Tenders - 2022-23

Tenders (2022-23)

Ref.No.Dept. NameDescriptionUpload DateClosing DateAttachments
IIT(BHU)/COE/MTD/2022-23/TD/005CoEMTDMulti-Channel Electrochemical Work Station with Frequency Response Analyzer for Centre of Excellence on Machine Tools Design30.03.202319.04.2023Download BOQ
IIT(BHU)/COE/MTD/2022-23/TD/002CoEMTD50kN Servo Hydraulic Static & Dynamic Testing Machine for Centre of Excellence on Machine Tools Design30.03.202319.04.2023Download BOQ
IIT(BHU)/COE/MTD/2022-23/TD/003CoEMTDFully Automatic Micro Vickers Hardness Tester with Electromagnetic Loading for Centre of Excellence on Machine Tools Design30.03.202319.04.2023Download BOQ
IIT(BHU)/COE/MTD/2022-23/TD/004CoEMTDMetallurgical Facilities for Microstructural Analysis with Image Processing Software for Centre of Excellence on Machine Tools Design30.03.202319.04.2023Download BOQ
IIT(BHU)/IWD/CT-57/2022-23/2259IWDRepairing to patchs and overlay of bituminous Road from Main road Gate (Middle road of Electronics & Civil Deptt.) to Mechanical to Architecture Department and road left side of NCC Building30.03.202319.04.2023 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-56/2022-23/2258IWDProviding and fixing of rubber flooring in Gym Hall in I.I.T. Girls Hostel30.03.202319.04.2023 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-55/2022-23/2257IWDLaying of drainage network of storm water drain in Lawn of Guest House, IIT (BHU)30.03.202319.04.2023 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-54/2022-23/2255IWDConstruction of mezzanine floor structure for CoE on Machine Tools Design29.03.202318.04.2023 (4:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/CT-53/2022-23/2254IWDRepair and renovation works of various departments, Adminstrative building and LT-1, IIT(BHU)29.03.202318.04.2023 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-52/2022-23/2233IWDConstruction of 2 nos Tube wells and pipe line connectivity with pump house for hostels, Guest house and Faculty Apartments29.03.202314.04.2023 (4:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/CT-51/2022-23/2232IWDProviding and fixing of fly proof stainless steel grade 304 wire gauge for window net of 144 rooms in Morvi Hostel29.03.202314.04.2023 (4:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/CT-50/2022-23/2231IWDGround floor toilet renovation in Deparment of Pharmaceutics Engineering and Technology29.03.202314.04.2023 (4:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/CT-49/2022-23/2230IWDProviding & fixing of flush door and bathroom/toilet fitting work in Hostels29.03.202314.04.2023 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-48/2022-23/2229IWDProviding and fixing of precoated G.I. profile sheet (Canteen of Limbdi Hostel), P/F of Gate in GSC (Extension) and painting work29.03.202313.04.2023 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-47/2022-23/2217IWDP/F road side sign board both sided front of all shops of Main Workshop29.03.202313.04.2023 (4:00 P.M.)Cancellation of Tender
IIT(BHU)/IWD/CT-46/2022-23/2216IWDPainting work of LT-1,2 and M.Tech classroom of Ceramic engineering29.03.202313.04.2023 (4:00 P.M.) 
IIT(BHU)/IWD/CT-45/2022-23/2215IWDProviding and fixing of faculty chamber in Department of Architecture Engineering29.03.202313.04.2023 (4:00 P.M.)Cancellation of Tender
IIT(BHU)/Ceramic Engg./2022-23/ MRM/SERB/1CeramicSupply, installation, demonstration of Tribometer28.03.202317-04-2023Download BOQ
IIT(BHU)/ME/RS/SRG(2022)/02MechanicalUV lens mountable onto a camera22.03.202312-04-2023Download BOQ
/IIT(BHU)/R&D Varanasi SERB/MET/22-23/01/393/05MetallurgicalVacuum Melt-Spinner Equipment20.03.202308.04.2023Download BOQ
IIT(BHU)/COE/MTD/2022-23/TD/001Mechanical Design, Development, Simulation, and Analysis Facility Along with Power Backup for Centre of Excellence on Machine Tools Design14.03.202304.04.2023Download BOQ
IIT(BHU)/ME/PG/2022-23/BRNS/02MechanicalInduction Heating Power Source of 10 Kw, Five Sides Hermetically Sealed09.03.202328-03-2023Download BOQ
IIT(BHU)/ME/TD/APS/SEEDGRANT/22-23/20MechanicalAngle Encoder14.02.202306-3-2023 (03.00 PM)Download BOQ
IIT(BHU)/ME/TD/APS/SERB(SRG)/22-23/01RMechanicalCombustion Analyser10.02.202302-3-2023 (03.00 PM)Download BOQ
IIT(BHU)/ME/TD/SHD/Seed Grant/22-23/21MechanicalUTM Machine accessories and extensometers & Support 12 Months10.02.2023 02.03.2023 (03.00 PM)Download BOQ
IIT(BHU)/ME/TD/SP/22-23/22MechanicalIBM SPSS Amos Authorized User License + SW Subscription & Support 12 Months- 08 user08.02.202328.02.2023 (03.00 PM)Download BOQ
IIT(BHU)/CE/22-23/SaM/SeedGrant/3295CivilMEMS Accelerometers with Data Acquisition System/Data Logger08.02.202328.02.2023Download BOQ
IIT(BHU)/ME/PG/2022-23/BRNS/01MechanicalInduction Heating Power Source Of 10 Kw, Five Sides Hermetically Sealed07.02.202327-02-2023Download BOQ
IIT(BHU)/CE/2022-23/3181CivilCannon Manning cum Cannon Fenske Viscometer02.02.202323.02.2023Download BOQ
IIT (BHU)/CIVIL/FY/2022-23/QTN/3180CivilData Acquisition System (DAQ) with accessories02.02.202323-02-2023Download BOQ
IIT (BHU)/CIVIL/FY/2022-23/MKP/SeedGrant/3168Civil4K DSLR Camera for 3D DIC measurement system01.02.202321-02-2023Download BOQ
IIT(BHU)/EC/SB/Project/2022-23/1584ElectronicsSupply, Installation and Commissioning of ANECHOIC CHAMBER27.01.202315.02.2023Download BOQ
IIT(BHU)/Che/2022-23/UG/147ChemicalHigh Speed Camera24.01.202313/02/2023(04:00 PM)Download BOQ
IIT(BHU)/Che/2022-23/UG/139ChemicalOptical Microscope24.01.202313/02/2023 (04:00PM)Download BOQ
IIT(BHU)/PH/SR/2022-23/STARS/01PharmaceuticalAdvanced Multimode Microplate Reader24.01.202313-02-2023Download BOQ
IIT(BHU)/IP Cell/Tender/641Institute Network Infrastructure CommitteeExtension of the Existing Network of the
Institute System
20.01.202311.02.2023 Download BOQ
IIT (BHU)/CIF/2022-23/TMPST/64Central Instrument FacilityThermal-Mechanical Physical Simulator and Testing Equipment19.01.202320/02/2023 (03.00 PM)Download BOQ
IIT(BHU)/CHE/2023-24/DB/149Chemical Engg. & Tech.Optical bench with vibration isolation19.01.202322/02/2023(03:00PM)Download BOQCorrigendum  Dated  16.02.2023
IIT(BHU)/Che/22-23/RKU/003Chemical Engg. & Tech.Fabrication Of Multipass Natural Gas Based Membrane Reformer17.01.202307/02/2023 (03:00 PM)Download BOQ
IIT(BHU)/ECE/Project/SJ/2022-23/1553ElectronicsSupply, Installation and Commissioning of Table-Top Automatic Ultrasonic Spray Pyrolysis Coating Unit with Heating Plate16.01.202304/02/2023Download BOQ
IIT(BHU)/CE/2022- 23/3003CivilAccelerated Polishing Machine16.01.202304/02/2023Download BOQ
: IIT(BHU)/ME/TD/SHD/Seed Grant/22-23/21MechanicalUTM Machine accessories and extensometers & Support 12 Months13.01.2023: 02.02.2023 (03.00 PM)Download BOQ
IIT(BHU)/IWD/CT-44/2022-23/1788IWDProviding and fixing of fly proof stainless steel grade 304 wire gauge for window net of 144 rooms in Morvi Hostel, IIT (BHU)12.01.2023 (3:00 P.M.)02.02.2023 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/CT-43/2022-23/1781IWDGround floor toilet renovation in Deparment of Pharmaceutics Engineering and Technology, IIT(BHU)12.01.2023 (3:00 P.M.)02.02.2023 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/CT-42/2022-23/1790IWDProviding & fixing of flush door and bathroom/toilet fitting  work in  Hostels, IIT(BHU) Varanasi12.01.2023 (3:00 P.M.)02.02.2023 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/CT-41/2022-23/1789IWDProviding and fixing of precoated G.I. profile sheet (Canteen of Limbdi Hostel), P/F of Gate in GSC (Extension) and painting work in Limbdi (29 nos room), Rajputana (10 nos room), Morvi (8 nos room) Hostel, IIT (BHU), Varanasi12.01.2023 (3:00 P.M.)02.02.2023 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/CT-40/2022-23/1787IWDP/F road side sign board both sided front of all shops of Main Workshop (Machine Shop, Forging & Forming Shop, Carpentry & Pattern Making Shop, Foundry Shop, Presicion Engineering Hub, Idea Development Centre, Welding & Fitting Shop, Electroplating Shop,12.01.2023 (3:00 P.M.)02.02.2023 (3:00 P.M.)Download BOQCancellation of Tender
IIT (BHU)/Min/GSPS/R&D/NCL/22-23/01MiningRaising and Maintenance of Experimental Plantation over Selected Overburden Dump Slope area of Khadia Project, NCL12.01.202301.02.2023 (04.00 PM)Download BOQ
IIT(BHU)/SBChE/2022-23/PC/ICMR/22-23/EA01BiochemicalElectrochemical Analyzer with Installation Systems and Accessories05.01.202318/01/2023 (03:00 PM)Download BOQ
IIT(BHU)/WS/2022-23/250Main WorkshopINVESTMENT CASTING SETUP05.01.202325.01.2023Download BOQ
IIT(BHU)/ChE/2022-23/VS/ABSTC/021Chemical Quotation Inquiry for Induction Bar End Heater04.01.202325/01/2023

Annexure(s) I-B

Annexure(s) I-C

IIT(BHU)/ Met-DK/SERB/2022-23/04MetallurgicalVIBRATING SAMPLE MAGNETOMETER04.01.202324/01/2023 (04:00 PM)Download BOQ
IIT(BHU)/IWD/ET-33/2022-23/1707IWDSupply, Installation, Testing, Fixing, and Mounting of LED Flood Light on existing High Mast Lighting Pole in the Gymkhana Ground28.12.202219.01.2023 (5:00 P.M.)Download BOQ,    Cancellation of Tender
IIT (BHU)/IDAPT/2022-23/Bio3DPrinter/059Main WorkshopSupply, installation, demonstration of Bio 3D Printer at IDAPT Hub Foundation30.12.202219.01.2023Download BOQ
IIT (BHU)/IDAPT/2022-23/Ceramic3DPrinter/058Main WorkshopSupply, installation, demonstration of Multifunctional Ceramic 3D Printer at IDAPT Hub Foundation30.12.202219.01.2023Download BOQ
IIT (BHU)/CIVIL/FY/2022-23/MKP/SeedGrant/2835Civil4K DSLR Camera for 3D DIC measurement system28.12.202218-01-2023Download BOQ
IIT(BHU)/Physics/Seed Grant/Furnace/2022-23/QTN/250PhysicsHigh Temperature Muffle Furnace with Rapid Thermal Annealing Process28.12.202217-01-2023Download BOQ
IIT(BHU)/CE/2022-23/2799CivilCannon Manning cum Cannon Fenske Viscometer bath26.12.202214/01/2023Download BOQ
IIT(BHU)/ Met-LM/seed grant/432MetallurgicalLINEAR RECIPROCATING TRIBOMETER23.12.202212/01/2023 (04:00 PM)Download BOQ
Min/CQMURC/2022-23/48MiningHardgrove Grindability Equipment (Tester)23.12.202212.01.2023 at 4 pmDownload BOQCorrigendum  Dated  27.12.2022
IIT(BHU)/ME/TD/APS/SEEDGRANT/22-23/19MechanicalEmission Analyzer22.12.202211.01.2023 (03.00 PM)Download BOQ
IIT(BHU)/ME/TD/SP/OH35/22-23/20MechanicalIBM SPSS Amos Authorized User License + SW Subscription & Support 12 Months- 08 user22.12.202211.01.2023 (03.00 PM)Download BOQ
IIT(BHU)/IWD/ET-32/2022-23/1673IWDElectrical wiring, illumination, power point, light & fan point works in the CV Raman, GSMC Ext, SC Day, Dhanarajgiri, Vishvakarma, S N Bose Hostel, Vishasvaraiya, Aryabhatta-II, GSMC Old IIT Girls, RAJPUTANA and Morvi Hostels22.12.202210.01.2023 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-31/2022-23/1672IWDSupply, Installing, Testing and Commissioning of ‘Silent Type 125 KVA Diesel Generator in the Dhanrajgiri Hostel-222.12.202210.01.2023 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-27/2022-23/1671IWDElectrical cabling work from New Science DSS to Metallurgical Engg Dept.to provide uninteruppted power supply in the Metallurgical22.12.2022 10.01.2023 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-25/2022-23/1670IWDSupply, Installing, Testing and Commissioning of ‘Silent Type 82.5 KVA Diesel Generator in the Faculty apartment22.12.2022 10.01.2023 (3:00 P.M.)Download BOQ
IIT(BHU)/ME/TD/APS/SERB(SRG)/22-23/01MechanicalCOMBUSTION ANALYSER20.12.2022 31-12-2022 (03.00 PM)Download BOQ
IIT (BHU)/Che/22-23/RKU/003ChemicalFabrication of multipass natural gas based membrane reformer13.12.2022 02.01.2023 15.00 HrsDownload BOQ
IIT (BHU)/EE/ SERBPROJECT/22- 23/02ElectricalDesign and retrofitting of ICE car into hybrid Fuel cell Electric vehicle13.12.2022 02.01.2023, up to 16.00 Hrs.Download BOQCorrigendum  Dated  29.12.2022
IIT (BHU)/MainWorkshop/2022-23/SEM/230Main WorkshopSupply, installation, demonstration of SEM with Nanomanipulator & Lithography System12.12.2022 09.01.2023Download BOQ
IIT(BHU)/IWD/ET-30/2022-23/1479IWDSupply & Laying of Cable to feed power supply from STP DSS(CSS) to the S N Bose and Ramanujam Hostel09.12.2022 29.12.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-29/2022-23/1478IWDElectrical wiring,power point installation works in Lecture Main Hall of LT-3 and Lecture rooms(LT-3.1.A, LT-3.1.B, LT-3.1.C, LT-3.2A, LT-3.2.B <-3.2.C) of LT-309.12.2022 29.12.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-28/2022-23/1477IWDSupply,Installation,Testing and Commisiononing of Cubical outdoor LT Panel and Earthing Works09.12.2022 29.12.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-26/2022-23/1476IWDElectrical Installations, wiring,illumination,power,light & fan point Works in the TEM of NELMIF lab Dept of Metallurgical Engg09.12.2022 29.12.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-24/2022-23/1475IWDLighting, illumination & cabling works in the Lawn Tenis changing & washroom, Basketball-1 , Basketball-2 , Basketball-3 court and Volleyball court-2 of Rajputana ground gymkhana09.12.2022 29.12.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/ PH/DKR/2022-23/19PharmaceuticalCrystallization solubility screening setup09.12.200231.12.2022Download BOQ
IIT (BHU)/EE/SG/MEITY/22-23/08ElectricalRegenerative Dynamic Battery Pack Cycler/Test System/Battery Simulator System07.12.200228/12/2022(04:00 PM)Download BOQ
IIT (BHU)/Min/GSPS/R&D/CMPDI/22-23/05MiningSupply, Installation and Commissioning of Strata Control Instruments in Underground Coal mines07.12.200227.12.2022 (04.00 PM)Download BOQ
IIT (BHU)/Min/GSPS/R&D/NCL/21-22/06MiningRaising and Maintenance of Experimental Plantation over Selected Overburden Dump Slope area of Khadia Project, NCL07.12.200227.12.2022 (04.00 PM)Download BOQ
IIT(BHU)/IWD/CT-39/2022-23/1460IWDProviding and fixing of fly proof stainless steel grade 304 wire gauge for window net of 144 rooms in Morvi Hostel06.12.200226.12.2022 (3:00 P.M.)Download BOQCorrigendum  Dated  10.01.2023
IIT(BHU)/IWD/CT-38/2022-23/1459IWDGround floor toilet renovation in Department of Pharmaceutics Engineering and Technology06.12.200226.12.2022 (3:00 P.M.)Download BOQCorrigendum  Dated  10.01.2023
IIT(BHU)/IWD/CT-37/2022-23/1461IWDProviding & fixing of flush door and bathroom/toilet fitting  work in  Hostels06.12.200226.12.2022 (3:00 P.M.)Download BOQCorrigendum  Dated  10.01.2023
IIT(BHU)/SBChE/2022-23/PC/ICMR/22-23/EA01BiochemicalElectrochemical Analyzer with Installation Systems and Accessories01.12.200222/12/2022 (03:00PM)Download BOQ
IIT (BHU)/Min/CQMURC/2022-23/46MiningCoal Pulverizer01.12.202221.12.2022 (03:00 PM)Download BOQ
IIT (BHU)/SMST/2022-23/IKS/05SMSTMetallographic cutting machine Unit29.11.202219.12.2022Download BOQ
IIT(BHU)/ Met-DK/SERB/2022-23/04MetallurgicalVIBRATING SAMPLE MAGNETOMETER28.11.202217/12/2022 (04:00 PM)Download BOQ
IIT(BHU)/APD/2022-23/H.3D.S./01APDHandheld 3D SCANNERS25.11.202215.12.2022Download BOQ
IIT(BHU)/Che/2022-23/AG/103ChemicalPotentiostat with Electrochemical Impedance Spectroscopy (EIS)24.11.202222.11.2022Download BOQ
IIT(BHU)/Physics/Seed Grant/Furnace/2022-23/QTN/ 202PhysicsHigh Temperature Muffle Furnace with Rapid Thermal Annealing Process24.11.202214-12-2022Download BOQCorrigendum  Dated  22.12.2022 
IIT(BHU)/APD/2022-23/ XRL/HoloLens/1.1APDMixed Reality Device - Microsoft HoloLens 223.11.202213.12.2022Download BOQ
IIT(BHU)/Min/AJ/SERB/39MiningSupply, Installation and Commissioning of Instruments for strata control instrumentation in underground coal mines23.11.202213.12.2022 (04.00 PM)Download BOQ
IIT(BHU)/CE/2022-23/ DL/01CivilUnmanned Aerial Vehicle (UAV) with sensors for mapping17.11.202205.12.2022Download BOQ
IIT (BHU)/CIVIL/FY/2022-23/QTN/2363CivilData Acquisition System (DAQ)16.11.202209.12.2022 (03:00 PM)Download BOQ
IIT(BHU)/ Met-PS/seed grant/368MetallurgicalCryogenic Chamber For Universal Testing Machine16.11.202206.12.2022 (04:00 PM)Download BOQ
IIT(BHU)/ PH/DKR/2022-23/12PharmaceuticalCrystallization solubility screening setup14.11.202202.12.2022Download BOQ
IIT(BHU)/MET-SHN/Seed grant/2022-2023/476MetallurgicalULTRA-HIGH VACUUM HEAT TREATMENT FURNACE14.11.202202.12.2022 (3.00 PM)Download BOQ
IIT(BHU)/SBChE/CO2 Incubator/SKS/SEED/22-23/ 115BiochemicalCO2 Incubator with FDA-listed class II system11.11.202201/12/22 (03:00 PM)Download BOQ
IIT(BHU)/WS/2022-23/221Main WorkshopINVESTMENT CASTING SETUP10.11.202201.12.2022Download BOQ
IIT(BHU)/ME/TD/SP/OH35/22-23/18MechanicalIBM SPSS Amos Authorized User License + SW Subscription & Support09.11.202224.11.2022 (03.00 PM)Download BOQ
IIT(BHU)/ADMIN/2022-23/03Registrar OfficeCleaning, Sanitation and Disposal of Solid Waste09.11.202229.11.2022 (17:00 Hrs)Download BOQ
IIT(BHU)/SERB/EE/KC/22-23/01ElectricalTo Design and Retrofitting of ICE Car into Hybrid Fuel Cell Electric Vehicle07.11.202225-11-2022 (04:00 PM) 
IIT(BHU)/Min/CQMURC/2021-22/38MiningThermal Gravimetric Analyzer04.11.202224/11/2022 Download BOQ
IIT(BHU)/R&D/DRDO/SMST/PM/2 022-23/01,SMSTMULTIMODE PLATE READER03.11.202223/11/2022 up to 03:00 PMDownload BOQ
IIT(BHU)/Min/HD/22-23/326MiningSCHMIDT Rebound Hammer (L-Type) for UCS31.10.202219.11.2022 (04.00 PM)Download BOQ
IIT(BHU)/Met-LM/seed grant/432MetallurgicalLINEAR RECIPROCATING TRIBOMETER26.10.202217/11/2022 (04:00 PM)Download BOQ
IIT(BHU)/ECE/Project/2022-23/1308ElectronicsSupply, Installation and Commissioning of LPWAN Module with Multi Hopping Features22.10.202211/11/2022Download BOQ
IIT(BHU)/Min/AJ/SERB/33MiningSupply, Installation and Commissioning of Instruments for strata control instrumentation in underground coal mines22.10.202211.11.2022 (04.00 PM)Download BOQ
IIT (BHU)/MainWorkshop/2022-23/CARS/215Main WorkshopSupply, installation, demonstration ofCARS Technique using integrated CONFOCAL RAMAN – AFM system21.10.202221.11.2022Download BOQ
IIT(BHU)/APD/2022-23/ XRL/HoloLens/01Architecture, Planning and Design,Mixed Reality Device - Microsoft HoloLens 220.10.202210.11.2022Download BOQ
 IIT(BHU)/Min/AJ/Gorbi/2021-22/276MiningMetal Analyzer with ion meter with different electrodes such as lead, mercury”, etc..20.10.202217.11.2022 (04.00 PM)Download BOQCorrigendum  Dated  03.11.2022
 IIT(BHU)/Min/AJ/Air/2021-22/361MiningPortable Laser Aerosol Spectrometer (PM2.5)18.10.202216.11.2022 (04.00 PM)Download BOQCorrigendum  Dated  03.11.2022
IIT(BHU)/Min/AJ/SERB/32MiningDevelopment of Early Warning Systems (Two types)17.10.202207.11.2022 (04.00 PM)Download BOQ
IIT(BHU)/SMST/2022-23/Q.Enq/11SMSTMonochromator (An accessories of optoelectronics measurement set-up)17.10.202203.11.2022 by 03:00PM 
IIT(BHU)/PHY/FY/2022-23/QTN/01Physics96Zr enriched material17.10.202222-10-2022Download BOQ
 IIT(BHU)/Min/AJ/Gorbi/2021-22/039MiningHandheld XRF Analyzer14.10.202214.11.2022 (04.00) PMDownload BOQ, Corrigendum  Dated  03.11.2022
IIT(BHU)/ME/TD/SP/OH35/22-23/17MechanicalIBM SPSS Amos Authorized User License + SW Subscription & Support 12 Months13.10.202203.11.2022Download BOQ
 IIT(BHU)/Admin/2022-23/02Establishment SectionSupply of Manpower07.10.2022 (16:00 Hrs) 29.10.2022 (17:00 Hrs)Download BOQ
IIT(BHU)/CE/2022-23/1798CIvilCannon Manning cum Cannon Fenske Viscometer bath23.09.2022 25.10.2022 Download BOQ
IIT(BHU)/CE/2022- 23/1799CIvilCore Drilling Machin23.09.2022 25.10.2022 Download BOQ
IIT(BHU)/BME/2022-23/TM/01School of Biomedical EnggTurbo-molecular (TM) high vacuum pump for plasma system:23.09.2022 25.10.2022 (03.00PM)Download BOQ
IIT(BHU)/SMST/2022-23/Q.Enq/10SMSTSpin Coater03.10.202224.10.2022 (3:00 P.M.) 
IIT(BHU)/IWD/ET-14/2022-23/886IWDDistribution of power supply from feeder pilar to NELMIF & other Lab through underground Electrical cabling work in the Metallurgical Engineering13.09.2022 (3:00 P.M.)04.10.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-13/2022-23/885IWDSupply,Installation,Testing and Commisiononing of Cubical outdoor LT Panel and Earthing Works in the Metallurgical Engineering Department13.09.2022 (3:00 P.M.)04.10.2022 (3:00 P.M.)Download BOQ
 IIT(BHU)/IWD/ET-11/2022-23/871IWDSupply, Installing, Testing and Commissioning of ‘Silent Type 82.5 KVA Diesel Generator in the Faculty apartment.13.09.2022 (3:00 P.M.) 04.10.2022 (3:00 P.M.)Download BOQCorrigendum  Dated  17.11.2022
IIT(BHU)/IWD/ET-10/2022-23/870IWDLighting, illumination & cabling works in the Lawn Tenis changing & washroom, Basketball-1 , Basketball-2 , Basketball-3 court and Volleyball court-2 of Rajputana ground gymkhana13.09.2022 (3:00 P.M.) 04.10.2022 (3:00 P.M.)Download BOQ Corrigendum  Dated  17.11.2022
IIT(BHU)/ADMIN/2022-23/1Establishment SectionSupply of Security Personnel30.09.202201.11.2022 (15:00 Hrs.)Download BOQ, Corrigendum  Dated  17.10.2022
 IIT(BHU)/Physics/RKS/22- 23/88PhysicsHe Ne Polarized Laser30.09.202220.10.2022 , up to 04.00 PMDownload BOQ
IIT(BHU)/IWD/CT-36/2022-23/1033IWDProviding and fixing of fly proof stainless steel grade 304 wire gauge for window net in Vivekanand Hostel30.09.202218.10.2022 (3:00 P.M.Download BOQ
 IIT(BHU)/IWD/CT-35/2022-23/1032IWDProviding and fixing of fly proof stainless steel grade 304 wire gauge for window net of 144 rooms in Morvi Hostel30.09.2022 18.10.2022 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/Min/CQMURC/2021-22/31MiningThermal Gravimetric Analyzer28.09.202217.10.2022 (04.00 PM)Download BOQ
IIT(BHU/PH/DKR/2022-23/09PharmaceuticalDouble Jacketed Reactor with Cooling/Heating Facility26.09.2022 12.10.2022Download BOQ
IIT(BHU/Met-PS/seed grant/368MetallurgicalCRYOGENIC CHAMBER FOR UNIVERSAL TESTING MACHINE26.09.2022 26.10.2022 (4:00 P.M.)Download BOQ
IIT(BHU/ECE/Project/2022-23/1231ElectronicsSupply, Installation and Commissioning of LPWAN Module with Multi Hopping Features23.09.2022 05.10.2022 (3:00 P.M.)Download BOQ
 IIT(BHU/IWD/CT-34/2022-23/928IWDP/L Vitrified tiles flooring work of corridor, room (F-03 & F-04) at first floor and Portico (main Entrance) in School of Material Science & Technology22.09.202205.10.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/R&D/DRDO/SMST/PM/2 022-23/01SMSTMULTIMODE PLATE READER 22.09.2022 12/10/2022 up to 04:00 PMDownload BOQ
IIT(BHU/IWD/ET-23/2022-23/959IWDElectrical wiring,power point installation works in Lecture Main Hall of LT-3 and Lecture rooms(LT-3.1.A, LT-3.1.B, LT-3.1.C, LT-3.2A, LT-3.2.B <-3.2.C) of LT-321.09.202211.10.2022 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU/IWD/ET-21/2022-23/951IWDSupply & Laying of Cable to feed power supply from STP DSS(CSS) to the S N Bose Hostel21.09.202211.10.2022 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU/IWD/ET-22/2022-23/952 IWDSupply & Laying of Cable to feed power supply from STP DSS(CSS) to the Ramanujam Hostel21.09.202207.10.2022 (3:00 P.M.)Download BOQCancellation of Tender
 IIT(BHU/IWD/ET-20/2022-23/950 IWDElectrical wiring,illumination,power point,light & fan point works in the GSMC Ext Hostel Vishwakarma Hostel, S N Bose Hostel,Vishasvaraiya hostel ,AryabhattaII Hostel and GSMC Old Girls Hostel21.09.202207.10.2022 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU/IWD/ET-19/2022-23/949 IWDElectrical wiring,illumination,power point,light & fan point works in Morvi Hostel21.09.202207.10.2022 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU/IWD/ET-18/2022-23/948 IWDElectrical wiring,illumination,power point,light & fan point works in S.C. Dey Girls Hostel21.09.202211.10.2022 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU/IWD/ET-17/2022-23/947 IWDElectrical cabling work from New Science DSS to Metallurgical Engg Dept.to provide uninteruppted power supply in the Metallurgical Engineering21.09.202207.10.2022 (3:00 P.M.)Download BOQCancellation of Tender
 IIT(BHU)/IWD/ET-16/2022-23/946IWDElectrical wiring,illumination,power point,light & fan point works in Dhanrajgiri Hostel21.09.202207.10.2022 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/ET-15/2022-23/945IWDElectrical wiring,illumination,power point,light & fan point works in C V Raman Hostel,IIT(G+6) Girls Hostels & Rajputana Hostel21.09.202207.10.2022 (3:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)//IWD/CT-33/2022-23/944IWDProviding & fixing of false ceiling, aluminium partition, tile flooring and painting, wooden rack of PG Pharmacognosy lab at first floor in Department of Pharmaceutical Engineering, IIT(BHU)20.09.2022 10.10.2022 (5:00 P.M.)Download BOQ
IIT(BHU)//IWD/CT-32/2022-23/943IWDGround floor toilet renovation in Deparment of Pharmaceutics Engineering and Technology, IIT(BHU)20.09.2022 10.10.2022 (5:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)//IWD/CT-31/2022-23/942IWDConstruction of Security guardroom with aluminium partition and profile sheet at the IIT girls Hostel (G+6), IIT (BHU) Varanasi20.09.2022 10.10.2022 (5:00 P.M.)Download BOQ
IIT(BHU)/IPCell/e-Auction/2022-23/343IPCellAUCTION FOR UNSERVICEABLE STORES/GOODS LYING at Dump-Yard and various19.09.2022 22.09.2022 (05.00 PM)Download BOQCorrigendum, Dated: 23.09.2022
IIT(BHU)/IWD/ET-14/2022-23/886IWDDistribution of power supply from feeder pilar to NELMIF & other Lab through underground Electrical cabling work in the Metallurgical Engineering16.09.202230.09.2022 (5:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/ET-13/2022-23/885IWDSupply,Installation,Testing and Commisiononing of Cubical outdoor LT Panel and Earthing Works in the Metallurgical Engineering Department16.09.202230.09.2022 (5:00 P.M.)Download BOQCancellation of Tender
IIT(BHU)/IWD/ET-12/2022-23/884IWDElectrical Installations, wiring,illumination,power,light & fan point Works in the TEM of NELMIF lab Dept of Metallurgical Engg16.09.202230.09.2022 (5:00 P.M.)Download BOQCancellation of Tender
 IIT(BHU)/IWD/ET-09/2022-23/883IWDSupply, Installation, Testing, Fixing, and Mounting of LED Flood Light on existing High Mast Lighting Pole in the Gymkhana Ground16.09.202230.09.2022 (5:00 P.M.)Download BOQ
IIT(BHU)/Min/AJ/SERB/27MIningDevelopment of Early Warning Systems (Two types)16.09.202206.10.2022 (04.00 PMDownload BOQ
IIT(BHU)/ACD/Convocation/Purchase/2022-23/QTN/4257Academic AffairsQuotation for Illumination of Buildings for 11th Convocation14.09.202228.09.02022 till 17:00 hrs. 
IIT(BHU)/Min/HD/22-23/268MiningSCHMIDT Rebound Hammer (L-Type) for UCS13.09.202203.10.2022 (04.00 PM)Download BOQ
IIT(BHU)/CHE/2022-23/TD/79ChemicalImpedance Tube Apparatus12.09.202230/09/2022 (03:00PM)Download BOQ
IIT(BHU)/CHE/2022-23/TD/76ChemicalSpectroscopic Reflectometer (Film Thickness measurement12.09.202230/09/2022 (03:00PM)Download BOQ
IIT(BHU))/MainWorkshop/2022-23/CARS/176Main WorkshopSupply, installation, demonstration of CARS Technique using integrated CONFOCAL RAMAN – AFM system09.09.202210.10.2022 Download BOQ
IIT(BHU)/IWD/CT-30/2022-23/866IWDProviding & fixing of false ceiling, aluminium partition, tile flooring and painting works of Electron Microscopy facility07.09.202228.09.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IPCell/Water Cooler/2022-23/317Institute Purchase CellRATE FOR CAMC, SPARE PARTS OF ALL TYPES OF ONLINE UPS06.09.202227.09.2022 (05.00 PM)Download BOQ
IIT(BHU)/IPCell/Water Cooler/2022-23/316Institute Purchase CellRATE FOR CAMC, SPARE PARTS OF ALL TYPES OF WATER COOLER WITH PURIFIERS06.09.202227.09.2022 (05.00 PM)Download BOQ
IIT(BHU)/IPCell/Water Cooler/2022-23/315Institute Purchase CellRATE FOR CAMC, SPARE PARTS OF ALL TYPES OF AIR CONDITIONER05.09.202227.09.2022 (05.00 PM)Download BOQ
IIT(BHU)/Met-HD/2022-23/320MetallurgicalPortable Ultrasonic Flaw Detector06.09.202227/09/2022 (04.00 PM)Download BOQ
IIT(BHU)/Min/AJ/Gorbi/2021-22/260MiningHandheld XRF Analyzer05.09.202224.09.2022Download BOQ
IIT(BHU)/Min/GSPS/R&D/CMPDI/22-23/04MiningSupply, Installation and Commissioning of Instruments for strata control instrumentation in underground coal mines04.09.202224.09.2022 (04.00 PM)Download BOQ
IIT(BHU)/ACD/2022-23/4242Academic AffairsSupply and Catering Services for 11th Convocation Lunch on 10th October, 2022 at Swatantrata Bhawan04.09.202224.09.2022Download BOQ
 IIT(BHU)/SMST/2022-23/Q.Enq/09SMSTMicrofluidic injection system04.09.202223.09.2022 by 03:00PM. 
IIT(BHU)/Min/HD/22-23/248MiningGround Vibration Monitoring Seismograph04.09.202222.09.2022 (04.00 PM)Download BOQ
IIT(BHU)/SMST/2022-23/Q.Enq/08SMSTFilm Coating Unit02.09.202221.09.2022 by 03:00PM. 
 IIT(BHU)/SMST/2022-23/Q.Enq/07SMSTFurnace02.09.202221.09.2022 by 03:00PM. 
IIT(BHU)/Main Workshop/2022-23/SEM/172Main WorkshopSupply, installation, demonstration of SEM with Nanomanipulator & Lithography System02.09.202221.09.2022Download BOQ
IIT(BHU)/CoW/22-23/QTN/6CoWQuotation for bedding for 11th convocation01.09.202216.09.2022 till 05:00 PM 
IIT(BHU)/Min/AJ/Air/2021-22/339MIningOnline respirable dust sampler01.09.202221.09.2022Download BOQ
IIT(BHU)/CE/2022-23/1508CivilDifferential Global Positioning System (DGPS) 01.09.202219-09-2022Download BOQ
IIT(BHU)/CIVIL/FY/2022-23/QTN/1510CivilData Acquisition System (DAQ)30.08.202219-09-2022Download BOQ
 IIT(BHU)/WS/2022-23/167Main WorkshopINVESTMENT CASTING SETUP29.08.202216.09.2022Download BOQ
 IIT(BHU)/ME/TD/20 22-23/PE/JPM/15MechanicalElectrochemical Machining System24.08.202213.09.2022Download BOQ
IIT(BHU)/PROJECT/CPRI/ EE/07/339/22-23/ 02ElectricalRelay with PMU functionality23.08.202207.09.2022Download BOQ
IIT(BHU)/APD/2022-23/H.3D.S./01Architecture, Planning and DesignDJI Drone (DJI Mavic 3 Combo)18.08.202207.09.2022Download BOQ
 IIT(BHU)/APD/2022-23/H.3D.S./01Architecture, Planning and DesignHandheld 3D SCANNERS18.08.202207.09.2022Download BOQ
 IIT(BHU)//IWD/ET-08/2022-23/680IWDSupply, Installing, Testing and Commissioning of ‘Silent Type 125 KVA Diesel Generator in the Dhanrajgiri Hostel-218.08.202226.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/ACD/Convocation/Purchase/2022-23/QTN/4206Academic AffairsQuotation for Minting of Medals for 11th Convocation17.08.2022 31.08.2022 till 17:00 hrs. 
IIT(BHU)/ACD/Convocation/Purchase/2022-23/QTN/4205Academic AffairsQuotation for Khadi made Bhagalpuri Silk/Matka Silk Sadri17.08.2022 08.09.2022 till 17:00 hrs.Download BOQ
IIT(BHU)/(SERB)/EE/21-22/09/348ElectricalReal Time Hardware in Loop Emulator12.08.202202.09.2022 (03:00 PM)Download BOQ
IIT(BHU)/ME/TD/20 22-23/PE/JPM/14MechanicalUltrasonic Welding Machine10.08.202229.08.2022 (03.00 pm)Download BOQ
IIT(BHU)/ME/TD/20 22-23/PE/JPM/13MechanicalClinching Machine10.08.202229.08.2022 (03.00 pm)Download BOQ
IIT(BHU)/SMST/2022-23/Q.Enq/06SMSTLow Speed Diamond Saw08.08.202226.08.2022 by 03:00 PM. 
IIT(BHU)/SMST/2022-23/Q.Enq/05SMSTMicroscope08.08.202226.08.2022 by 03:00 PM. 
IIT(BHU)/IWD/CT-28/2022-23/564IWDP/L Vitrified tiles flooring work of corridor, room (F-03 & F-04) at first floor and Portico (main Entrance)05.08.202225.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/SBChE/Fluorometer/2022-23/T01/68BiochemicalFLUOROMETER05.08.202225/08/2022 (03:00 PM)Download BOQ
IIT(BHU)/SBChE/ATR-FTIR/2022-23/T01/67BiochemicalATR – FTIR05.08.202225/08/2022 (03:00 PM)Download BOQ
IIT(BHU)/PHY/FY/2022-23/QTN/129PhysicsGenset 62.5 KVA 3 Phase Silent04.08.202224-08-2022Download BOQ
IIT(BHU)/Met-HD/2022-23/213MetallurgicalPortable Ultrasonic Flaw Detector03.08.202222.08.2022 (04.00 PM)Download BOQ 
IIT(BHU)/Min/AJ/Air/2021-22/326MiningImage Analysis Software with Petrological Microscope02.08.202222.08.2022 (04.00 PM)

Download BOQ

Corrigendum, Dated: 08.08.2022

IIT(BHU)/Physics/RKS/21-22/81PhysicsHe Ne Polarized Laser & CCD Camera02.08.202222.08.2022Download BOQ
 IIT(BHU)/Min/GSPS/R&D/CMPDI/22-23/03MiningSupply, Installation and Commissioning of Instruments for strata control instrumentation in underground coal mines02.08.202222.08.2022 (04.00 PM)Download BOQ
IIT(BHU)/Met-HD/2022-23/212MetallurgicalHigh temperature tube furnace, with vacuum (1350 °C)01.08.202219/08/2022 (04.00 PM)Download BOQ
IIT(BHU)/ME/TD/JS/OH35/2022-23/11MechanicalCone/Plate Rheometer (with required software to draw stress-strain curve), Accuracy=1% of range01.08.202216.08.2022 (03.00 PM)Download BOQ
IIT(BHU/ChE/22-23/VS/08ChemicalQuotation Inquiry for Refiling of gas cylinders01.08.202219/08/2022

Annexure(s) I-B

Annexure(s) I-C

IIT(BHU))/CHE/2022-23/TD/57ChemicalSpectroscopic Reflectometer (Film Thickness measurement)30.07.202218.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-07/2022-23/615IWDSupply & Laying of LT Cable from Vivekanand New DSS (CSS) to the GSMC Feeder Pillar30.07.202218.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-06/2022-23/614IWDElectrical Installations & Wiring Works in the Electrical Machine & Drive Lab of the Electrical Engineering Department30.07.202218.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-05/2022-23/613IWDElectrical,installation,wiring,illumination,power point,light & fan point works in the M.Tech Classroom & Lab and Chamber of Dr. Preetam Singh in Department of Ceramic Engineering30.07.202218.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-04/2022-23/612IWDSupply, installation , testing and commissioning of Battery Bank and Battery Charging Panel in the Food Science DSS30.07.2022 18.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-27/2022-23/604IWDProviding & fixing of flush door and bathroom/toilet fitting work in Hostels28.07.202215.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-26/2022-23/603IWDRenovation of Warden Quarter no. 2 Rajputana Hostel28.07.202215.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-25/2022-23/602IWDRenovation of the Warden Quarter Old G-17, Hyderabad Colony, (allotted to Dr. Gauhar Abbas)28.07.202215.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-24/2022-23/601IWDProviding & fixing false ceiling, tile flooring and painting work of Power System lab, in Department of Electrical Engineering28.07.202215.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-22/2022-23/600IWDConstruction of chain link fencing of back side lawn and right side building in School of Material Science & Technology28.07.202215.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-23/2022-23/594IWDPlaster Repair and Exterior painting work of Chemistry Department27.07.202212.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-21/2022-23/599IWDProviding & fixing of false ceiling, aluminium partition, tile flooring and painting, wooden rack of PG Pharmacognosy lab at first floor in Department of Pharmaceutical Engineering27.07.202212.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-20/2022-23/598IWDGround floor toilet renovation in Deparment of Pharmaceutics Engineering and Technology27.07.202212.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-19/2022-23/597IWDConstruction of toilet 4 nos and bathroom 5 nos for mess staff in A.S.N. Bose Hostel27.07.202212.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-18/2022-23/593IWDPlaster Repair and Exterior painting work of Electrical Engineering Department27.07.202212.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-13/2022-23/592IWDRenovation works in the M.Tech Classroom, M.Tech Lab and Chamber of Dr. Preetam Singh27.07.202212.08.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/(SERB)/EE/21-22/09/348ElectricalReal Time Hardware in Loop Emulator25.07.202218.08.2022 (04:00 PM) 
IIT(BHU)/CHE/2022-23/TD/50ChemicalHigh Pressure Liquid Chromatography Pump21.07.202210/08/2022(03:00PM)Download BOQ
IIT(BHU)/SMST/2022-23/Q.Enq./04SMSTLoadlock vacuum chamber19.07.202208.08.2022 by 03:00 PM. 
IIT(BHU)/SMST/2022-23/Q.Enq./03SMSTPhotocatalytic Reactor18.07.202205.08.2022 by 03:00 PM 
 IIT(BHU)/SMST/2022-23/Q.Enq./02SMSTWater Parameter Analyzer18.07.202205.08.2022 by 03:00 PM 
IIT(BHU)/SMST/2022-23/Q.Enq./01SMSTAccessories for Electrochemical System18.07.202205.08.2022 by 03:00 PM. 
IIT(BHU)/CE/2022-23/981CivilQuotation inquiry for Tail Pipe Particulate Matter and Multi-Gas Sampler18.07.202205-08-2022 (4 PM)Download BOQ
IIT(BHU)/ACD/2022-23/Annual Report (2021-22)/Quotation/4126Academic AffairsQuotation for printing of Annual Report 2021-2213.07.202228.07.2022 till 17:00 hrs. in the office of the Dean (Academic Affairs) 
IIT(BHU)/Min/AJ/Air/2021-22/316MiningPortable Laser Aerosol Spectrometer (PM2.5)12.07.202201.08.2022 (04.00 PM)Download BOQ
IIT(BHU)/Min/AJ/Air/2021-22/315MiningOnline respirable dust sampler12.07.202201.08.2022 (04.00 PM)Download BOQ, Corrigendum, Dated: 20.07.2022
 IIT(BHU)/Met-JB/DST-FIST/2021-22/02MetallurgicalAnalytical Transmission Electron Microscope Part B: Ion Beam Milling System Part C: Dimple grinder with microscope08.07.202228/07/2022 (04.00 PM)Download BOQ
IIT(BHU)/PHY/SU/2022-23/QTN/02PhysicsComputerized Horizontal Dilatometer08.07.202227.07.2022Download BOQ
IIT(BHU)/CHY/2022-23/TGA/02ChemistryThermogravimetric Analyzer (TGA)07.07.202227.07.2022Download BOQCorrigendum, Dated: 20.07.2022
IIT(BHU)/IWD/ET-03/2022-23/417IWDSupply & Laying of Cable to feed power supply from STP DSS to the Aryabhattya Hostel AB & CD IIT(BHU)05.07.202225.07.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-14/2022-23/419IWDProviding & fixing of door and windows, repair of plaster in rooms and lobby area and painting work in S. C. De Hostel05.07.2022 26.07.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-15/2022-23/420IWDProviding & fixing of false ceiling, tile flooring and painting work in lab (Adwansh Control & Network System) in Department of Electrical Engineering, IIT(BHU)05.07.2022 26.07.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-17/2022-23/418IWDRenovation of 10 nos of bathroom including tiles and fittings and rooms including door, glass and wardrobes etc. in Guest House, IIT(BHU)05.07.202226.07.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/ACD/MIS/2022-23Office of the Dean of Student AffairsMedical Insurance Scheme for IIT(BHU), Varanasi Students06.07.202226.07.2022 (4:00 P.M.)

Download BOQ

Addendum , Dated: 15.07.2022

IIT(BHU)/IWD/ET-03/2022-23/417IWDSupply & Laying of Cable to feed power supply from STP DSS to the Aryabhattya Hostel AB & CD01.07.202225.07.2022 (5:00 P.M.)Download BOQ
IIT(BHU)/PHE/RK/2022-23/O/13PharmaceuticalANALYTICAL HIGH-PERFORMANCE LIQUID CHROMATOGRAPHY (ANALYTICAL HPLC)01.07.202221.07.2022Download BOQ
IIT(BHU)/Min/GSPS/R&D/CMPDI/22-23/02MiningSupply, Installation and Commissioning of Instruments for strata control instrumentation in underground coal mines30.06.202220.07.2022 (04.00 PM)Download BOQ
IIT(BHU)/MainWorkshop/2022-23/Confocal/062Main WorkshopSupply, installation, demonstration of CARS Technique using integrated CONFOCAL RAMAN – AFM system28.06.202218.07.2022

Download BOQ

Corrigendum, Dated: 12.07.2022

IIT(BHU)R&D/ Varanasi (SERB)/EE/21-22/09/348ElectricalTyphoon HIL real time Hardware in the Loop Simulators28.06.202218.07.2022 (04:00 PM)Download BOQ
IIT(BHU)/ME/TD/2022 -23/PE/JPM/08MechanicalUltrasonic Welding Machine27.06.202215.07.2022 (03.00 pm)Download BOQ
IIT(BHU)/ME/TD/2022 -23/PE/JPM/07MechanicalClinching Machine27.06.202215.07.2022 (03.00 pm)Download BOQ
IIT(BHU)/ECE/2022-23/978ElectronicsTable-Top Automatic Ultrasonic Spray Pyrolysis Coating Unit with Heating Plate27.06.202215.07.2022Download BOQ
IIT(BHU)/IWD/CT-11/2022-23/350IWDProviding and laying PVC pipe for storm water drain in Vivekanand Hostel24.06.202214.07.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-16/2022-23/349IWDRepair, scraping and exterior painting work of Gymkhana24.06.202214.07.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-12/2022-23/348IWDConstruction of Security guardroom with aluminium partition and profile sheet at the IIT girls Hostel24.06.202214.07.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/CHY/2021-22/Rosy/Glove Box/02ChemistryGLOVE BOX for the Lithium-Ion Battery Application24.06.202214.07.2022 (04.00 PM)Download BOQ
IIT(BHU)/Min/AJ/Air/2021-22/296MiningImage Analysis Software with Petrological Microscope23.06.202213.07.2022Download BOQ
 IIT(BHU)/HTL/CoW/ 2022-23/09Council of WardensAMC of Water Cooler Cum Purifiers-120PSS of Aqua guard, aqua guard AG200 and other company with compressor22.06.202212.07.2022 15.00 HrsDownload BOQ
IIT(BHU)/PROJECT/CPRI/ EE/07/339/22-23/ 024ElectricalRelay with PMU functionality22.06.202212.07.2022, up to 16.00 Hrs.Download BOQ
IIT(BHU)/I.P.Cell/A.R.C./2022 – 23/154Institute Purchase CellLaboratory Chemicals, Glasswares & Filter Paper21.06.202211th July, 2022 UPTO 15.00 HrsDownload BOQ
IIT(BHU)/IPCell/Vehicle/2022-23/153Institute Purchase CellInvitation notice for empanelment and rate contract for hiring vehicles on monthly and as on required basis21.06.202211th July, 2022 UPTO 15.00 Hrs 
IIT(BHU)/PROJECT/CPRI/ EE/07/339/22-23/ 01ElectricalVoltage and Current amplifier with accessories for integration with RTDS and relays.20.06.202207.07.2022Download BOQ
IIT(BHU)/WS/2022-23/040Main WorkshopINVESTMENT CASTING SETUP16.06.202207.07.2022Download BOQ
Corrigendum, Dated: 16.06.2022
IIT(BHU/ChE/22-23/VS/02Chemical Quotation Inquiry for Cold Flow Fluidised Bed Reactor15.06.202206/07/2022

Annexure(s) I-B

Annexure(s) I-C

IIT(BHU/IWD/CT-10/2022-23/284IWDRenovation of Warden Quarter no. 2 Rajputana Hostel13.06.202230.06.2022 (3:00 P.M.)Download BOQ
IIT(BHU/IWD/CT-09/2022-23/287IWDRenovation of the Warden Quarter Old G-17, Hyderabad Colony, (allotted to Dr. Gauhar Abbas)13.06.202230.06.2022 (3:00 P.M.)Download BOQ
IIT(BHU/IWD/CT-08/2022-23/283IWDRenovation of one no of toilet block in Limbdi Hostel13.06.202230.06.2022 (3:00 P.M.)Download BOQ
IIT(BHU/IWD/CT-07/2022-23/285IWDRepair, scraping and painting works of common area, passage and Exterior of Rajputana Hostel13.06.202230.06.2022 (3:00 P.M.)Download BOQ
IIT(BHU/IWD/CT-06/2022-23/282IWDProviding & fixing false ceiling, tile flooring and painting work of Power System lab.13.06.202230.06.2022 (3:00 P.M.)Download BOQ
IIT(BHU/IWD/CT-05/2022-23/286IWDConstruction of R.C.C. platform, P/F of tiles, aluminium shutter and paintingwork in lab of Dr. Rajesh kumar Upadhyay.13.06.202230.06.2022 (3:00 P.M.)Download BOQ
IIT(BHU/IWD/ET-01/2022-23/289IWDElectrical wiring,power point Installation & Illumination works in the Industrial Metallurgu Division (IMD) Hall of Metallurgical13.06.202230.06.2022 (3:00 P.M.)Download BOQ
IIT(BHU/IWD/ET-02/2022-23/288IWDElectrical wiring, power point Installation & Illumination works in the old Committee room and allied room of control system lab13.06.202230.06.2022 (3:00 P.M.)Download BOQ
IIT(BHU/ME/TD/20 22-23/PE/RT/05MechanicalComputerized Ultrasonic Welding Machine for Metals09.06.202230.06.2022 (03.00 pm)Download BOQ
IIT(BHU/ME/TD/20 22-23/PE/RT/04MechanicalRobotic MIG09.06.202230.06.2022 (03.00 pm)Download BOQ
IIT(BHU/Min/AJ/Gorbi/2021-22/240MiningHandheld XRF Analyzer08.06.202229.06.2022 (3.00 PM)Download BOQ
IIT(BHU/PHY/SU/2022-23/QTN/01PhysicsComputerized Horizontal Dilatometer08.06.202229-06-2022.Download BOQ
IIT(BHU/Physics/PS/NRB/2022-23/QTN/01PhysicsModular Electrochemical Workstation (Potentiostat/Galvanostat along with EIS and spares thereof)08.06.2022 30-06-2022.Download BOQ
IIT(BHU/PHY/FY/2022-23/QTN/ 63PhysicsGenset 62.5 KVA 3 Phase Silent08.06.202229-06-2022.Download BOQ
IIT(BHU)/ME/TD/20 22-23/PE/JPM/03MechanicalElectrochemical Machining System08.06.2022 28.06.2022.Download BOQ,
IIT(BHU)/ME/MV/PROJ ECT/FLWCS/02MechanicalFiber laser welding/cladding system –One Unit08.06.202228-06-2022, up to 16.00 HrsDownload BOQ,
IIT(BHU)/IWD/CT-04/2022-23/268IWDDemolition of left side wing (G+1) 1 nos of toilet block (G+1) and 1 nos of warden quarter (G+1) of Dhanrajgiri Hostel Building and buyback for serviceable materials07.06.202224.06.2022 (6:00 P.M.)Download BOQ,
IIT(BHU)/EE/2022-23/28ElectricalSwitched Reluctance Motor mechanically coupled to DC Motor and encoder07.06.202227/06/2022(04:00 PM)Download BOQ,
IIT(BHU)/PHE/RK/2022-23/O/09PharmaceuticalAnalytical high-performance liquid chromatography (analytical hplc)02.06.202223-06-2022

Download BOQ,

Corrigendum, Dated: 06.06.2022

IIT(BHU)/PH/FY/2022-23/QTN/M/05PharmaceuticalFuming Hood01.06.202214.06.2022 by 03:00 PM 
IIT(BHU)/PH/FY/2022-23/QTN/M/04PharmaceuticalStability Chamber01.06.202214.06.2022 by 03:00 PM 
IIT(BHU)/PHY/FY/2022-23/QTN/41PhysicsBeta Spectroscopy with Digital Acquisition01.06.202221-06-2022Download BOQ
IIT(BHU)/PHY/FY/2022-23/QTN/40PhysicsBeta Spectroscopy with Deflection of Beta Radiation in a Magnetic Field01.06.202221-06-2022Download BOQ
 IIT(BHU)/Met-JKS/SERB/2022-23/02MetallurgicalHigh temperature furnace 1600℃ (low inert gas flow) with computer interface through rs 232 softwar01.06.202220.06.2022 (04:00 PM)Download BOQ
IIT(BHU)/CHY/2022-23/TGA/01ChemistryThermogravimetric Analyzer (TGA)31.05.202220.06.2022Download BOQ
IIT(BHU)/Met-JB/DST-FIST/2021-22/01MetallurgicalAnalytical Transmission Electron Microscope Part B: Ion Beam Milling System Part C: Dimple grinder with microscope24.05.202213/06/2022 (04.00 PM)Download BOQ
IIT(BHU)/Min/HD/22-23/92MiningGround Vibration Monitoring Seismograph24.05.202213.06.2022 (04.00 PM)Download BOQ
IIT(BHU)/IWD/CT-02/2022-23/216IWDP/F aluminium partition work of production lab at first floor in Department of Mechanical Engineering,20.05.202210.06.2022 (3:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-02/2022-23/215IWDProviding & fixing Aluminium Partition, tiles, false ceiling & painting work in Department of Electrical Engineering.20.05.202210.06.2022 (3:00 P.M.)Download BOQCorrigendum, Dated: 21.10.2022
IIT(BHU)/Min/GSPS/R&D/NCL/21-22/05MiningAutomated Direct Shear Test Apparatus for laboratory test of Shear Strength of Coal Mine Overburden Dump Material20.05.2022 20.06.2022 (04:00 PM)Download BOQ
IIT(BHU)/Met-SP/SERB/2021-22/03MetallurgicalINTELLIGENT MONITOR MIG/MAG WELDING MACHINE (320 AMP)19.05.202208/06/2022 (04.00 PM)Download BOQ
IIT(BHU)/PH/FY/2022-23/QTN/M/02PharmaceuticalCRYOSTAT19.05.202208.06.2022Download BOQ
IIT(BHU)/PH/FY/2022 23/QTN/M/01PharmaceuticalFLOW CYTOMETER19.05.202208.06.2022Download BOQ
IIT(BHU)/ME/SKP/OH-35/FFT/01MechanicalVibration measurement system (data acquisition system with FFT analyzer)17.05.202204.06.2022Download BOQ
IIT(BHU)/Mining/ProjectAKV/2022-23/16MIningGeotechnical Investigation and Seismic Refraction Test (SRT) Works at Different Location on DDM and Yingkiong Road17.05.2022 04.06.2022 upto 4.00 PMDownload BOQ 
IIT(BHU)/ PHE/SKJ/2021-22/02PharmaceuticalSemi-preparative high-performance liquid chromatography (semi-prep hplc)13.05.202202-6-2022Download BOQ 
IIT(BHU)/CCIS/2022-23/Tender/09CCISSubscription of Google Workspace Education Plus at IIT (BHU)05/05/202226.05.2022Download BOQ 
IIT(BHU)/IWD/CT-01/2022-23/24IWDDismanteling of left side wing, one no of toilet block, one no of warden Quarter and disposal of malba of old Dhanrajgiri Hostel10/04/202202.05.2022 (3:00 P.M.)Download BOQ 
IIT(BHU)/BME/SS/20 21-22/001Council of WardensSupply of WIRELESS EEG AMPLIFIER FOR BCI APPLICATION08/04/202228.04.2022 upto 04:00 PMDownload BOQ 
IIT(BHU)/HTL/CoW/22-23/02Council of WardensManaging & Catering Services in Three Messes of Dhanrajgiri07/04/202227.04.2022Download BOQ 
IIT(BHU)/Met-SP/SERB/2021-22/02MetallurgicalIntelligent monitor mig/mag welding machine (320 amp)07/04/202227/04/2022 (04.00 PM)Download BOQ 
IIT(BHU)/Met-SP/SERB/2021-22/01MetallurgicalCNC wire cut EDM machine07/04/202227/04/2022 (04.00 PM)Download BOQ 
IIT(BHU)/MIN/CQMURC/2021-22/12MiningThermal Gravimetric Analyzer (TGA) Two complete Unit05/04/202225.04.2022, Up to 04.00 PM

Download BOQ 

CorrigendumDated: 19.04.2022

CorrigendumDated: 27.04.2022

IIT(BHU)/MIN/CQMURC/2021-22/11MiningPetrographic Study System 1 complete Unit05/04/202204.05.2022 (04.00 PM)

Download BOQ 

CorrigendumDated: 19.04.2022

IIT(BHU)/MIN/CQMURC/2021-22/10MiningHardgrove Grindability Equipment (Tester) 1 complete Unit05/04/202204.05.2022 (04.00 PM)

Download BOQ 

CorrigendumDated: 19.04.2022

IIT(BHU)/IP Cell/Tender-NW/22-23/01Chairman, Local Area NetworkExtension of the Existing Network of the Institute System (Supply, Installation, Commissioning & Testing of System Integrator)01/04/202229.04.2022, Up to0 3.00 PMDownload BOQ