Tenders (2019)
| Ref. No. | Dept. Name | Description | Upload Date | Closing Date | Attachments |
|---|---|---|---|---|---|
| IIT (BHU))/IWD/ET-24/2019-20/ 1936 | Institute Works Department | Supply, installation, testing and commissioning of outdoor type power distribution panel or power rearrangement in GTAC, IIT(BHU) | 24/12/2019 | 31/12/2019 till 15:00 hrs. | — |
| IIT (BHU))/IWD/ET-23/2019-20/1935 | Institute Works Department | Street lighting work from IIT Square to Dhanrajgiri Square, IIT (BHU) Corrigendum Cancellation, Dated: 12.02.2020 | 24/12/2019 | 31/12/2019 till 15:00 hrs. | — |
| IIT (BHU))/IWD/ET-22/2019-20/1934 | Institute Works Department | Supply, installation, testing and commissioning Battery Charger and Battery Bank in vivekanand DSS, IIT (BHU) | 24/12/2019 | 31/12/2019 till 15:00 hrs. | — |
| IIT (BHU))/IWD/ET-21/2019-20/1933 | Institute Works Department | Supply and laying of LT power cable from DSS A to SMST building Corrigendum, Dated 01.01.2020 | 24/12/2019 | 06/01/2020 till 15:00 hrs. | — |
| IIT (BHU))/FPC/2019-20/001 | Registrar Office, IIT (BHU) Varanasi | Tender for Rate contract for supply of furniture Items. | 24/12/2019 | 13/01/2020 upto 15:00 Hrs. | — |
| IIT (BHU))/MET/CKB/SERB/19-20/EQP/01 | Metallurgical Engineering | Supply of DC Magnetron Sputtering system. | 20/12/2019 | 15.01.2020 (03:00 PM). | Download BOQ |
| IIT (BHU))/EC/ MT/19-20/571 | Electronics Engineering | Supply of “Tower Workstations”. | 17/12/2019 | 09/01/2020, up to 12:00 PM. | Download BOQ |
| IIT (BHU)/IWD/ET-20/2019-20/1878 | Institute Works Department | Supply, installation, testing and commissioning of outdoor type Power Distribution Panel near Main Library Crossing. | 17/12/2019 | 24/12/2019 till 15:00 hrs | — |
| IIT (BHU)/MIN/QTN/2505 | Mining Engineering | Mechanical Vane Anemometer | 12/12/2019 | 26/12/2019 | — |
| IIT (BHU)/PH/FY/2019-20/QTN/AK/01 | Pharmaceutical Engineering | Supply and Installation of Workstation Computer/Server | 12/12/2019 | 02/01/2020 at 03:00 P.M | — |
| IIT (BHU)/ME/2019-20/JS/IMP/QTN/1 | Mechanical Engineering | Fourier Transform Infrared (FTIR) Spectrometer setup. | 06/12/2019 | 30/12/2019, up to 15.00 Hrs. | Download BOQ |
| IIT (BHU)/Met/SERB/VJ/19-20/26 | Metallurgical Engineering | High-temperature high vacuum furnace Corrigendum, Dated 17.12.2019 | 29/11/2019 | 21.12.2019, up to 05.00 PM | Download BOQ |
| IIT (BHU)/R&D/SERB/Met/19-20/02A | Metallurgical Engineering | Controlled-Atmosphere High Temperature Furnace Corrigendum, Dated 18.12.2019 Corrigendum, Dated 24.12.2019 | 28/11/2019 | 04.01.2020 03.00 PM | Download BOQ |
| IIT (BHU)R&D/SERB/Met/19-20/02B | Metallurgical Engineering | Online Multi-Gas Analyser Download BOQ | 28/11/2019 | 19.12.2019 03.00 PM | Download BOQ |
| IIT (BHU)/R&D/SA/Electronice/DRDO/QTN/2019-20/01 | Electronics Engineering | Tower Workstation should have the following features | 25/11/2019 | 14/12/2019 | — |
| IIT (BHU)/SMST/2019-20/ENQ/Multimeter, Source meter/359 to 363 | School of materials science and technology | Enquiry inviting quotation for Current source, nanovoltmeter and digital multimeter to use with thermopower measurement system | 22/11/2019 | 09/12/2019, 14.00 Hrs | — |
| IIT (BHU)/R&D/SERB/ChE/19-20/02/Eq1 | Chemical Engineering | Supply of a Photovoltaic Spectrometer (A PV-Device Spectral Characterization System for Internal & External Quantum Efficiency). Corrigendum, Dated 20.12.2019 | 22/11/2019 | 04/01/2020, 15.00 Hrs | Download BOQ |
| IIT (BHU)/CER/2019-20/ECR/AKD/EMR | Ceramic Engineering | Supply of “Elisa Micro-plate Reader with Accessories” | 21/11/2019 | 09-12-2019 (03:00 PM) | Download BOQ |
| IIT (BHU)/R&D/BRNS/Chy/19-20/01/A | Chemistry | PC based Double Beam solid state UV-VIS Diffuse reflectance Spectrophotometer for powder/ film sample measurement, working on 220V, 50Hz with variable bandwidth manufactured by an ISO 9001, ISO-14001 certified company, working on 32 bit software. Corrigendum, Dated 17.12.2019 | 21/11/2019 | 31.12.2019, up to 16:00 PM | Download BOQ |
| IIT (BHU)/ME/PS/19-20/TD/02 | Mechanical Engineering | Specifications & quantity of the item | 19/11/2019 | 10/12/2019, 16.00 Hrs | Download BOQ |
| IIT (BHU)/IWD/CT-51/2019-20/1712 | Institute Works Department | Providing and fixing of door shutter with frame in first floor rooms almirah in S.C. De Hostel Corrigendum, Dated 28.11.2019 Corrigendum, Dated 05.12.2019 Corrigendum, Dated 11.12.2019 Cancellation, Dated 10.02.2020 | 19/11/2019 | 16/12/2019 (03:00) PM | — |
| IIT (BHU)/IWD/ET-12/2019-20/1713 | Institute Works Department | Supply and laying of LT power cable from IT DSS to Feeder Pillar, Near Library Square Corrigendum, Dated 05.12.2019 | 19/11/2019 | 09/12/2019 (03:00) PM | — |
| IIT (BHU)/IWD/ET-13/2019-20/1714 | Institute Works Department | Illumination works from Rajputana Hostel Feeder Pillar to Vishwasareya Square | 19/11/2019 | 25/11/2019 (03:00) PM | — |
| IIT (BHU)/IWD/ET-14/2019-20/1715 | Institute Works Department | Supply and installation of outdoor Feeder Pillar near Library Square for feeding power to TLC Building, Library and ABLT | 19/11/2019 | 25/11/2019 (03:00) PM | — |
| IIT (BHU)IWD/ET-15/2019-20/1716 | Institute Works Department | Supply and Laying of LT power cable from IT DSS to TLC building, Library extension and ABLT extension | 19/11/2019 | 25/11/2019 (03:00) PM | — |
| IIT (BHU)/IWD/ET-16/2019-20/1717 | Institute Works Department | Illumination work in badminton court of Vishwakarma Hostel | 19/11/2019 | 25/11/2019 (03:00) PM | — |
| IIT (BHU)/IWD/ET-17/2019-20/1718 | Institute Works Department | Electrical Work in the 47 rooms and corridor of First Floor (North Wing) in Dhanrajgiri Hostel | 19/11/2019 | 25/11/2019 (03:00) PM | — |
| IIT (BHU)/IWD/ET-18/2019-20/1719 | Institute Works Department | Electrical work in Intre Demonstration lab of main workshop Corrigendum Cancellation, Dated: 26.02.2020 | 19/11/2019 | 25/11/2019 (03:00) PM | — |
| IIT (BHU)/IWD/ET-19/2019-20/1720 | Institute Works Department | Illumination work of inside courtyard and outside parking area of Aryabhatta, GSMC New, S.C. De, Saluja Boys and Vivekanand Hostel | 19/11/2019 | 25/11/2019 (03:00) PM | — |
| IIT (BHU)/EE/2019-20/300 | Electrical Engineering | Please submit your lowest quotation for supplying the under mentioned items. Annexure(s) I-B Annexure(s) I-C | 13/11/2019 | 28/11/2019 | — |
| IIT (BHU)/Che/19-20/QTN/131 | Chemical Engineering | Quotation Enquiry Fuel Cell Stack Hardware Annexure(s) I-B Annexure(s) I-C | 08/11/2019 | 28/11/2019 | — |
| IIT (BHU)/Che/19-20/TD/128 | Chemical Engineering | Supply of following equipments. | 30/10/2019 | 20/11/2019, 15.00 Hrs. | Download BOQ |
| IIT (BHU)/3DP/Polymer/002 | Chairman, Committee for 3D printer, Department of Mechanical Engineering | Quotation Inquiry for High Strength Colour Polymer 3D Printer | 24/10/2019 | 14.11.2019 (up to 03:00 PM) | Download BOQ |
| IIT (BHU)/3DP-Metal/001 | Chairman, Committee for 3D printer, Department of Mechanical Engineering | Quotation Inquiry for Metal 3D Printer Corrigendum, Dated 19.11.2019 | 24/10/2019 | 21.11.2019 (up to 03:00 PM) | Download BOQ |
| IIT(BHU)/ChE/19-20/VS/18 | Department of Chemical Engineering | Quotation Inquiry for Fluidised Bed Reactor Annexure(s) I-B Annexure(s) I-C | 24/10/2019 | 14/11/2019 | — |
| IIT(BHU)/IWD/CT-35/2019-20/1342 | Institute Works Department, IIT(BHU), Varanasi | Water proofing treatment of roof and repairing of patch plaster, Finishing walls with Acrylic Smooth exterior (outer wall) in Department of Electronics, IIT(BHU), Varanasi. | 22/10/2019 | 13/11/2019 up to till 15:00 hrs. | Download BOQ |
| IIT(BHU)/IWD/CT-46/2019-20/1362 | Institute Works Department, IIT(BHU), Varanasi | Construction of Light Weight Structure for (with puff panel roofing/ puff panel walls) including internal false ceiling and vitrified tiles flooring on the fluid mechanics building for Architecture Engineering Department, IIT(BHU) Varanasi. Corrigendum, Dated 23.10.2019 Corrigendum, Dated 15.11.2019 Corrigendum, Dated 22.11.2019 | 22/10/2019 | 28.11.2019 till 3:00 PM | Download BOQ |
| IIT(BHU)/IWD/CT-47/2019-20/1380 | Institute Works Department, IIT(BHU), Varanasi | Removing of old Asbestos sheet & P/F puff panel roofing, false ceiling, tiles flooring and painting work of ID Lab of Main workshop, IIT (BHU) Varanasi. Corrigendum, Dated 23.10.2019 Corrigendum, Dated 15.11.2019 | 22/10/2019 | 21.11.2019 till 3:00PM. | Download BOQ |
| IIT(BHU)/IWD/CT-48/2019-20/1381 | Institute Works Department, IIT(BHU), Varanasi | Construction of Light Weight Structure for (with puff panel roofing/ puff panel walls) including internal false ceiling and vitrified tiles flooring (Left & Right side) on the Second floor in Department of Physics, IIT (BHU), Varanasi. Corrigendum, Dated 23.10.2019 Corrigendum, Dated 22.11.2019 Corrigendum, Dated 01.01.2021 | 22/10/2019 | 28.11.2019 till 3:00 PM | Download BOQ |
| IIT(BHU)/IWD/CT-49/2019-20/1382 | Institute Works Department, IIT(BHU), Varanasi | Providing & fixing Corrugated puff panel roofing after removing of old G.I. profile sheet of Production lab in Department of Mechanical Engineering, IIT(BHU), Varanasi. Corrigendum, Dated 23.10.2019 Corrigendum, Dated 15.11.2019 Corrigendum, Dated 22.11.2019 Corrigendum, Dated 01.01.2021 | 22/10/2019 | 28.11.2019 till 3:00 PM | Download BOQ |
| IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/22 | Dean (Academic Affairs) Office. | Quotations for Stall for Poster Display | 18/10/2019 | 27/10/2019. | — |
| IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/21 | Dean (Academic Affairs) Office. | Quotations for Illumination of Buildings with LED focus Lights | 18/10/2019 | 27/10/2019. | — |
| IIT(BHU)/IWD/CT-33/2019-20/1361 | Institute Works Department | Construction of slab above staircase opening, providing and fixing of aluminum partition in the chamber of Dr. Naval Kishor, repairing of plaster, scrapping and painting of passage and staircase of all floor of Mining Engineering. Download BOQ Corrigendum, Dated 11.11.2019 Corrigendum, Dated 19.11.2019 Corrigendum, Dated 26.11.2019 Corrigendum, Dated 29.11.2019 Corrigendum, Dated 06.12.2019 Corrigendum, Dated 13.12.2019 Cancellation: Dated 10.08.2021 | 18/10/2019 | 05/11/2019 up to till 15:00 hrs | — |
| IIT(BHU)/IWD/CT-50/2019-20/1383 | Institute Works Department | Construction of profile shed for patrolling vehicle parking at proctor office, IIT(BHU) Corrigendum, Dated 29.10.2019 Corrigendum, Dated 04.11.2019 Corrigendum, Dated 15.11.2019 Corrigendum, Dated 25.11.2019 Cancellation: Dated 05.12.2019 | 18/10/2019 | 28.11.2019 till 3:00 PM | — |
| IIT(BHU)/IWD/ET-11/2019-20/1384 | Institute Works Department | Supply, installation, testing and commissioning of Battery Charger and Battery Bank in IWD, IIT (BHU) Varanasi Corrigendum, Dated 29.10.2019 Corrigendum, Dated 04.11.2019 Corrigendum, Dated 15.11.2019 Corrigendum, Dated 25.11.2019 | 18/10/2019 | 25.11.2019 till 3:00PM | — |
| IIT (BHU)/IWD/2019-20/1377 | Registrar Office, IIT (BHU) Varanasi | Comprehensive Design Engineering, Construction & Development of Students’ Hostels and Faculty Apartments at IIT(BHU), Varanasi. Download BOQ Corrigendum, Dated 07.11.2019 Corrigendum, Dated 13.11.2019 | 17/10/2019 | 21/11/2019 at 4:00 P.M | — |
| IIT(BHU)/IWD/CT-30/2019-20/1316 | Institute Works Department | Providing & laying vitrified tile flooring, false ceiling, aluminium partition and Painting work in Engineering Geo-science lab of Department of Civil Engineering, IIT(BHU), Varanasi | 15/10/2019 | 05/11/2019 up to till 15:00 hrs | Download BOQ |
| IIT(BHU)/IWD/CT-31/2019-20/1317 | Institute Works Department | P/F of Aluminum partition, Granite flooring, false ceiling in Electrical Machines and Drive lab in Electrical Engg | 15/10/2019 | 05/11/2019 up to till 15:00 hrs | Download BOQ |
| IIT(BHU)/IWD/CT-32/2019-20/1318 | Institute Works Department | Renovation of toilet at 1st floor & 2nd floor & Construction of chain link fencing in front of porch (From north side to west side) of Mining Engineering | 15/10/2019 | 05/11/2019 up to till 15:00 hrs | Download BOQ |
| IIT(BHU)/IWD/CT-34/2019-20/1319 | Institute Works Department | P/F aluminium partition work for 7 nos rooms (at first floor) in production lab in Department of Mechanical Engineering | 15/10/2019 | 05/11/2019 up to till 15:00 hrs | Download BOQ |
| IIT(BHU)/IWD/CT-36/2019-20/1320 | Institute Works Department | Water proofing treatment of roof of Department of Metallurgical Engineering | 15/10/2019 | 05/11/2019 up to till 15:00 hrs | — |
| IIT(BHU)/IWD/CT-37/2019-20/1321 | Institute Works Department | Repair to patch plaster, P/A of acrylic smooth exterior paint outer side in Varandah and distempering with oil bound distemper of Mess area, common place (Visitor room, Staircase & toilets) of S. Ramanujan Hostel | 15/10/2019 | 05/11/2019 up to till 15:00 hrs | Download BOQ |
| IIT(BHU)/IWD/CT-38/2019-20/1322 | Institute Works Department | P/F aluminium partition, false ceiling, tile flooring, construction working platform with granite and painting work in Pharmaceutical Chemistry Lab Room No. 1 Corrigendum, Dated 06.11.2019 Corrigendum, Dated 15.11.2019 Corrigendum, Dated 22.11.2019 Corrigendum, Dated 29.11.2019 Corrigendum, Dated 06.12.2019 Corrigendum, Dated 13.12.2019 | 15/10/2019 | 19.12.2019 at 3:00 P.M | Download BOQ |
| IIT(BHU)/IWD/CT-39/2019-20/1323 | Institute Works Department | Special repair of Slab and beam (Guniting work) of front & back side Corridor and left & right side corridor (at 1st floor) and painting work, Rampur Hall and Control system & Network Lab Download BOQ | 15/10/2019 | 21.11.2019 till 3:00 PM | — |
| IIT (BHU)/IWD/CT-40/2019-20/1324 | Institute Works Department | Repairing to patch plaster & chajja, Removing of painting and Finishing walls with Acrylic Smooth exterior (outer wall) of Production lab, new Building and old Building (including Office, drawing section, fluid mechanics, Tribology lab, Dynamics lab, CIMS and Ergonomic Labs) | 15/10/2019 | 05/11/2019 up to till 15:00 hrs | Download BOQ |
| IIT (BHU)/IWD/CT-29/2019-20/1341 | Institute Works Department | Guniting of rooms between room no- 01 to 94 (Ground Floor) & room no- 95 to 141 (First Floor, Left side), painting with OBD, doors & windows repairing | 15/10/2019 | 05.12.2019 at 3:00 PM | Download BOQ |
| IIT (BHU)/IWD/CT-43/2019-20/1343 | Institute Works Department | Renovation of Kitchen Block Including Dismantling Old Window & Door, P/F of uPVC Window & Panelled Door, P/L Vitrified Tiles, Plastering of Wall, Putty and Distempering at Ground Floor | 15/10/2019 | 05/11/2019 up to till 15:00 hrs | Download BOQ |
| IIT (BHU)/IWD/CT-44/2019-20/1344 | Institute Works Department | Renovation of Kitchen Block Including Dismantling Old Window & Door, P/F of uPVC Window & Panelled Door, P/L Vitrified Tiles, Plastering of Wall, Putty and Distempering at Ground Floor | 15/10/2019 | 05/11/2019 up to till 15:00 hrs | Download BOQ |
| IIT (BHU)/IWD/CT-41/2019-20/1345 | Institute Works Department | Renovation of toilet (in front of Class rooms G-1 and at office area) in Department of Civil Engineering, IIT(BHU) Varanasi | 14/10/2019 | 25.11.2019 till 3:00 PM | - |
| IIT (BHU)/IWD/CT-42/2019-20/1346 | Institute Works Department | Water proofing work of existing old roof in mess area of Rajputana Hostel & others IIT(BHU), Varanasi | 14/10/2019 | 18.10.2019 (03:00 PM) | - |
| IIT (BHU)/IWD/CT-45/2019-20/1347 | Institute Works Department | Renovation of toilet (GF&FF) office of the Department of Mechanical Engineering, IIT(BHU) Varanasi | 14/10/2019 | 25.11.2019 till 3:00PM | - |
| IIT (BHU)/IPCell/e-Auction/2019-20/492 | Institute purchase cell | Disposal of unserviceable stores /goods lying at departments of IIT(BHU) | 11/10/2019 | 01-11-2019 (04:00 PM) | Download BOQ |
| IIT (BHU)/IPCell/e-Auction/2019-20/493 | Institute purchase cell | Disposal of unserviceable stores /goods lying at Main Workshop | 11/10/2019 | 01-11-2019 (04:00 PM) | Download BOQ |
| IIT (BHU)/IPCell/e-Auction/2019-20/494 | Institute purchase cell | Disposal of unserviceable stores /goods lying at Department of Mechanical Engineering | 11/10/2019 | 01-11-2019 (04:00 PM) | Download BOQ |
| IIT(BHU)/IWD/19-20/1306 | Institute Works Department | Document for Empanelment of architects cum consultant | 11/10/2019 | 31-10-2019 (04:00 PM) | Download BOQ |
| IIT(BHU)/EOI/2019-20/PPC/01 | Press and publicity Committee | Request for Expression of Interest for Media Outreach Proposal | 10/10/2019 | 31-10-2019 (04:00 PM) | - |
| IIT(BHU)/CT-17/2019-20/1271 | Institute Works Department | Water proofing work of existing old roof in mess area of Rajputana Hostel and others | 09/10/2019 | 16.10.2019 at 3:00 PM | - |
| IIT(BHU)/IWD/CT-22/2019-20/1272 | Institute Works Department | Providing and fixing of door shutter with frame in S.C. De Hostel rooms | 09/10/2019 | 16.10.2019 at 3:00 PM | - |
| IIT(BHU)/IWD/CT-23/2019-20/1273 | Institute Works Department | Construction of guard post at Gandhi Smriti crossing | 09/10/2019 | 16.10.2019 at 3:00 PM | - |
| IIT(BHU)/IWD/CT-24/2019-20/1274 | Institute Works Department | Providing and fixing aluminium partition, false ceiling and painting work in Room No. 9 | 09/10/2019 | 16.10.2019 at 3:00 PM | - |
| IIT(BHU)/IWD/CT-25/2019-20/1275 | Institute Works Department | Aluminium partition, false ceiling and renovation works in Room No. 10 and toilets | 09/10/2019 | 16.10.2019 at 3:00 PM | - |
| IIT(BHU)/IWD/CT-26/2019-20/1276 | Institute Works Department | Aluminium partition work in Room No (F-3, F-4 & F-5) at first floor | 09/10/2019 | 16.10.2019 at 3:00 PM | - |
| IIT(BHU)/IWD/CT-27/2019-20/1277 | Institute Works Department | Boundary wall repair, grill refixing, plastering and badminton court construction at Aryabhatta-II Hostel | 09/10/2019 | 16.10.2019 at 3:00 PM | - |
| IIT(BHU)/IWD/CT-28/2019-20/1278 | Institute Works Department | Repair to plaster, waterproofing coating, distempering and exterior painting of Aryabhatta Hostel-II | 09/10/2019 | 16.10.2019 at 3:00 PM | - |
| IIT(BHU)/IWD/ET-04/2019-20/1268 | Institute Works Department | Area lighting work of Volleyball Girls court at Rajputana Ground | 04/10/2019 | 10.10.2019 at 3:30 PM | - |
| IIT(BHU)/IWD/ET-05/2019-20/1267 | Institute Works Department | Area lighting work of Handball court in Gymkhana Ground | 04/10/2019 | 10.10.2019 at 3:30 PM | - |
| IIT(BHU)/IWD/ET-06/2019-20/1266 | Institute Works Department | Area lighting work of Kho-Kho and Lawn Tennis courts | 04/10/2019 | 10.10.2019 at 3:30 PM | - |
| IIT(BHU)/IWD/ET-07/2019-20/1265 | Institute Works Department | Area lighting work of Kabaddi and Basketball courts | 04/10/2019 | 10.10.2019 at 3:30 PM | - |
| IIT(BHU)/IWD/ET-08/2019-20/1264 | Institute Works Department | Area lighting work of Cricket practice net and Boxing court | 04/10/2019 | 10.10.2019 at 3:30 PM | - |
| IIT(BHU)/IWD/ET-09/2019-20/1270 | Institute Works Department | Electrical wiring and illumination works in Lab No 1, Pharmaceutical Engineering | 04/10/2019 | 18.10.2019 till 3:00 PM | - |
| IIT(BHU)/IWD/ET-10/2019-20/1269 | Institute Works Department | Supply, installation and commissioning of LT power distribution panel | 04/10/2019 | 10.10.2019 at 3:30 PM | - |
| IIT(BHU)/CE/2019-20/1610 | Civil Engineering | Supply of “Flow Tracker II Lab ADV” | 04/10/2019 | 20-10-2019 (05:00 PM) | Download BOQ |
| IIT(BHU)ChE/2019-20/QTN/105 | Chemical Engineering & Tech. | Quotation Enquiry for Fuel Cell Stack Hardware | 04/10/2019 | 25-10-2019 | - |
| IIT(BHU)/IP Cell/Vehicle/2019-20/477 | Registrar, IIT (BHU) | Hiring of vehicle rate | 04/10/2019 | 14-10-2019 (15:00 hrs) | - |
| IIT(BHU)/ChE/2019-20/QTN/99 | Chemical Engineering & Tech. | Supply of Digital Mass Flow Controllers for H2 and O2 gases | 01/10/2019 | 22-10-2019 | - |
| IIT(BHU)/CSE/2019-20/337 (Re-Tender) | Computer Science and Engineering | Supply, Installation of Equipment and Setup of Networking LAB (Re-Tender) | 11/09/2019 | 09-10-2019 (15:00 Hrs) | Download BOQ |
| IIT(BHU)/Gym/SKT/2019-20/186 | Gymkhana IIT (BHU) | Sound Light & Tent services for Spardha, Kashiyatra & Technex | 30/09/2019 | 11-10-2019 (04:00 PM) | - |
| IIT(BHU)/SMST/2019-20/Glove Box/285 | School of Materials Science & Technology | Supply of Intermetallic Sample Preparation setup with Glove Box | 26/09/2019 | 18-10-2019 (04:00 PM) | Download BOQ |
| IIT(BHU)/ME/2019-20/RKG/12/QTN | Mechanical Engineering | Supply of Bio-Tribometer with electrochemical workstation system | 24/09/2019 | 30/10/2019 (03:00 PM) | Download BOQ |
| IIT(BHU)/EC/2019-20/301 | Electronics Engineering | Supply of LabVIEW and Embedded Control & Monitoring System | 23/09/2019 | 14-10-2019 (04:00 PM) | Download BOQ |
| IIT(BHU)/CHE/AV/19-20/TD/03 | Chemical Engineering & Tech. | Supply of Motorized Upright Fluorescence Research Microscope | 21/09/2019 | 11-10-2019 (05:00 PM) | Download BOQ |
| IIT(BHU)/CER/2019-20/UTM/ENQ/31 | Ceramic Engineering | Supply of Universal Testing Machine (10kN) | 17/09/2019 | 10-10-2019 (03:00 PM) | Download BOQ |
| IIT(BHU)BHU)/EE/NKSN/ECR/19-20/02 | Electrical Engineering | Programmable bi-directional DC power supply with battery emulation | 16/09/2019 | 15-10-2019 (04:00 PM) | Download BOQ |
| IIT(BHU)BHU/MIN/HD/2019-20/2740 | Mining Engineering | Ground Vibration Meter (Technical Specifications) | 16/09/2019 | 04-10-2019 (03:00 PM) | Download BOQ |
| IIT(BHU)/PH/FY/2019-20/QTN/M/29 | Pharmaceutical Engineering & Tech. | Supply and Installation of UV-Vis Double Beam Spectrophotometer | 13/09/2019 | 01-10-2019 (15:00 Hrs) | - |
| IIT(BHU)/PH/FY/2019-20/QTN/M/28 | Pharmaceutical Engineering & Tech. | Supply and Installation of Rotavapor, Vacuum Pump and Chiller | 13/09/2019 | 01-10-2019 (15:00 Hrs) | - |
| IIT(BHU)/CSE/2019-20/337 | Computer Science and Engineering | Supply, Installation of Equipment and Setup of Networking LAB Download BOQ Corrigendum: 01.10.2019 Corrigendum: 16.09.2019 | 11/09/2019 | 01/10/2019 (15:00 Hrs) | 03/10/2019 (15:30 Hrs) |
| IIT(BHU)/ACAD/Convocation/Purchase/2019-20/QTN/06 | Academic Affairs | Tender enquiry for procurement of Sadri Corrigendum: 19.09.2019 | 06/09/2019 | 20/09/2019 | — |
| IIT(BHU)/SMST/2019-20/Spectrophotometer/236 | School of Materials Science and Technology | Supply of Steady State and Lifetime Bench-top Spectrophotometer Download BOQ Corrigendum: 30.09.2019 | 06/09/2019 | 14/10/2019 03:00 PM | 15/10/2019 03:30 PM |
| IIT(BHU)/SMST/2019-20/FS/235 | School of Materials Science and Technology | Supply of STEADY STATE Fluorescence Spectrophotometer setup Download BOQ Corrigendum: 30.09.2019 | 06/09/2019 | 14/10/2019 03:00 PM | 15/10/2019 03:30 PM |
| IIT(BHU)/SMST/2019-20/UV-VIS/234 | School of Materials Science and Technology | Supply of UV–VIS PC Control Spectrophotometer setup Download BOQ | 06/09/2019 | 27/09/2019 05:00 PM | 30/09/2019 16:30 PM |
| IIT(BHU)/SMST/2019-20/FTIR/233 | School of Materials Science and Technology | Supply of FTIR Spectrometer setup Download BOQ | 06/09/2019 | 27/09/2019 05:00 PM | 30/09/2019 16:30 PM |
| R&D/SERB/Met//19-20/02 | Department of Metallurgical Engineering | Online Micro-Gas Chromatograph / Multi-Gas Analyzer Download BOQ Corrigendum: 30.09.2019 | 06/09/2019 | 14/10/2019 03:00 PM | 15/10/2019 15:30 Hrs |
| IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/10 | Dean (Academic Affairs) Office | Quotation Enquiry for Catering Items | 06/09/2019 | 20/09/2019 16:00 Hrs | — |
| IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/09 | Dean (Academic Affairs) Office | Quotation Enquiry for Proceedings & Brochure | 06/09/2019 | 20/09/2019 16:00 Hrs | — |
| IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/07 | Dean (Academic Affairs) Office | Flex & Sound Light System | 06/09/2019 | 20/09/2019 | — |
| IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/08 | Dean (Academic Affairs) Office | Tent materials for Food Stall | 06/09/2019 | 20/09/2019 16:00 Hrs | — |
| IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/05 | Dean (Academic Affairs) Office | Quotation Enquiry for Minting of Medals | 06/09/2019 | 20/09/2019 16:00 Hrs | — |
| IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/04 | Dean (Academic Affairs) Office | Leatherite Degree Folder (with IIT(BHU) Logo) | 06/09/2019 | 20/09/2019 16:00 Hrs | — |
| IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/02 | Dean (Academic Affairs) Office | Convocation Special Uttariya | 06/09/2019 | 20/09/2019 16:00 Hrs | — |
| IIT(BHU)/ACD/Convocation/Purchase/2019-20/QTN/03 | Dean (Academic Affairs) Office | Jute Bag (IIT(BHU) Centenary Logo) | 06/09/2019 | 20/09/2019 16:00 Hrs | — |
| IIT(BHU)/PH/FY/2019-20/QTN/M/19 | Department of Pharmaceutical Engineering | Quotation Enquiry for Compressor Tablet Machine Download BOQ Corrigendum: 31.01.2020 | 06/09/2019 | 27/09/2019 15:30 Hrs | — |
| IIT(BHU)/Gymkhana/SI/2019-20/147 | Gymkhana IIT(BHU), Varanasi | Quotation Enquiry for Sports Items Annexure I | 04/09/2019 | 13/09/2019 | 16/09/2019 (16:00) |
| IIT(BHU)/Gymkhana/IJ/2019-20/148 | Gymkhana IIT(BHU), Varanasi | Institute Jersey (Playing Kit) Annexure A | 04/09/2019 | 13/09/2019 | 16/09/2019 (16:00) |
| IIT(BHU)/Gymkhana/TS/2019-20/147 | Gymkhana IIT(BHU), Varanasi | Track Suits | 04/09/2019 | 13/09/2019 | 16/09/2019 (16:00) |
| IIT(BHU)/I.P. Cell/A.R.C./2019-20/380 | Institute Purchase Cell | Lab Chemical Glassware & Filter Paper | 04/09/2019 | 25/09/2019 (14:00 Hrs) | — |
| IIT(BHU)/IP Cell/Vehicle/2019-20/381 | Registrar, IIT(BHU), Varanasi | Hiring of Vehicle Rate | 04/09/2019 | 25/09/2019 15:00 Hrs | 26/09/2019 (16:00 PM) |
| IIT(BHU)/ACD/Induction/Purchase/2019-20/QTN/01 | Academic Affairs | Annual Report Printing | 03/09/2019 | 16/09/2019 | — |
| IIT(BHU)/CIV/QTN/2019-20/1178 | Civil Engineering | Purchase of Unmanned Aerial Vehicle | 02/09/2019 | 16/09/2019 05:00 PM | — |
| IIT(BHU)/ME/USR/2019-20/TD/01 | Mechanical Engineering | CNC Wire Cut EDM Machine Download BOQ | 30/08/2019 | 19/09/2019 16:00 Hrs | 20/09/2019 (04:00 PM) |
| IIT(BHU)/IWD/CT-14/2019-20/1000 | Institute Works Department | Providing and Fixing of Aluminium Frame Window with Mosquito Net Download BOQ Corrigendum: 30.08.2019 | 29/08/2019 | 18/09/2019 up to 15:00 hrs | 19/09/2019 15:30 hrs |
| IIT(BHU)/IWD/CT-15/2019-20/1001 | Institute Works Department | Exterior Painting Work and Apron Repair Around Rajputana Hostel Download BOQ Corrigendum: 30.08.2019 Corrigendum: 18.08.2021 | 29/08/2019 | 18/09/2019 up to 15:00 hrs | 19/09/2019 15:30 hrs |
| IIT(BHU)/IWD/CT-16/2019-20/1002 | Institute Works Department | Renovation of Toilets and Bathrooms (S. C. De Hostel) Download BOQ Corrigendum: 30.08.2019 | 29/08/2019 | 18/09/2019 up to 15:00 hrs | 19/09/2019 15:30 hrs |
| IIT(BHU)/IWD/CT-18/2019-20/1003 | Institute Works Department | Construction of Mezzanine Floor for Tinkering Lab Download BOQ Corrigendum: 30.08.2019 | 29/08/2019 | 18/09/2019 up to 15:00 hrs | 19/09/2019 15:30 hrs |
| IIT(BHU)/IWD/CT-19/2019-20/1004 | Institute Works Department | Modification of Common Place & Service Counter Area in IIT Cafeteria Download BOQ Corrigendum: 30.08.2019 | 29/08/2019 | 18/09/2019 up to 15:00 hrs | 19/09/2019 15:30 hrs |
| IIT(BHU)/IWD/CT-20/2019-20/1005 | Institute Works Department | Construction of Boundary Wall outside SC De Hostel Download BOQ Corrigendum: 30.08.2019 | 29/08/2019 | 18/09/2019 up to 15:00 hrs | 19/09/2019 15:30 hrs |
| IIT(BHU)/SBChE/Fermenter/19-20/T01/207 | School of Biochemical Engineering | In Situ Sterilizable Fermenter (SS316) Download BOQ | 26/08/2019 | 16/09/2019 (05:00 PM) | 18/09/2019 (03:00 PM) |
| IIT(BHU)/Newsletter/P.C.I.N | Office of the Chief Editor | Printing of Institute Newsletter | 22/08/2019 | 01/09/2019 | — |
| IIT(BHU)/CHE/AV/19-20/TD/01 | Department of Chemical Engineering | Supply of Equipment Download BOQ | 21/08/2019 | 10/09/2019 (05:00 PM) | 12/09/2019 (04:00 PM) |
| IIT(BHU)/che/2019-20/QTN/77 | Department of Chemical Engineering | Process Dynamics and Control Experimental Setup Annexure I-B Annexure I-C Corrigendum: 28.08.2019 | 20/08/2019 | 09/09/2019 | 11/09/2019 |
| IIT(BHU)/che/2019-20/QTN/74 | Department of Chemical Engineering | Supply of Items (General) Annexure I-B Annexure I-C | 20/08/2019 | 02/09/2019 | 04/09/2019 |
| IIT(BHU)/PHY/accessories/rutherfordexpt/165 | Department of Physics | Rutherford Scattering Experiment Setup Download BOQ | 19/08/2019 | 09/09/2019 (03:00 PM) | 10/09/2019 (03:30 PM) |
| IIT(BHU)/Che/19-20/TD/72 | Department of Chemical Engineering | Supply of Equipments (TD-72) Download BOQ | 13/08/2019 | 26/08/2019 (05:00 PM) | 02/09/2019 (04:00 PM) |
| IIT(BHU)/ChE/2019-20/QTN/68 | Department of Chemical Engineering | Universal Testing Machine Annexure I-B Annexure I-C | 08/08/2019 | 19/08/2019 | 21/08/2019 |
| IIT(BHU)/SMST/2019-20/IR_SNOM/189 | School of Materials Science and Technology | IR-SNOM Setup Download BOQ Corrigendum: 29.08.2019 | 06/08/2019 | 10/09/2019 (03:00 PM) | 13/09/2019 (03:30 PM) |
| IIT(BHU)/ChE/2019-20/QTN/66 | Department of Chemical Engineering | Calorific Value of Fuels (Bomb Method) Annexure I-B Annexure I-C | 05/08/2019 | 16/08/2019 | 19/08/2019 |
| IIT(BHU)/ChE/2019-20/VS/15 | Department of Chemical Engineering | Fluidised Bed Reactor Annexure I-B Annexure I-C | 02/08/2019 | 23/08/2019 | 26/08/2019 |
| IIT(BHU)/IWD/Lift/2019-20/ET-03/604 | Institute Works Department | Comprehensive Maintenance of Passenger Lifts Download BOQ Corrigendum Cancellation | 28/06/2019 | 18/07/2019 up to 15:00 hrs | 19/07/2019 15:30 hrs |
| IIT(BHU)/Min/SKP/2019-20/2511 | Department of Mining Engineering | Human Vibration Analyser/Meter Download BOQ | 25/06/2019 | 15/07/2019 | 17/07/2019 (03:30 PM) |
| IIT(BHU)/IWD/CT/03/2019-20/523 | Institute Works Department | Guniting & Painting Work (Dhanrajgiri Hostel) Download BOQ Corrigendum Cancellation | 18/06/2019 | 03/07/2019 up to 15:00 hrs | 04/07/2019 15:30 hrs |
| IIT(BHU)/Budget/CA/2019-20/02 | Registrar Office | Chartered Accountant Firms e-Tender Download BOQ | 19/07/2019 | 09/08/2019 | — |
| IIT(BHU)/EC/2019-20/113 | Department of Electronics Engineering | UV-Vis Spectrophotometer | 19/07/2019 | 13/08/2019 03:00 PM | — |
| IIT(BHU)/EC/2019-20/102 | Department of Electronics Engineering | Thickness Profilometer Download BOQ | 18/07/2019 | 08/08/2019 03:00 PM | 09/08/2019 03:30 PM |
| IIT(BHU)/ACD/Induction/Purchase/2019-20/QTN/06 | Department of Civil | Quotations Enquiry for Refreshment Items | 15/07/2019 | 21/07/2019 | — |
| IIT(BHU)/ACD/Induction/Purchase/2019-20/QTN/07 | Department of Civil | Quotations Enquiry for Informantion Booklet Printing | 15/07/2019 | 21/07/2019 | — |
| IIT(BHU)/HTL/CoW/19-20/257 | Council of Wardens | Quotations for Photocopier | 15/07/2019 | 13/08/2019 (06:00 PM) | Opening: 16/08/2019 (03:00 PM) | — |
| IIT(BHU)/ChE/2019-20/QTN/52 | Department of Chemical Engg. & Tech. | Quotations for the supply of Split Tube Furnace Annexure I-B Annexure I-C | 12/07/2019 | 19/07/2019 | 22/07/2019 |
| IIT(BHU)/ACD/Induction/Purchase/2019-20/QTN/04 | Department of Civil | Quotations Enquiry Tempo Traveller | 11/07/2019 | 17/07/2019 | — |
| IIT(BHU)/ACD/Induction/Purchase/2019-20/QTN/05 | Department of Civil | Quotations Enquiry Sum Board | 11/07/2019 | 17/07/2019 | — |
| IIT(BHU)/SMST/2019-20/UHV/148 | School of Materials Science | Supply of Multi target UHV sputtering unit BOQ Corrigendum 01.08.2019 | 10/07/2019 | 14/08/2019 (03:00 PM) | 16/08/2019 (03:30 PM) |
| IIT(BHU)/SMST/2019-20/UHV/149 | School of Materials Science | Supply of Cryogenic Compatible FMR/ISHE Spectrometer Setup BOQ Corrigendum 01.08.2019 | 10/07/2019 | 14/08/2019 (03:00 PM) | 16/08/2019 (03:30 PM) |
| III(BHU)/ChE/2019-20/QTN/50 | Department of Chemical Engineering | Quotations Enquiry for Portable Density Meter Annexure I-B Annexure I-C | 02/07/2019 | 18/07/2019 | 22/07/2019 |
| III(BHU)/mining/QTN/SKP/2019-20/ERGO/01 | Department of Mining Engineering | Quotations Enquiry for Purchase of Ergomaster software | 28/06/2019 | 19/07/2019 | — |
| IIT(BHU)/mining/QTN/SKP/2019-20/ANTHR/01 | Department of Mining Engineering | Quotations Enquiry for Purchase of Anthropometer Corrigendum 09.07.2019 | 28/06/2019 | 19/07/2019 | — |
| IIT(BHU)/IWD/Lift/2019-20/ET-03/604 | Institute Works Department | Comprehensive maintenance of passenger lifts BOQ Corrigendum 18.07.2019 Cancellation 27.07.2019 | 28/06/2019 | 18/07/2019 (15:00 hrs) | 19/07/2019 (15:30 hrs) |
| IIT(BHU)/Min/SKP/2019-20/2511 | Department of Mining Engineering | Human Vibration Analyser/Meter BOQ | 25/06/2019 | 15/07/2019 (03:00 PM) | 17/07/2019 (03:30 PM) |
| IIT(BHU)/IWD/CT/03/2019-20/523 | Institute Works Department | Guniting and painting works Dhanrajgiri hostel BOQ Corrigendum 02.07.2019 Cancellation 06.08.2019 | 18/06/2019 | 03/07/2019 (03:00 hrs) | 04/07/2019 (03:30 hrs) |
| IIT(BHU)/IWD/CT/04/2019-20/524 | Institute Works Department | Guniting works Dhanrajgiri hostel (Right side) BOQ Corrigendum 02.07.2019 | 18/06/2019 | 03/07/2019 (03:00 hrs) | 04/07/2019 (03:30 hrs) |
| IIT(BHU)/IWD/CT/05/2019-20/525 | Institute Works Department | Renovation of Kitchen Block S.C. De Hostel BOQ | 18/06/2019 | 28/06/2019 (17:00 hrs) | 01/07/2019 (11:30 hrs) |
| IIT(BHU)/IWD/CT/06/2019-20/526 | Institute Works Department | Renovation of Kitchen Block Vishwakarma Hostel BOQ | 18/06/2019 | 28/06/2019 (17:00 hrs) | 01/07/2019 (11:30 hrs) |
| IIT(BHU)/IWD/CT/07/2019-20/527 | Institute Works Department | Guniting works Dhanrajgiri hostel (Left side G floor) BOQ Corrigendum 02.07.2019 Cancellation 06.08.2019 | 18/06/2019 | 03/07/2019 (03:00 hrs) | 04/07/2019 (03:30 hrs) |
| IIT(BHU)/IWD/CT/08/2019-20/528 | Institute Works Department | Guniting works Dhanrajgiri hostel (Right side G floor) BOQ Corrigendum 02.07.2019 Cancellation 06.08.2019 | 18/06/2019 | 03/07/2019 (03:00 hrs) | 04/07/2019 (03:30 hrs) |
| IIT(BHU)/IWD/CT/09/2019-20/529 | Institute Works Department | Distempering and painting Rajputana Hostel BOQ | 18/06/2019 | 28/06/2019 (17:00 hrs) | 01/07/2019 (11:30 hrs) |
| IIT(BHU)/IWD/CT/10/2019-20/530 | Institute Works Department | Boundary wall construction SC De Hostel BOQ Cancellation 06.08.2019 | 18/06/2019 | 28/06/2019 (17:00 hrs) | 01/07/2019 (11:30 hrs) |
| IIT(BHU)/IWD/CT/11/2019-20/531 | Institute Works Department | Renovation of Kitchen Block S.C. De Hostel (Ground Floor) BOQ Cancellation 06.08.2019 | 18/06/2019 | 28/06/2019 (17:00 hrs) | 01/07/2019 (11:30 hrs) |
| IIT(BHU)/IWD/CT/12/2019-20/532 | Institute Works Department | Renovation of Kitchen Block Vishwakarma Hostel (Ground Floor) BOQ Cancellation 06.08.2019 | 18/06/2019 | 28/06/2019 (17:00 hrs) | 01/07/2019 (11:30 hrs) |
| IIT(BHU)/SMST/2019-20/UHV/85 | School Materials Science and Technology | Supply of Multi target UHV sputtering unit BOQ Corrigendum 10.07.2019 | 07/06/2019 | 28/06/2019 | — |
| IIT(BHU)/SMST/2019-20/FMR/84 | School Materials Science and Technology | Supply of Cryogenic Compatible FMR/ISHE Spectrometer BOQ Corrigendum 10.07.2019 | 07/06/2019 | 28/06/2019 | — |
| IIT(BHU)/SMST/2019-20/UTM/83 | School Materials Science and Technology | Supply of Universal Testing Machine BOQ | 07/06/2019 | 28/06/2019 | — |
| IIT(BHU)/SMST/2019-20/DTMA/82 | School Materials Science and Technology | Supply of Dynamic Thermo-Mechanical Analyzer BOQ | 07/06/2019 | 28/06/2019 | — |
| ChE/19-20/VS/09 | Department of Chemical Engineering | Quotation Inquiry for Gas Chromatograph Annexure I-B Annexure I-C | 07/06/2019 | 28/06/2019 | 12/07/2019 |
| IT/HTL/CoW/19-20/18 | Council of Wardens | Catering Services in New Girls Hostel BOQ Corrigendum 12.06.2019 | 28/05/2019 | 22/06/2019 (05:00 PM) | 25/06/2019 (05:00 PM) |
| IIT(BHU)/IPCell/2019-20/Networking/149 | Institute Purchase Cell | Extension of IIT(BHU) LAN (Wired & Wi-Fi) BOQ Corrigendum series Technical Evaluation Report | 24/05/2019 | 15/06/2019 | — |
| IIT(BHU)/IWD/ET/01/Arch./2019-20/358 | Institute Works Department | Electrical wiring Architecture Department Corrigendum 29.05.2019 | 22/05/2019 | 30/06/2019 (03:00 PM) | — |
| IIT(BHU)/IWD/CT/01/Arch./2019-20/350 | Institute Works Department | Aluminum partition Architecture Department Corrigendum 21.05.2019 | 21/05/2019 | 27/05/2019 | — |
| IIT(BHU)/IWD/CT/02/Arch./2019-20/351 | Institute Works Department | False ceiling and painting Architecture Department Corrigendum 21.05.2019 | 21/05/2019 | 27/05/2019 | — |
| IIT(BHU)/ADM/187/SoM/2019-20/Gen/1022 | Registrar Office IIT(BHU) | Supply of Manpower Tender | 09/05/2019 | — | — |
| IIT (BHU)/ADM/187/SoM/2019-20/Gen/1023 | Registrar Office IIT(BHU) | Tender No. IIT(BHU)/Admin./2018-19/6 dated 11.03.2019 regarding Cleaning and Sanitation. | 09/05/2019 | — | — |
| IIT (BHU)//ADM/187/SoM/2019-20/Gen/1024 | Registrar Office IIT(BHU) | Tender No. IIT(BHU)/Admin./2018-19/5 dated 18.01.2019 regarding Disposal of Solid Waste. | 09/05/2019 | — | — |
| IIT (BHU)//ADM/187/SoM/2019-20/Gen/1025 | Registrar Office IIT(BHU) | Tender No. IIT(BHU)/Admin./2018-19/4 dated 18.01.2019 regarding providing Horticulture/Gardening Services. | 09/05/2019 | — | — |
| IIT(BHU)/Budget/CA/2019-20/01 | Registrar Office IIT(BHU) | Tender for hiring of Chartered Accountant Firms Download BOQ Corrigendum: Dated 20.05.2019 | 03/05/2019 | 25.05.2019 | 27.05.2019 |
| IIT(BHU)/I.P. Cell/FPC/2019-20/43 | Furniture Purchase Committee | Supply of Furniture for Girl’s Hostel Download BOQ Corrigendum: Dated 06.05.2019 | 25/04/2019 | 05.05.2019 | 13.05.2019 |
| ChE/19-20/VS/01 | Department of Chemical Engineering | Quotations inquiry for Multi-Point Dynamic BET Surface Area Analyser Annexure I-B Annexure I-C | 22/04/2019 | 13/05/2019 | 15/05/2019 |
| IIT(BHU)/Admin/2018-19/7 | Registrar Office IIT(BHU) | Clarification regarding Tender Notice Supply of Manpower | 27/03/2019 | — | — |
| CE/IMPRINTProject/2018-19/63 | Department of Civil Engineering | Supply of Sound Level Meter (Type 1/Class 1) Download BOQ Corrigendum: Dated 19.03.2019 | 15/03/2019 | 05/04/2019 | 08/04/2019 |
| IIT(BHU)/IWD/CT/92/2018-19/3211 | Institute Works Department | Limited tender for platform with granite top and stainless steel frame | 27/02/2019 | 05/02/2019 | 05/02/2019 |
| IIT(BHU)/IWD/CT/93/2018-19/3212 | Institute Works Department | Platform with granite top and stainless steel frame (Room No. 15) | 27/02/2019 | 05/02/2019 | 05/02/2019 |
| IIT(BHU)/IWD/CT/94/2018-19/3213 | Institute Works Department | Limited tender for platform with granite top and stainless steel hollow tube frame (Room No-13,14 & 16) | 27/02/2019 | 05/02/2019 | 05/02/2019 |
| IIT(BHU)/IWD/CT/95/2018-19/3214 | Institute Works Department | Platform with granite top and stainless steel hollow tube frame (Room No-17 & Computer room) | 27/02/2019 | 05/02/2019 | 05/02/2019 |
| IIT(BHU)/IWD/CT/97/2018-19/3215 | Institute Works Department | Providing and fixing curtain at A-9 Principal Colony Corrigendum: Dated 28.06.2019 | 27/02/2019 | 05/02/2019 | 05/02/2019 |
| DIC-IIT(BHU)/2018-19/296 | Design Innovation Centre | Thin Film Deposition System 1 complete Unit Download BOQ | 20/02/2019 | 12/03/2019 | 13/03/2019 |
| IIT(BHU)/18-19/105 | Department of Mechanical Engineering | High Strength Color Polymer 3D Printer Download BOQ Corrigendum | 14/02/2019 | 15/03/2019 | 18/03/2019 |
| IIT(BHU)/18-19/106 | Department of Mechanical Engineering | Composite 3D Printer Download BOQ | 14/02/2019 | 07/03/2019 | 08/03/2019 |
| IIT(BHU)/18-19/107 | Department of Mechanical Engineering | Ceramic/Clay 3D Printer Download BOQ | 14/02/2019 | 07/03/2019 | 08/03/2019 |
| IIT(BHU)/18-19/108 | Department of Mechanical Engineering | BIO-3D Printer Download BOQ | 14/02/2019 | 07/03/2019 | 08/03/2019 |
| IIT(BHU)/MET-RS/QTN/995/2018-19 | Department of Metallurgical Engineering | Automatic film coater | 12/02/2019 | 20/02/2019 | — |
| IIT(BHU)/MET-RS/QTN/996/2018-19 | Department of Metallurgical Engineering | Calendering press | 12/02/2019 | 20/02/2019 | — |
| IIT(BHU)/CHY/2018-19/dispensing | Department of Chemistry | Precision Liquid EFD Dispensing system Download BOQ Corrigendum | 12/02/2019 | 15/03/2019 | 19/03/2019 |
| IIT(BHU)/CIF/2018-19/Impedance Analyzer | Central Instrument Facility | Impedance Analyzer with temperature attachments Download BOQ Corrigendum | 09/02/2019 | 05/03/2019 | 18/03/2019 |
| IIT(BHU)/CIF/2018-19/Table Top SEM | Central Instrument Facility | Table Top Scanning Electron Microscope Download BOQ Corrigendum | 09/02/2019 | 05/03/2019 | 18/03/2019 |
| IIT (BHU)/ADM/187/SoM/2019-20/Gen/1023 | Registrar Office IIT(BHU) | Tender No. IIT(BHU)/Admin./2018-19/6 dated 11.03.2019 regarding Cleaning and Sanitation. | 09/05/2019 | — | — |
| IIT (BHU)//ADM/187/SoM/2019-20/Gen/1024 | Registrar Office IIT(BHU) | Tender No. IIT(BHU)/Admin./2018-19/5 dated 18.01.2019 regarding Disposal of Solid Waste. | 09/05/2019 | — | — |
| IIT (BHU)//ADM/187/SoM/2019-20/Gen/1025 | Registrar Office IIT(BHU) | Tender No. IIT(BHU)/Admin./2018-19/4 dated 18.01.2019 regarding providing Horticulture/ Gardening Services. | 09/05/2019 | — | — |
| IIT(BHU)/Budget/CA/2019-20/01 | Registrar Office IIT(BHU) | Tender for hiring of Chartered Accountant Firms. | 03/05/2019 | 25/05/2019 | 27/05/2019 |
| IIT(BHU)/I.P. Cell/FPC/2019-20/43 | Furniture Purchase Committee | Supply of Furniture for Girl’s Hostel | 25/04/2019 | 05/05/2019 | 13/05/2019 |
| ChE/19-20/VS/01 | Department of Chemical Engineering | Quotations inquiry for Multi-Point Dynamic BET Surface Area Analyser. | 22/04/2019 | 13/05/2019 | 15/05/2019 |
| IIT(BHU)/Admin/2018-19/7 | Registrar Office IIT(BHU) | Clarification regarding Tender Notice No(BHU)/Admin/2018-19/7 dated 11th Mar, 2019 (Supply of Manpower). | 27/03/2019 | — | — |
| CE/IMPRINTProject/2018-19/63 | Department of Civil Engineering | Supply of Sound Level Meter (Type 1/Class 1) with dB, octave band and with/without seismic vibration measurement. | 15/03/2019 | 05/04/2019 | 08/04/2019 |
| IIT(BHU)/IWD/CT/92/2018-19/3211 | Institute Works Department | Platform with granite top and stainless steel hollow tube frame work (Lab furniture work). | 27/02/2019 | 05/02/2019 | 05/02/2019 |
| IIT(BHU)/IWD/CT/93/2018-19/3212 | Institute Works Department | Platform with granite top and stainless steel hollow tube frame in Room No. 15, Department of Physics. | 27/02/2019 | 05/02/2019 | 05/02/2019 |
| IIT(BHU)/IWD/CT/94/2018-19/3213 | Institute Works Department | Platform with granite top and stainless steel hollow tube frame in Room No. 13, 14 & 16, Department of Physics. | 27/02/2019 | 05/02/2019 | 05/02/2019 |
| IIT(BHU)/IWD/CT/95/2018-19/3214 | Institute Works Department | Platform with granite top and stainless steel hollow tube frame in Room No. 17 & Computer Room, Department of Physics. | 27/02/2019 | 05/02/2019 | 05/02/2019 |
| IIT(BHU)/IWD/CT/97/2018-19/3215 | Institute Works Department | Providing and fixing curtain at A-9, Principal Colony, IIT(BHU), Varanasi. | 27/02/2019 | 05/02/2019 | 05/02/2019 |
| DIC-IIT(BHU)/2018-19/296 | Design Innovation Centre | Thin Film Deposition System 1 complete Unit | 20/02/2019 | 12/03/2019 | 13/03/2019 |
| IIT(BHU)/18-19/105 | Department of Mechanical | High Strength Color Polymer 3D Printer – Committee requirement | 14/02/2019 | 15/03/2019 | 18/03/2019 |
| IIT(BHU)/18-19/106 | Department of Mechanical | Composite 3D Printer – Committee requirement | 14/02/2019 | 07/03/2019 | 08/03/2019 |
| IIT(BHU)/18-19/107 | Department of Mechanical | Ceramic/Clay 3D Printer – Committee requirement | 14/02/2019 | 07/03/2019 | 08/03/2019 |
| IIT(BHU)/18-19/108 | Department of Mechanical | BIO-3D Printer – Committee requirement | 14/02/2019 | 07/03/2019 | 08/03/2019 |
| IIT(BHU)/MET-RS/QTN/995/2018-19 | Department of Metallurgical Engineering | Automatic film coater (quotation inquiry) | 12/02/2019 | 20/02/2019 | — |
| IIT(BHU)/MET-RS/QTN/996/2018-19 | Department of Metallurgical Engineering | Calendering press (quotation inquiry) | 12/02/2019 | 20/02/2019 | — |
| IIT(BHU)/CHY/2018-19/dispensing | Department of Chemistry | Precision Liquid EFD Dispensing system for screen printing | 12/02/2019 | 15/03/2019 | 19/03/2019 |
| IIT(BHU)/CIF/2018-19/Impedance Analyzer | Central Instrument Facility | Impedance Analyzer with low and high temperature measurement attachments | 09/02/2019 | 05/03/2019 | 18/03/2019 |
| IIT(BHU)/CIF/2018-19/Table Top SEM | Central Instrument Facility | Table Top Scanning Electron Microscope (complete unit) | 09/02/2019 | 05/03/2019 | 18/03/2019 |
| IIT(BHU)/CSE/CCIS/2018-19/777 | Department of Computer Science and Engineering | Upgradation of Supermicro Workstation Model: 747-20 | 04/02/2019 | 14/02/2019 | — |
| IIT(BHU)CER/PS/2018-19/Glove-Box | Department of Ceramic Engineering | Glove Box equipped with Electrochemical Test Station | 04/02/2019 | 04/03/2019 | 05/03/2019 |
| IIT(BHU)/FPC/2018-19/894 | Furniture Purchase Committee | Supply of Kitchen Equipment for Girl’s Hostel | 04/02/2019 | 26/02/2019 | 28/02/2019 |
| IIT(BHU)/FPC/2018-19/893 | Furniture Purchase Committee | Supply of Furniture for Girl’s Hostel | 04/02/2019 | 26/02/2019 | 28/02/2019 |
| IIT(BHU)/IWD/CT/89/2018-19/3062 | Institute Works Department | Aluminium partition, false ceiling and painting work (CNC Laboratory) | 01/02/2019 | 12/02/2019 | 12/02/2019 |
| IIT(BHU)/IWD/CT/90/2018-19/3063 | Institute Works Department | Granite work and M.S. gate of CNC Laboratory Main Workshop | 01/02/2019 | 12/02/2019 | 12/02/2019 |
| IIT(BHU)/IWD/CT/91/2018-19/3064 | Institute Works Department | Aluminium partition, false ceiling and laboratory renovation work (Chemistry Dept.) | 01/02/2019 | 08/02/2019 | 08/02/2019 |
| IIT(BHU)/SMST/PM/2018-19/techtransfer/1 | School of Materials Science and Technology | Transfer of technology of Indian patent application No. 201911002765 | 01/02/2019 | 10/02/2019 | — |
| IIT(BHU)/IWD/CT/81/2018-19/2910 | Institute Works Department | Renovation of bathrooms, badminton court, canteen area, and sewer repair work | 01/02/2019 | 25/03/2019 | 26/03/2019 |
| IIT(BHU)/IWD/CT/82/2018-19/2911 | Institute Works Department | Aluminium window with mosquito net (Gandhi Smriti Mahila Chhatravas) | 01/02/2019 | 25/03/2019 | 26/03/2019 |
| IIT(BHU)/IWD/CT/83/2018-19/2912 | Institute Works Department | Repair and maintenance work in Chemical Engineering corridor | 01/02/2019 | 25/03/2019 | 26/03/2019 |
| IIT(BHU)/I.PCell/CPC/2018-19/876 | Office of the Registrar | Quotation for lunch, tea & snacks for LEAP programme | 30/01/2019 | 08/02/2019 | — |
| IIT(BHU)/IPCell/2018-19/Networking/873 | Institute Networking Committee | Supply, installation and commissioning of extension of IIT(BHU) LAN (wired and Wi-Fi) | 29/01/2019 | 27/02/2019 | 28/02/2019 |
| IIT(BHU)/SMST/RP/2018-19/Imprint/Gas Chamber | School of Materials Science and Technology | Gas sensing chamber with MFC (complete unit) | 29/01/2019 | 26/02/2019 | 27/02/2019 |
| IIT(BHU)/EE/2018-19/139 | Department of Electrical Engineering | Programmable single phase AC and DC electronic load (quotation) | 24/01/2019 | 14/02/2019 | — |
| IIT(BHU)/CSE/CCIS/2018-19/740 | Centre for Computing and Information Services | Supply, installation and commissioning of workstations | 23/01/2019 | 12/02/2019 | 12/02/2019 |
| IIT(BHU)/min/QTN/2018-19/1990 | Department of Mining Engineering | Quotation for Li-ion prismatic cells (3.6V, 90Ah) | 22/01/2019 | 09/02/2019 | — |
| IIT(BHU)/HTL/CoW/2018-19/168 | Council of Wardens | Supply of Aqua Guard water purifiers (approx. 105 units) | 22/01/2019 | 26/02/2019 | 27/02/2019 |
| IIT(BHU)/CIF/2018-19/BET | Central Instrument Facility | High-performance surface area measurement system (physisorption/chemisorption) | 22/01/2019 | 18/02/2019 | 21/02/2019 |
| IIT(BHU)/CIF/2018-19/ICP-MS | Central Instrument Facility | Inductively Coupled Plasma Mass Spectrometry (ICP-MS) | 22/01/2019 | 11/02/2019 | 13/02/2019 |
| IIT(BHU)/IPCell/CPC/2018-19/858 | Institute Purchase Cell | Supply of exhibition items (Octonorm stall, matting, etc.) | 21/01/2019 | 25/01/2019 | — |
| IIT(BHU)/IPCell/CPC/2018-19/857 | Institute Purchase Cell | Quotation enquiry for drafting, designing and printing of books | 21/01/2019 | 25/01/2019 | — |
| MET-IIT(BHU)/2018-19/01 | Department of Metallurgical Engineering | In-situ Heating Holder (Single/Double) – complete unit | 18/01/2019 | 17/02/2019 | 18/02/2019 |
| IIT(BHU)/Admin/2018-19/4 | Registrar Office IIT(BHU) | Gardening/Horticulture services for institute premises | 18/01/2019 | 07/02/2019 | 08/02/2019 |
| IIT(BHU)/Admin/2018-19/5 | Registrar Office IIT(BHU) | Disposal of solid waste (wet and dry) from institute premises | 18/01/2019 | 18/02/2019 | 19/02/2019 |
| IIT(BHU)/PH/FY/2018-19/QTN/M/72 | Department of Pharmaceutical Engineering | Pre-clinical in-vivo imaging system for small animals | 17/01/2019 | 23/02/2019 | 25/02/2019 |
| IIT(BHU)/R&A/Cent.Celeb./2018-19/810 | Centenary Celebration Committee | Quotation enquiry for special Uttariya (ceremonial cloth) | 16/01/2019 | 27/01/2019 | — |
| IIT(BHU)/IWD/2018-19QTN/CE/3890 | Civil Engineering Department | Rotational viscometer (digital) with Thermosel | 14/01/2019 | 04/02/2019 | — |
| IIT(BHU)/IWD/CT/76/2018-19/2880 | Institute Works Department | Precast concrete seating benches supply | 09/01/2019 | 17/01/2019 | 18/01/2019 |
| IIT(BHU)/IWD/CT/84/2018-19/2881 | Institute Works Department | Renovation and civil works (various institute locations) | 09/01/2019 | 17/01/2019 | 18/01/2019 |
| IIT(BHU)/Che/18-19/T-RS/450 | Department of Chemical Engineering | Quotations enquiry for Supply of 2D Electrophoresis setup Enquiry Document Download BOQ Template | 04/01/2019 | 26.01.2019 | 28-01-2019 (3.30 PM) |
| IIT(BHU)/IPCell/2018-19/PRI/800 | Institute Purchase Cell | Quotations are invited for Supply and Installation of PRI Line Corrigendum: Dated 16.01.2019 | 03/01/2019 | 25.01.2019 | — |
| IIT(BHU)/EC/2018-19/SB/1523 | Department of Electronics Engineering | 44 GHz Handheld Vector Network Analyzer 1 complete Unit Download BOQ Template Corrigendum: Dated 21.01.2019 | 01/01/2019 | 31/01/2019 (03.00 PM) | 01/02/2019 (03:30 PM) |