20/Spectrophotometer/236School of Materials Science and TechnologySupply of Steady State and Lifetime Bench-top Spectrophotometer 
Download BOQ
Corrigendum: 30.09.2019
06/09/201914/10/2019 03:00 PM15/10/2019 03:30 PM
IIT(BHU)/SMST/2019-20/FS/235School of Materials Science and TechnologySupply of STEADY STATE Fluorescence Spectrophotometer setup 
Download BOQ
Corrigendum: 30.09.2019
06/09/201914/10/2019 03:00 PM15/10/2019 03:30 PM
IIT(BHU)/SMST/2019-20/UV-VIS/234School of Materials Science and TechnologySupply of UV–VIS PC Control Spectrophotometer setup 
Download BOQ
06/09/201927/09/2019 05:00 PM30/09/2019 16:30 PM
IIT(BHU)/SMST/2019-20/FTIR/233School of Materials Science and TechnologySupply of FTIR Spectrometer setup 
Download BOQ
06/09/201927/09/2019 05:00 PM30/09/2019 16:30 PM
R&D/SERB/Met//19-20/02Department of Metallurgical EngineeringOnline Micro-Gas Chromatograph / Multi-Gas Analyzer 
Download BOQ
Corrigendum: 30.09.2019
06/09/201914/10/2019 03:00 PM15/10/2019 15:30 Hrs
IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/10Dean (Academic Affairs) OfficeQuotation Enquiry for Catering Items 06/09/201920/09/2019 16:00 Hrs
IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/09Dean (Academic Affairs) OfficeQuotation Enquiry for Proceedings & Brochure 06/09/201920/09/2019 16:00 Hrs
IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/07Dean (Academic Affairs) OfficeFlex & Sound Light System 06/09/201920/09/2019
IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/08Dean (Academic Affairs) OfficeTent materials for Food Stall 06/09/201920/09/2019 16:00 Hrs
IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/05Dean (Academic Affairs) OfficeQuotation Enquiry for Minting of Medals 06/09/201920/09/2019 16:00 Hrs
IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/04Dean (Academic Affairs) OfficeLeatherite Degree Folder (with IIT(BHU) Logo) 06/09/201920/09/2019 16:00 Hrs
IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/02Dean (Academic Affairs) OfficeConvocation Special Uttariya 06/09/201920/09/2019 16:00 Hrs
IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/03Dean (Academic Affairs) OfficeJute Bag (IIT(BHU) Centenary Logo) 06/09/201920/09/2019 16:00 Hrs
IIT(BHU)/PH/FY/2019-20/QTN/M/19Department of Pharmaceutical EngineeringQuotation Enquiry for Compressor Tablet Machine 
Download BOQ
Corrigendum: 31.01.2020
06/09/201927/09/2019 15:30 Hrs
IIT(BHU)/Gymkhana/SI/2019-20/147Gymkhana IIT(BHU), VaranasiQuotation Enquiry for Sports Items 
Annexure I
04/09/201913/09/201916/09/2019 (16:00)
IIT(BHU)/Gymkhana/IJ/2019-20/148Gymkhana IIT(BHU), VaranasiInstitute Jersey (Playing Kit) 
Annexure A
04/09/201913/09/201916/09/2019 (16:00)
IIT(BHU)/Gymkhana/TS/2019-20/147Gymkhana IIT(BHU), VaranasiTrack Suits 04/09/201913/09/201916/09/2019 (16:00)
IIT(BHU)/I.P. Cell/A.R.C./2019-20/380Institute Purchase CellLab Chemical Glassware & Filter Paper 04/09/201925/09/2019 (14:00 Hrs)
IIT(BHU)/IP Cell/Vehicle/2019-20/381Registrar, IIT(BHU), VaranasiHiring of Vehicle Rate 04/09/201925/09/2019 15:00 Hrs26/09/2019 (16:00 PM)
IIT(BHU)/ACD/Induction/Purchase/2019-20/QTN/01Academic AffairsAnnual Report Printing 03/09/201916/09/2019
IIT(BHU)/CIV/QTN/2019-20/1178Civil EngineeringPurchase of Unmanned Aerial Vehicle 02/09/201916/09/2019 05:00 PM
IIT(BHU)/ME/USR/2019-20/TD/01Mechanical EngineeringCNC Wire Cut EDM Machine 
Download BOQ
30/08/201919/09/2019 16:00 Hrs20/09/2019 (04:00 PM)
IIT(BHU)/IWD/CT-14/2019-20/1000Institute Works DepartmentProviding and Fixing of Aluminium Frame Window with Mosquito Net 
Download BOQ
Corrigendum: 30.08.2019
29/08/201918/09/2019 up to 15:00 hrs19/09/2019 15:30 hrs
IIT(BHU)/IWD/CT-15/2019-20/1001Institute Works DepartmentExterior Painting Work and Apron Repair Around Rajputana Hostel 
Download BOQ
Corrigendum: 30.08.2019
Corrigendum: 18.08.2021
29/08/201918/09/2019 up to 15:00 hrs19/09/2019 15:30 hrs
IIT(BHU)/IWD/CT-16/2019-20/1002Institute Works DepartmentRenovation of Toilets and Bathrooms (S. C. De Hostel) 
Download BOQ
Corrigendum: 30.08.2019
29/08/201918/09/2019 up to 15:00 hrs19/09/2019 15:30 hrs
IIT(BHU)/IWD/CT-18/2019-20/1003Institute Works DepartmentConstruction of Mezzanine Floor for Tinkering Lab 
Download BOQ
Corrigendum: 30.08.2019
29/08/201918/09/2019 up to 15:00 hrs19/09/2019 15:30 hrs
IIT(BHU)/IWD/CT-19/2019-20/1004Institute Works DepartmentModification of Common Place & Service Counter Area in IIT Cafeteria 
Download BOQ
Corrigendum: 30.08.2019
29/08/201918/09/2019 up to 15:00 hrs19/09/2019 15:30 hrs
IIT(BHU)/IWD/CT-20/2019-20/1005Institute Works DepartmentConstruction of Boundary Wall outside SC De Hostel 
Download BOQ
Corrigendum: 30.08.2019
29/08/201918/09/2019 up to 15:00 hrs19/09/2019 15:30 hrs
IIT(BHU)/SBChE/Fermenter/19-20/T01/207School of Biochemical EngineeringIn Situ Sterilizable Fermenter (SS316) 
Download BOQ
26/08/201916/09/2019 (05:00 PM)18/09/2019 (03:00 PM)
IIT(BHU)/Newsletter/P.C.I.NOffice of the Chief EditorPrinting of Institute Newsletter 22/08/201901/09/2019
IIT(BHU)/CHE/AV/19-20/TD/01Department of Chemical EngineeringSupply of Equipment 
Download BOQ
21/08/201910/09/2019 (05:00 PM)12/09/2019 (04:00 PM)
IIT(BHU)/che/2019-20/QTN/77Department of Chemical EngineeringProcess Dynamics and Control Experimental Setup 
Annexure I-B
Annexure I-C
Corrigendum: 28.08.2019
20/08/201909/09/201911/09/2019
IIT(BHU)/che/2019-20/QTN/74Department of Chemical EngineeringSupply of Items (General) 
Annexure I-B
Annexure I-C
20/08/201902/09/201904/09/2019
IIT(BHU)/PHY/accessories/rutherfordexpt/165Department of PhysicsRutherford Scattering Experiment Setup 
Download BOQ
19/08/201909/09/2019 (03:00 PM)10/09/2019 (03:30 PM)
IIT(BHU)/Che/19-20/TD/72Department of Chemical EngineeringSupply of Equipments (TD-72) 
Download BOQ
13/08/201926/08/2019 (05:00 PM)02/09/2019 (04:00 PM)
IIT(BHU)/ChE/2019-20/QTN/68Department of Chemical EngineeringUniversal Testing Machine 
Annexure I-B
Annexure I-C
08/08/201919/08/201921/08/2019
IIT(BHU)/SMST/2019-20/IR_SNOM/189School of Materials Science and TechnologyIR-SNOM Setup 
Download BOQ
Corrigendum: 29.08.2019
06/08/201910/09/2019 (03:00 PM)13/09/2019 (03:30 PM)
IIT(BHU)/ChE/2019-20/QTN/66Department of Chemical EngineeringCalorific Value of Fuels (Bomb Method) 
Annexure I-B
Annexure I-C
05/08/201916/08/201919/08/2019
IIT(BHU)/ChE/2019-20/VS/15Department of Chemical EngineeringFluidised Bed Reactor 
Annexure I-B
Annexure I-C
02/08/201923/08/201926/08/2019
IIT(BHU)/IWD/Lift/2019-20/ET-03/604Institute Works DepartmentComprehensive Maintenance of Passenger Lifts 
Download BOQ
Corrigendum
Cancellation
28/06/201918/07/2019 up to 15:00 hrs19/07/2019 15:30 hrs
IIT(BHU)/Min/SKP/2019-20/2511Department of Mining EngineeringHuman Vibration Analyser/Meter 
Download BOQ
25/06/201915/07/201917/07/2019 (03:30 PM)
IIT(BHU)/IWD/CT/03/2019-20/523Institute Works DepartmentGuniting & Painting Work (Dhanrajgiri Hostel) 
Download BOQ
Corrigendum
Cancellation
18/06/201903/07/2019 up to 15:00 hrs04/07/2019 15:30 hrs
IIT(BHU)/Budget/CA/2019-20/02Registrar OfficeChartered Accountant Firms e-Tender 
Download BOQ
19/07/201909/08/2019
IIT(BHU)/EC/2019-20/113Department of Electronics EngineeringUV-Vis Spectrophotometer 19/07/201913/08/2019 03:00 PM
IIT(BHU)/EC/2019-20/102Department of Electronics EngineeringThickness Profilometer 
Download BOQ
18/07/201908/08/2019 03:00 PM09/08/2019 03:30 PM
IIT(BHU)/ACD/Induction/Purchase/2019-20/QTN/06Department of CivilQuotations Enquiry for Refreshment Items 15/07/201921/07/2019
IIT(BHU)/ACD/Induction/Purchase/2019-20/QTN/07Department of CivilQuotations Enquiry for Informantion Booklet Printing 15/07/201921/07/2019
IIT(BHU)/HTL/CoW/19-20/257Council of WardensQuotations for Photocopier 15/07/201913/08/2019 (06:00 PM) | Opening: 16/08/2019 (03:00 PM)
IIT(BHU)/ChE/2019-20/QTN/52Department of Chemical Engg. & Tech.Quotations for the supply of Split Tube Furnace 
Annexure I-B
Annexure I-C
12/07/201919/07/201922/07/2019
IIT(BHU)/ACD/Induction/Purchase/2019-20/QTN/04Department of CivilQuotations Enquiry Tempo Traveller 11/07/201917/07/2019
IIT(BHU)/ACD/Induction/Purchase/2019-20/QTN/05Department of CivilQuotations Enquiry Sum Board 11/07/201917/07/2019
IIT(BHU)/SMST/2019-20/UHV/148School of Materials ScienceSupply of Multi target UHV sputtering unit 
BOQ
Corrigendum 01.08.2019
10/07/201914/08/2019 (03:00 PM)16/08/2019 (03:30 PM)
IIT(BHU)/SMST/2019-20/UHV/149School of Materials ScienceSupply of Cryogenic Compatible FMR/ISHE Spectrometer Setup 
BOQ
Corrigendum 01.08.2019
10/07/201914/08/2019 (03:00 PM)16/08/2019 (03:30 PM)
III(BHU)/ChE/2019-20/QTN/50Department of Chemical EngineeringQuotations Enquiry for Portable Density Meter 
Annexure I-B
Annexure I-C
02/07/201918/07/201922/07/2019
III(BHU)/mining/QTN/SKP/2019-20/ERGO/01Department of Mining EngineeringQuotations Enquiry for Purchase of Ergomaster software 28/06/201919/07/2019
IIT(BHU)/mining/QTN/SKP/2019-20/ANTHR/01Department of Mining EngineeringQuotations Enquiry for Purchase of Anthropometer 
Corrigendum 09.07.2019
28/06/201919/07/2019
IIT(BHU)/IWD/Lift/2019-20/ET-03/604Institute Works DepartmentComprehensive maintenance of passenger lifts 
BOQ
Corrigendum 18.07.2019
Cancellation 27.07.2019
28/06/201918/07/2019 (15:00 hrs)19/07/2019 (15:30 hrs)
IIT(BHU)/Min/SKP/2019-20/2511Department of Mining EngineeringHuman Vibration Analyser/Meter 
BOQ
25/06/201915/07/2019 (03:00 PM)17/07/2019 (03:30 PM)
IIT(BHU)/IWD/CT/03/2019-20/523Institute Works DepartmentGuniting and painting works Dhanrajgiri hostel 
BOQ
Corrigendum 02.07.2019
Cancellation 06.08.2019
18/06/201903/07/2019 (03:00 hrs)04/07/2019 (03:30 hrs)
IIT(BHU)/IWD/CT/04/2019-20/524Institute Works DepartmentGuniting works Dhanrajgiri hostel (Right side) 
BOQ
Corrigendum 02.07.2019
18/06/201903/07/2019 (03:00 hrs)04/07/2019 (03:30 hrs)
IIT(BHU)/IWD/CT/05/2019-20/525Institute Works DepartmentRenovation of Kitchen Block S.C. De Hostel 
BOQ
18/06/201928/06/2019 (17:00 hrs)01/07/2019 (11:30 hrs)
IIT(BHU)/IWD/CT/06/2019-20/526Institute Works DepartmentRenovation of Kitchen Block Vishwakarma Hostel 
BOQ
18/06/201928/06/2019 (17:00 hrs)01/07/2019 (11:30 hrs)
IIT(BHU)/IWD/CT/07/2019-20/527Institute Works DepartmentGuniting works Dhanrajgiri hostel (Left side G floor) 
BOQ
Corrigendum 02.07.2019
Cancellation 06.08.2019
18/06/201903/07/2019 (03:00 hrs)04/07/2019 (03:30 hrs)
IIT(BHU)/IWD/CT/08/2019-20/528Institute Works DepartmentGuniting works Dhanrajgiri hostel (Right side G floor) 
BOQ
Corrigendum 02.07.2019
Cancellation 06.08.2019
18/06/201903/07/2019 (03:00 hrs)04/07/2019 (03:30 hrs)
IIT(BHU)/IWD/CT/09/2019-20/529Institute Works DepartmentDistempering and painting Rajputana Hostel 
BOQ
18/06/201928/06/2019 (17:00 hrs)01/07/2019 (11:30 hrs)
IIT(BHU)/IWD/CT/10/2019-20/530Institute Works DepartmentBoundary wall construction SC De Hostel 
BOQ
Cancellation 06.08.2019
18/06/201928/06/2019 (17:00 hrs)01/07/2019 (11:30 hrs)
IIT(BHU)/IWD/CT/11/2019-20/531Institute Works DepartmentRenovation of Kitchen Block S.C. De Hostel (Ground Floor) 
BOQ
Cancellation 06.08.2019
18/06/201928/06/2019 (17:00 hrs)01/07/2019 (11:30 hrs)
IIT(BHU)/IWD/CT/12/2019-20/532Institute Works DepartmentRenovation of Kitchen Block Vishwakarma Hostel (Ground Floor) 
BOQ
Cancellation 06.08.2019
18/06/201928/06/2019 (17:00 hrs)01/07/2019 (11:30 hrs)
IIT(BHU)/SMST/2019-20/UHV/85School Materials Science and TechnologySupply of Multi target UHV sputtering unit 
BOQ
Corrigendum 10.07.2019
07/06/201928/06/2019
IIT(BHU)/SMST/2019-20/FMR/84School Materials Science and TechnologySupply of Cryogenic Compatible FMR/ISHE Spectrometer 
BOQ
Corrigendum 10.07.2019
07/06/201928/06/2019
IIT(BHU)/SMST/2019-20/UTM/83School Materials Science and TechnologySupply of Universal Testing Machine 
BOQ
07/06/201928/06/2019
IIT(BHU)/SMST/2019-20/DTMA/82School Materials Science and TechnologySupply of Dynamic Thermo-Mechanical Analyzer 
BOQ
07/06/201928/06/2019
ChE/19-20/VS/09Department of Chemical EngineeringQuotation Inquiry for Gas Chromatograph 
Annexure I-B
Annexure I-C
07/06/201928/06/201912/07/2019
IT/HTL/CoW/19-20/18Council of WardensCatering Services in New Girls Hostel 
BOQ
Corrigendum 12.06.2019
28/05/201922/06/2019 (05:00 PM)25/06/2019 (05:00 PM)
IIT(BHU)/IPCell/2019-20/Networking/149Institute Purchase CellExtension of IIT(BHU) LAN (Wired & Wi-Fi) 
BOQ
Corrigendum series
Technical Evaluation Report
24/05/201915/06/2019
IIT(BHU)/IWD/ET/01/Arch./2019-20/358Institute Works DepartmentElectrical wiring Architecture Department 
Corrigendum 29.05.2019
22/05/201930/06/2019 (03:00 PM)
IIT(BHU)/IWD/CT/01/Arch./2019-20/350Institute Works DepartmentAluminum partition Architecture Department 
Corrigendum 21.05.2019
21/05/201927/05/2019
IIT(BHU)/IWD/CT/02/Arch./2019-20/351Institute Works DepartmentFalse ceiling and painting Architecture Department 
Corrigendum 21.05.2019
21/05/201927/05/2019
IIT(BHU)/ADM/187/SoM/2019-20/Gen/1022Registrar Office IIT(BHU)Supply of Manpower Tender 09/05/2019
IIT (BHU)/ADM/187/SoM/2019-20/Gen/1023Registrar Office IIT(BHU)Tender No. IIT(BHU)/Admin./2018-19/6 dated 11.03.2019 regarding Cleaning and Sanitation. 09/05/2019
IIT (BHU)//ADM/187/SoM/2019-20/Gen/1024Registrar Office IIT(BHU)Tender No. IIT(BHU)/Admin./2018-19/5 dated 18.01.2019 regarding Disposal of Solid Waste. 09/05/2019
IIT (BHU)//ADM/187/SoM/2019-20/Gen/1025Registrar Office IIT(BHU)Tender No. IIT(BHU)/Admin./2018-19/4 dated 18.01.2019 regarding providing Horticulture/Gardening Services. 09/05/2019
IIT(BHU)/Budget/CA/2019-20/01Registrar Office IIT(BHU)Tender for hiring of Chartered Accountant Firms 
Download BOQ
Corrigendum: Dated 20.05.2019
03/05/201925.05.201927.05.2019
IIT(BHU)/I.P. Cell/FPC/2019-20/43Furniture Purchase CommitteeSupply of Furniture for Girl’s Hostel 
Download BOQ
Corrigendum: Dated 06.05.2019
25/04/201905.05.201913.05.2019
ChE/19-20/VS/01Department of Chemical EngineeringQuotations inquiry for Multi-Point Dynamic BET Surface Area Analyser 
Annexure I-B
Annexure I-C
22/04/201913/05/201915/05/2019
IIT(BHU)/Admin/2018-19/7Registrar Office IIT(BHU)Clarification regarding Tender Notice Supply of Manpower 27/03/2019
CE/IMPRINTProject/2018-19/63Department of Civil EngineeringSupply of Sound Level Meter (Type 1/Class 1) 
Download BOQ
Corrigendum: Dated 19.03.2019
15/03/201905/04/201908/04/2019
IIT(BHU)/IWD/CT/92/2018-19/3211Institute Works DepartmentLimited tender for platform with granite top and stainless steel frame 27/02/201905/02/201905/02/2019
IIT(BHU)/IWD/CT/93/2018-19/3212Institute Works DepartmentPlatform with granite top and stainless steel frame (Room No. 15) 27/02/201905/02/201905/02/2019
IIT(BHU)/IWD/CT/94/2018-19/3213Institute Works DepartmentLimited tender for platform with granite top and stainless steel hollow tube frame (Room No-13,14 & 16) 27/02/201905/02/201905/02/2019
IIT(BHU)/IWD/CT/95/2018-19/3214Institute Works DepartmentPlatform with granite top and stainless steel hollow tube frame (Room No-17 & Computer room) 27/02/201905/02/201905/02/2019
IIT(BHU)/IWD/CT/97/2018-19/3215Institute Works DepartmentProviding and fixing curtain at A-9 Principal Colony 
Corrigendum: Dated 28.06.2019
27/02/201905/02/201905/02/2019
DIC-IIT(BHU)/2018-19/296Design Innovation CentreThin Film Deposition System 1 complete Unit 
Download BOQ
20/02/201912/03/201913/03/2019
IIT(BHU)/18-19/105Department of Mechanical EngineeringHigh Strength Color Polymer 3D Printer 
Download BOQ
Corrigendum
14/02/201915/03/201918/03/2019
IIT(BHU)/18-19/106Department of Mechanical EngineeringComposite 3D Printer 
Download BOQ
14/02/201907/03/201908/03/2019
IIT(BHU)/18-19/107Department of Mechanical EngineeringCeramic/Clay 3D Printer 
Download BOQ
14/02/201907/03/201908/03/2019
IIT(BHU)/18-19/108Department of Mechanical EngineeringBIO-3D Printer 
Download BOQ
14/02/201907/03/201908/03/2019
IIT(BHU)/MET-RS/QTN/995/2018-19Department of Metallurgical EngineeringAutomatic film coater 12/02/201920/02/2019
IIT(BHU)/MET-RS/QTN/996/2018-19Department of Metallurgical EngineeringCalendering press 12/02/201920/02/2019
IIT(BHU)/CHY/2018-19/dispensingDepartment of ChemistryPrecision Liquid EFD Dispensing system 
Download BOQ
Corrigendum
12/02/201915/03/201919/03/2019
IIT(BHU)/CIF/2018-19/Impedance AnalyzerCentral Instrument FacilityImpedance Analyzer with temperature attachments 
Download BOQ
Corrigendum
09/02/201905/03/201918/03/2019
IIT(BHU)/CIF/2018-19/Table Top SEMCentral Instrument FacilityTable Top Scanning Electron Microscope 
Download BOQ
Corrigendum
09/02/201905/03/201918/03/2019
IIT (BHU)/ADM/187/SoM/2019-20/Gen/1023Registrar Office IIT(BHU)Tender No. IIT(BHU)/Admin./2018-19/6 dated 11.03.2019 regarding Cleaning and Sanitation. 09/05/2019
IIT (BHU)//ADM/187/SoM/2019-20/Gen/1024Registrar Office IIT(BHU)Tender No. IIT(BHU)/Admin./2018-19/5 dated 18.01.2019 regarding Disposal of Solid Waste. 09/05/2019
IIT (BHU)//ADM/187/SoM/2019-20/Gen/1025Registrar Office IIT(BHU)Tender No. IIT(BHU)/Admin./2018-19/4 dated 18.01.2019 regarding providing Horticulture/ Gardening Services. 09/05/2019
IIT(BHU)/Budget/CA/2019-20/01Registrar Office IIT(BHU)Tender for hiring of Chartered Accountant Firms. 03/05/201925/05/201927/05/2019
IIT(BHU)/I.P. Cell/FPC/2019-20/43Furniture Purchase CommitteeSupply of Furniture for Girl’s Hostel 25/04/201905/05/201913/05/2019
ChE/19-20/VS/01Department of Chemical EngineeringQuotations inquiry for Multi-Point Dynamic BET Surface Area Analyser. 22/04/201913/05/201915/05/2019
IIT(BHU)/Admin/2018-19/7Registrar Office IIT(BHU)Clarification regarding Tender Notice No(BHU)/Admin/2018-19/7 dated 11th Mar, 2019 (Supply of Manpower). 27/03/2019
CE/IMPRINTProject/2018-19/63Department of Civil EngineeringSupply of Sound Level Meter (Type 1/Class 1) with dB, octave band and with/without seismic vibration measurement. 15/03/201905/04/201908/04/2019
IIT(BHU)/IWD/CT/92/2018-19/3211Institute Works DepartmentPlatform with granite top and stainless steel hollow tube frame work (Lab furniture work). 27/02/201905/02/201905/02/2019
IIT(BHU)/IWD/CT/93/2018-19/3212Institute Works DepartmentPlatform with granite top and stainless steel hollow tube frame in Room No. 15, Department of Physics. 27/02/201905/02/201905/02/2019
IIT(BHU)/IWD/CT/94/2018-19/3213Institute Works DepartmentPlatform with granite top and stainless steel hollow tube frame in Room No. 13, 14 & 16, Department of Physics. 27/02/201905/02/201905/02/2019
IIT(BHU)/IWD/CT/95/2018-19/3214Institute Works DepartmentPlatform with granite top and stainless steel hollow tube frame in Room No. 17 & Computer Room, Department of Physics. 27/02/201905/02/201905/02/2019
IIT(BHU)/IWD/CT/97/2018-19/3215Institute Works DepartmentProviding and fixing curtain at A-9, Principal Colony, IIT(BHU), Varanasi. 27/02/201905/02/201905/02/2019
DIC-IIT(BHU)/2018-19/296Design Innovation CentreThin Film Deposition System 1 complete Unit 20/02/201912/03/201913/03/2019
IIT(BHU)/18-19/105Department of MechanicalHigh Strength Color Polymer 3D Printer – Committee requirement 14/02/201915/03/201918/03/2019
IIT(BHU)/18-19/106Department of MechanicalComposite 3D Printer – Committee requirement 14/02/201907/03/201908/03/2019
IIT(BHU)/18-19/107Department of MechanicalCeramic/Clay 3D Printer – Committee requirement 14/02/201907/03/201908/03/2019
IIT(BHU)/18-19/108Department of MechanicalBIO-3D Printer – Committee requirement 14/02/201907/03/201908/03/2019
IIT(BHU)/MET-RS/QTN/995/2018-19Department of Metallurgical EngineeringAutomatic film coater (quotation inquiry) 12/02/201920/02/2019
IIT(BHU)/MET-RS/QTN/996/2018-19Department of Metallurgical EngineeringCalendering press (quotation inquiry) 12/02/201920/02/2019
IIT(BHU)/CHY/2018-19/dispensingDepartment of ChemistryPrecision Liquid EFD Dispensing system for screen printing 12/02/201915/03/201919/03/2019
IIT(BHU)/CIF/2018-19/Impedance AnalyzerCentral Instrument FacilityImpedance Analyzer with low and high temperature measurement attachments 09/02/201905/03/201918/03/2019
IIT(BHU)/CIF/2018-19/Table Top SEMCentral Instrument FacilityTable Top Scanning Electron Microscope (complete unit) 09/02/201905/03/201918/03/2019
IIT(BHU)/CSE/CCIS/2018-19/777Department of Computer Science and EngineeringUpgradation of Supermicro Workstation Model: 747-20 04/02/201914/02/2019
IIT(BHU)CER/PS/2018-19/Glove-BoxDepartment of Ceramic EngineeringGlove Box equipped with Electrochemical Test Station 04/02/201904/03/201905/03/2019
IIT(BHU)/FPC/2018-19/894Furniture Purchase CommitteeSupply of Kitchen Equipment for Girl’s Hostel 04/02/201926/02/201928/02/2019
IIT(BHU)/FPC/2018-19/893Furniture Purchase CommitteeSupply of Furniture for Girl’s Hostel 04/02/201926/02/201928/02/2019
IIT(BHU)/IWD/CT/89/2018-19/3062Institute Works DepartmentAluminium partition, false ceiling and painting work (CNC Laboratory) 01/02/201912/02/201912/02/2019
IIT(BHU)/IWD/CT/90/2018-19/3063Institute Works DepartmentGranite work and M.S. gate of CNC Laboratory Main Workshop 01/02/201912/02/201912/02/2019
IIT(BHU)/IWD/CT/91/2018-19/3064Institute Works DepartmentAluminium partition, false ceiling and laboratory renovation work (Chemistry Dept.) 01/02/201908/02/201908/02/2019
IIT(BHU)/SMST/PM/2018-19/techtransfer/1School of Materials Science and TechnologyTransfer of technology of Indian patent application No. 201911002765 01/02/201910/02/2019
IIT(BHU)/IWD/CT/81/2018-19/2910Institute Works DepartmentRenovation of bathrooms, badminton court, canteen area, and sewer repair work 01/02/201925/03/201926/03/2019
IIT(BHU)/IWD/CT/82/2018-19/2911Institute Works DepartmentAluminium window with mosquito net (Gandhi Smriti Mahila Chhatravas) 01/02/201925/03/201926/03/2019
IIT(BHU)/IWD/CT/83/2018-19/2912Institute Works DepartmentRepair and maintenance work in Chemical Engineering corridor 01/02/201925/03/201926/03/2019
IIT(BHU)/I.PCell/CPC/2018-19/876Office of the RegistrarQuotation for lunch, tea & snacks for LEAP programme 30/01/201908/02/2019
IIT(BHU)/IPCell/2018-19/Networking/873Institute Networking CommitteeSupply, installation and commissioning of extension of IIT(BHU) LAN (wired and Wi-Fi) 29/01/201927/02/201928/02/2019
IIT(BHU)/SMST/RP/2018-19/Imprint/Gas ChamberSchool of Materials Science and TechnologyGas sensing chamber with MFC (complete unit) 29/01/201926/02/201927/02/2019
IIT(BHU)/EE/2018-19/139Department of Electrical EngineeringProgrammable single phase AC and DC electronic load (quotation) 24/01/201914/02/2019
IIT(BHU)/CSE/CCIS/2018-19/740Centre for Computing and Information ServicesSupply, installation and commissioning of workstations 23/01/201912/02/201912/02/2019
IIT(BHU)/min/QTN/2018-19/1990Department of Mining EngineeringQuotation for Li-ion prismatic cells (3.6V, 90Ah) 22/01/201909/02/2019
IIT(BHU)/HTL/CoW/2018-19/168Council of WardensSupply of Aqua Guard water purifiers (approx. 105 units) 22/01/201926/02/201927/02/2019
IIT(BHU)/CIF/2018-19/BETCentral Instrument FacilityHigh-performance surface area measurement system (physisorption/chemisorption) 22/01/201918/02/201921/02/2019
IIT(BHU)/CIF/2018-19/ICP-MSCentral Instrument FacilityInductively Coupled Plasma Mass Spectrometry (ICP-MS) 22/01/201911/02/201913/02/2019
IIT(BHU)/IPCell/CPC/2018-19/858Institute Purchase CellSupply of exhibition items (Octonorm stall, matting, etc.) 21/01/201925/01/2019
IIT(BHU)/IPCell/CPC/2018-19/857Institute Purchase CellQuotation enquiry for drafting, designing and printing of books 21/01/201925/01/2019
MET-IIT(BHU)/2018-19/01Department of Metallurgical EngineeringIn-situ Heating Holder (Single/Double) – complete unit 18/01/201917/02/201918/02/2019
IIT(BHU)/Admin/2018-19/4Registrar Office IIT(BHU)Gardening/Horticulture services for institute premises 18/01/201907/02/201908/02/2019
IIT(BHU)/Admin/2018-19/5Registrar Office IIT(BHU)Disposal of solid waste (wet and dry) from institute premises 18/01/201918/02/201919/02/2019
IIT(BHU)/PH/FY/2018-19/QTN/M/72Department of Pharmaceutical EngineeringPre-clinical in-vivo imaging system for small animals 17/01/201923/02/201925/02/2019
IIT(BHU)/R&A/Cent.Celeb./2018-19/810Centenary Celebration CommitteeQuotation enquiry for special Uttariya (ceremonial cloth) 16/01/201927/01/2019
IIT(BHU)/IWD/2018-19QTN/CE/3890Civil Engineering DepartmentRotational viscometer (digital) with Thermosel 14/01/201904/02/2019
IIT(BHU)/IWD/CT/76/2018-19/2880Institute Works DepartmentPrecast concrete seating benches supply 09/01/201917/01/201918/01/2019
IIT(BHU)/IWD/CT/84/2018-19/2881Institute Works DepartmentRenovation and civil works (various institute locations) 09/01/201917/01/201918/01/2019
IIT(BHU)/Che/18-19/T-RS/450Department of Chemical EngineeringQuotations enquiry for Supply of 2D Electrophoresis setup 
Enquiry Document
Download BOQ Template
04/01/201926.01.201928-01-2019 (3.30 PM)
IIT(BHU)/IPCell/2018-19/PRI/800Institute Purchase CellQuotations are invited for Supply and Installation of PRI Line 
Corrigendum: Dated 16.01.2019
03/01/201925.01.2019
IIT(BHU)/EC/2018-19/SB/1523Department of Electronics Engineering44 GHz Handheld Vector Network Analyzer 1 complete Unit 
Download BOQ Template
Corrigendum: Dated 21.01.2019