Tenders (2021-22)
| Ref. No. | Dept. Name | Description | Upload Date | Closing Date | Attachments |
|---|---|---|---|---|---|
| IIT(BHU)/MIN/CQMURC/2021-22/08 | Mining, IIT(BHU), Varanasi | Bomb Calorimeter with Water Handling System two complete | 31.03.2022 | 20.04.2022, Up to 04.00 PM | Download BOQ, Corrigendum Dated 19.04.2022 |
| IIT(BHU)/MIN/CQMURC/2021-22/09 | Mining, IIT(BHU), Varanasi | Coal Pulverizer | 31.03.2022 | 28.04.2022, Up to 04.00 PM | Download BOQ, Corrigendum Dated 19.04.2022 |
| IIT(BHU)/IWD/CT-29/2021-22/1728 | IWD, IIT(BHU), Varanasi | P/F aluminium partition work in Precision Engineering Hub | 31.03.2022 | 20.04.2022 (3:00 P.M.) | Download BOQ, Corrigendum Dated 17.05.2022 |
| IIT(BHU)/IWD/CT-28/2021-22/1727 | IWD, IIT(BHU), Varanasi | Making platform with shade and P/F M.S. gate in Precision Engineering Hub | 31.03.2022 | 20.04.2022 (3:00 P.M.) | Download BOQ, Corrigendum Dated 17.05.2022 |
| IIT(BHU)/MIN/AJ/GORBI/2021-22/263 | Mining, IIT(BHU), Varanasi | Portable laser Aerosol Spectrometer | 30.03.2022 | 28.04.2022, Upto 04.00 PM | Download BOQ, GeM Availability Report and Past Transaction Summary, Corrigendum Dated 19.04.2022 |
| IIT(BHU)/ PH/KS/2021-22/04 | Pharmaceutical, IIT(BHU), Varanasi | CLOCK LAB | 29.03.2022 | 20.04.2022 | Download BOQ |
| IIT(BHU)/IWD/CT-27/2021-22/1686 | IWD, IIT(BHU), Varanasi | Construction of servant quarters, Guard Room & two nos of Security Post inside Gandhi Technology Alumni Centre | 25.03.2022 | 18.04.2022 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/SERB Project/EE/21-22/08/340/03 | Electrical, IIT(BHU), Varanasi | Supply of 3 kW, 48 Volts Hydrogen Fuel Cell Generator | 25.03.2022 | 16/04/2022 (03:00 PM) | Download BOQ |
| IIT(BHU)/IWD/CT-26/2021-22/1675 | IWD, IIT(BHU), Varanasi | Construction of chain-link fencing 5’ height above brick work and c/o Pathway in west side of Guest house | 25.03.2022 | 18.04.2022 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/CE/21-22/2303 | Civil, IIT(BHU), Varanasi | Vehicular Tailpipe Particulate Matter Sampler | 24.03.2022 | 14-04-2022 (4 PM) | Download BOQ |
| IIT(BHU)/IWD/CT-25/2021-22/1660 | IWD, IIT(BHU), Varanasi | Landscaping work around newly constructed residence in GTAC | 24.03.2022 | 12.04.2022 (5:00 P.M.) | Download BOQ |
| IIT(BHU)/ME/2021-22/TD/AS/09 | Mechanical, IIT(BHU), Varanasi | Miniature Electronic Pressure Scanners | 22.03.2022 | 06/04/2022, up to 16.00 Hrs. | Download BOQ |
| IIT(BHU)/SERB Project/EE/21-22/08/340/01 | Electrical, IIT(BHU), Varanasi | Digital Storage Oscilloscope 100 MHz with 4 Analog Channel and its compatible Voltage Probe | 21.03.2022 | 12/04/2022 (03:00 PM) | Download BOQ |
| IIT(BHU)/SERB Project/EE/21-22/08/340/02 | Electrical, IIT(BHU), Varanasi | Current Probe: 20 MHz, 5 mA to 212 A, AC/DC | 17.03.2022 | 07/04/2022 (03:00 PM) | Download BOQ |
| IIT(BHU)/SMST/2020-21/XRD/486 | SMST, IIT(BHU), Varanasi | Supply of HIGH RESOLUTION X-RAY DIFFRACTOMETER | 16.03.2022 | 23-Mar-2022 04:00 PM | - |
| IIT(BHU)/PHE/SKJ/2021-22/01 | Pharmaceutical, IIT(BHU), Varanasi | SEMI-PREPARATIVE HIGH-PERFORMANCE LIQUID CHROMATOGRAPHY (SEMI-PREP HPLC) | 15.03.2022 | 05.04.2022 | Download BOQ |
| IIT(BHU)/2021-22/QTN/CE/2609 | Civil, IIT(BHU), Varanasi | HAMBURG WHEEL TESTER | 12.03.2022 | 01-04-2022, up to 15.00 Hrs. | Download BOQ |
| IIT(BHU)/ACD/2021-22/03 | Academic Affairs, IIT(BHU), Varanasi | Supply and Catering Services for 10th Convocation Lunch | 10.03.2022 | 31.03.2022 | - |
| IIT(BHU)/Met-SS/SERB/2021-22/671 | Metallurgical, IIT(BHU), Varanasi | COMPUTER CONTROLLED UNIVERSAL TESTING MACHINE | 09.03.2022 | 29/03/2022 (04:00 PM) | Download BOQ |
| IIT(BHU)/SMST/2021-22/FIST/XRD/486 | SMST, IIT(BHU), Varanasi | HIGH RESOLUTION X-RAY DIFFRACTOMETER | 24.02.2022 | 18.03.2022 up to 04:00 PM | Download BOQ |
| IIT(BHU)/IWD/ET-14/2021-22/1413 | IWD, IIT(BHU), Varanasi | Estimate for Electrical wiring, power point Installation & Illumination works in the Industrial Metallurgy Division (IMD) Hall of Metallurgical Engg Dept IIT(BHU) | 22.02.2022 | 02.03.2022 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-13/2021-22/1412 | IWD, IIT(BHU), Varanasi | Estimate for Electrical wiring, power point Installation & Illumination works in the old Committee room and allied room of control system lab of Electrical Engg Dept | 22.02.2022 | 02.03.2022 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/Mining/Project-AKV/2021-22/130 | Mining, IIT(BHU), Varanasi | Document for geotechnical investigation at different location | 22.02.2022 | 14.03.2022 | Download BOQ |
| IIT(BHU)/Min/GSPS/R&D/NCL/21-22/04 | Mining, IIT(BHU), Varanasi | Automated Direct Shear Test Apparatus for Laboratory Test of Shear Strength of Coal Mine Overburden Dump Material | 21.02.2022 | 18.03.2022 (04.00 PM) | Download BOQ |
| IIT(BHU)/MIN/AJ/GORBI/2021-22/05/195 | Mining, IIT(BHU), Varanasi | Online Multiparameter water Quality Monitor with electrodes & 40m Cables | 15.02.2022 | 07.03.2022, Up to 04.00 PM | Download BOQ |
| IIT(BHU)/Che/2021-22/SK/117 | Chemical, IIT(BHU), Varanasi | High pressure mass flow controllers | 10.02.2022 | 02/03/2022 (04:00PM) | Download BOQ |
| IIT(BHU)/ME/2021-22/TD/AS/08 | Mechanical, IIT(BHU), Varanasi | Potentiostat with Data Acquisition System | 09.02.2022 | 01/03/2022, up to 04:00 pm | Download BOQ |
| IIT(BHU)/CCIS/2021-22/Tender/56 | CCIS, IIT(BHU), Varanasi | Supply and installation of web servers at centre for computing & information service | 04.02.2022 | 26.02.2022 | Download BOQ, Corrigendum Dated 11.02.2022, Corrigendum Dated 25.02.2022, Corrigendum Dated 05.03.2022 |
| IIT(BHU)/SP/Glove Box/2021-22/T01/073 | Ceramic, IIT(BHU), Varanasi | Lab-scale glove box without plc | 03.02.2022 | 23/02/2022 (04:00PM) | Download BOQ |
| IIT(BHU)/SP/Ball Mill/2021-22/T01/072 | Ceramic, IIT(BHU), Varanasi | Ceramic coated planetary ball mil | 03.02.2022 | 23/02/2022 (04:00PM) | Download BOQ |
| IIT(BHU)/ME/2021-22/TD/AS/08 | Mechanical, IIT(BHU), Varanasi | Potentiostat with Data Acquisition System | 02.02.2022 | 15/02/2022, up to 03:00 pm | - |
| IIT(BHU)/ME/2021-22/TD/AS/07 | Mechanical, IIT(BHU), Varanasi | Table-top CNC Milling and Drilling Machine | 02.02.2022 | 18/02/2022, up to 03:00 pm | - |
| IIT(BHU)/GEM/2022/B/1909974 | Higher Education, IIT(BHU), Varanasi | Flow Cytometer | 01.02.2022 | 22-02-2022 11:00:00 | Technical Specifications |
| IIT(BHU)/I.P.Cell/2021-22/Laptop/609 | Institute Purchase Cell, IIT(BHU), Varanasi | TENDER DOCUMENT FOR SUPPLY AND INSTALLATION OF LAPTOP | 27.01.2022 | 04.02.2022 | Download BOQ, Corrigendum Dated 03.02.2022 |
| IIT(BHU)/ACD/Convocation/Purchase/2021-22/QTN/1124 | Academic Affairs, IIT(BHU), Varanasi | Quotation Enquiry of Sadri for 10th Convocation of the Institute-reg. | 20.01.2022 | 28.01.2022 (5:00 P.M.) | - |
| IIT(BHU)/IWD/CT-22/2021-22/1244 | IWD, IIT(BHU), Varanasi | Reparing of walls of 40 No of rooms and lobby in Limbdi Hostel | 17.01.2022 | 05.02.2022 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-19/2021-22/1243 | IWD, IIT(BHU), Varanasi | Repairing to patches of various bitumenous Road of NCC booth to GSC (Extn.) Crossing, Front of Vivekanand Hostel, Visvesvaraya Crossing to Karamanveer and IIT Crossing to Scada building Crossing | 17.01.2022 | 05.02.2022 (3:00 P.M.) | Download BOQ, Corrigendum Dated 03.02.2022, Corrigendum Dated 10.03.2022 |
| IIT(BHU)/Budget/CA/2021-22/01 | Office of the Budget, IIT(BHU), Varanasi | Notice inviting e-tender from chartered accountant firms | 14.01.2022 | 03.02.2022 | Download BOQ, Corrigendum Dated 24.01.2022, Corrigendum Dated 02.02.2022 |
| IIT(BHU)/IWD/CT-24/2021-22/1203 | IWD, IIT(BHU), Varanasi | Providing and fixing acoustic wooden wall panelling and distempering work in Committee room and Director office in Adminstrative building | 14.01.2022 | 02.02.2022 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-23/2021-22/1202 | IWD, IIT(BHU), Varanasi | Demolishing and making of Plinth protection of Morvi Hostel | 14.01.2022 | 02.02.2022 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-21/2021-22/1201 | IWD, IIT(BHU), Varanasi | P/F uPVC and fly proof stainless steel in 12 Nos of windows in GTAC | 14.01.2022 | 02.02.2022 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/CT-20/2021-22/1200 | IWD, IIT(BHU), Varanasi | Scraping, reparing and painting of lecture theatre, rooms, corridoors in GF & FF and outer painting of ABLT building | 14.01.2022 | 02.02.2022 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/Min/GSPS/R&D/NCL/21-22/03 | Mining, IIT(BHU), Varanasi | Automated Direct Shear Test Apparatus for laboratory test of Shear Strength of Coal Mine Overburden Dump Material | 10.01.2022 | 28.01.2022 (04.00 PM) | Download BOQ |
| IIT(BHU)/Admin/2021-22/01 | IP Cell, IIT(BHU), Varanasi | Cleaning, Sanitization and Disposal of Solid Waste | 10.01.2022 | 14.01.2022, 15:00 Hrs | Download BOQ, Corrigendum Dated 11.01.2022 |
| IIT(BHU)/IWD/CT-18/2021-22/1167 | IWD, IIT(BHU), Varanasi | Repair to patch plaster, aluminium partition and painting work | 10.01.2022 | 29.01.2022 (3:00 P.M.) | Download BOQ, Corrigendum Dated 10.03.2022 |
| IIT(BHU)/Met-HD/JB/2021-22/01 | Metallurgical, IIT(BHU), Varanasi | HIGH TEMPEARTURE TUBE FURNACE | 07.01.2022 | 12/01/2022 (04:00 PM) | Download BOQ |
| IIT(BHU)/Met-HD/JB/2021-22/02 | Metallurgical, IIT(BHU), Varanasi | High Speed Precision Cutter | 06.01.2022 | 12/01/2022 (04:00 PM) | Download BOQ |
| IIT(BHU)/EE/2021-22/35 | Electrical, IIT(BHU), Varanasi | 3 HP PMBLDC MOTOR COUPLED WITH DC GENERATOR WITH DRIVE AND IN BUILT CONTROLLER | 06.01.2022 | 27/01/2022 (04:00 PM) | Download BOQ |
| IIT(BHU)/I.P.CELL/2021-22/561 | IP Cell, IIT(BHU), Varanasi | Supply, Installation, Demonstration and Training of Prototype Multi Layered PCB Fabrication | 05.01.2022 | 25-01-2022 | Download BOQ, Corrigendum Dated 17.01.2022, Corrigendum Dated 28.02.2022 |
| IIT(BHU)/IWD/CT-17/2021-22/1159 | IWD, IIT(BHU), Varanasi | Special repair of Slab and beam (Guniting work) of Industrial Metallurgy Division (IMD) Hall -1 | 04.01.2022 | 03.01.2022 (3:00 P.M.) | Download BOQ, Corrigendum Dated 10.03.2022 |
| IIT(BHU)/ASD/Anaerobic Digester/2021-22/T01/002 | Biomedical, IIT(BHU), Varanasi | LAB-SCALE ANAEROBIC DIGESTER SET-UP | 04.01.2022 | 13/01/2022 (03:00 PM) | Download BOQ |
| IIT(BHU)/BME/SKM/2021-22/002 | Biomedical, IIT(BHU), Varanasi | Supply of Texture Analyzer | 04.01.2022 | 24.01.2022 upto 04:00 PM | Download BOQ |
| IIT(BHU)/MIN/AKV/SERB/2021-22/92 | Mining, IIT(BHU), Varanasi | Electrical Resistivity Tomography (ERT) | 31.12.2021 | 20/01/2022 | Download BOQ |
| IIT(BHU)/MIN/AKV/SERB/2021-22/91 | Mining, IIT(BHU), Varanasi | Multi Channel Acoustic Emission System with Data Logs | 31.12.2021 | 20/01/2022 | Download BOQ |
| IIT(BHU)/Min/SKS/R&D/NCL/21-22/02 | Mining, IIT(BHU), Varanasi | TDR System for monitoring rock slope displacement in an opencast coal mine | 28.12.2021 | 17.01.2022 (04.00 PM) | Download BOQ |
| IIT(BHU)/Physics/RKS/21-22/70 | Physics, IIT(BHU), Varanasi | Spatial light modulator (Phase mode only)- reflective type | 27.12.2021 | 13.01.2022, up to 04.00 PM | Download BOQ |
| IIT(BHU)/ASD/CMGB/2021-22/T01/01 | Biochemical, IIT(BHU), Varanasi | Custom Made Glass Biodigeseters | 23.12.2021 | 13.01.2022 (3:00 pm) | - |
| IIT(BHU)/ASD/Spectrophotometer/2021-22/T02/002 | Biochemical, IIT(BHU), Varanasi | SINGLE BEAM UV - VISIBLE SPECTROPHOTOMETER | 20.12.2021 | 10.01.2022 4:00 pm | Download BOQ |
| IIT(BHU)/ASD/Spectrophotometer/2021-22/T02/002 | Biochemical, IIT(BHU), Varanasi | SINGLE BEAM UV - VISIBLE SPECTROPHOTOMETER | 20.12.2021 | 10.01.2022 4:00 pm | Download BOQ |
| IIT(BHU)/Admin/2021-22/01 | Institute Purchase Cell, IIT(BHU), Varanasi | Cleaning, Sanitization and Disposal of Solid Waste | 20.12.2021 | 07-Jan-2022 04:00 PM | Download BOQ |
| IIT(BHU)/IP Cell/2021-22/502 | Institute Purchase Cell, IIT(BHU), Varanasi | Hiring of Vehicle (Innova Crysta) at IIT (BHU), Varanasi. | 18.12.2021 | 27/12/2022 (06:00 PM) | Download BOQ |
| IIT(BHU)/ASD/Cylinder/2021-22/T01/01 | Biochemical Engg, IIT(BHU), Varanasi | Gas Cylinder, Pressure Gauge and Tubing | 17.12.2021 | 07/01/2022 (03:00 PM) | - |
| IIT(BHU)/CE/2021-22/1628 | Civil Engg, IIT(BHU), Varanasi | A vehicular tailpipe gas sampler (integrated with other sensors) with the following data capability. | 10.12.2021 | 31/12/2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/Met-HD/MMD/2021-22/424 | Metallurgical Engg, IIT(BHU), Varanasi | Tubular Furnace with Vacuum and Gas Purging Facility | 10.12.2021 | 30/12/2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/PH/DKR/2021-22/04 | Pharmaceutical Engg, IIT(BHU), Varanasi | CONTACT ANGLE MEASUREMENT INSTRUMENT | 08.12.2021 | 29.12.2021 | Download BOQ GeM Availability Report and Past Transaction Summary Corrigendum Cancellation, Dated: 02.02.2022 |
| IIT(BHU)/ASD/Anaerobic Digester/2021-22/T01/001 | Biochemical Engg, IIT(BHU), Varanasi | LAB-SCALE ANAEROBIC DIGESTER SET-UP | 07.12.2021 | 28/12/2021 (03:00 PM) | Download BOQ |
| IIT(BHU)/GEM/2021/B/1721423 | School of Materials Science and Technology, IIT(BHU), Varanasi | Supply of Source and Nano Voltmeter | 07.12.2021 | 22-12-2021 16:00:00 | - |
| IIT(BHU)/Che/2021-22/UG/83 | Chemical Engg, IIT(BHU), Varanasi | Advanced contact angle goniometer | 07.12.2021 | 27/12/2021 (03:00PM) | Download BOQ |
| IIT(BHU)/IP Cell/2021-22/502 | Institute Purchase Cell, IIT(BHU), Varanasi | Hiring of Vehicle (Innova Cryta) | 06.12.2021 | 14-12-2021 upto 18.00 Hrs. | Download BOQ |
| IIT(BHU)/CE/21-22/1735 | Civil Engg, IIT(BHU), Varanasi | A vehicular tailpipe particulate matter sampler (integrated with other sensors) with the following capturing capability | 10.12.2021 | 30/12/2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/GYM/2021-22/115 | Gymkhana, IIT(BHU), Varanasi | Supply, Installation, Demonstration and Training of SAC Gymnasium Facility | 03.12.2021 | 23/12/2021 | Download BOQ Corrigendum, Dated: 09.12.2021 Corrigendum, Dated: 10.12.2021 |
| IIT(BHU)/IWD/CT-16/2021-22/987 | IWD, IIT(BHU), Varanasi | Repair to patch plaster, aluminium partition and painting work of School of Biochemical Engineering | 02.12.2021 (3:00 P.M.) | 23.12.2021 (3:00 P.M.) | Download BOQ Corrigendum Cancellation, Dated: 28.01.2022 |
| IIT(BHU)/IWD/ET-12/2021-22/945 | IWD, IIT(BHU), Varanasi | Electrical installations and wiring works in Bathroom, Mess and common area of S.C. Day Hostel | 12.11.2021 (4:00 P.M.) | 03.12.2021 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-10/2021-22/940 | IWD, IIT(BHU), Varanasi | Electrical installations, Illumination and wiring works in laboratory space of Control System | 11.11.2021 (4:00 P.M.) | 02.12.2021 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/IWD/ET-09/2021-22/939 | IWD, IIT(BHU), Varanasi | Electrical installations and wiring works in Bathroom, Mess & Common area of Vivekanand Hostel | 11.11.2021 (4:00 P.M.) | 02.12.2021 (4:00 P.M.) | Download BOQ |
| IIT(BHU)/GTAC/2021-22/125 | Gandhi Technology Alumni Centre (GTAC), IIT(BHU), Varanasi | Housekeeping and Catering Services in Gandhi Technology Alumni Centre (GTAC) | 01/12/2021 | 22/12/2021 | Download BOQ |
| IIT(BHU)/ME/21-22/TD/PROD/SK/06 | Mechanical, IIT(BHU), Varanasi | 100 TON Capacity Foreword Hot/Cold Extrusion Machine | 29/11/2021 | 17/12/2021, up to 16.00 Hrs. | Download BOQ |
| IIT(BHU)/BME/SKM/2021-22/003 | Biomedical, IIT(BHU), Varanasi | Supply of 3D Bioprinting System | 29/11/2021 | 17.12.2021 upto 04:00 PM | Download BOQ |
| IIT(BHU)/BME/SKM/2021-22/001 | Biomedical, IIT(BHU), Varanasi | Supply of Texture Analyzer | 29/11/2021 | 17.12.2021 upto 04:00 PM | Download BOQ |
| IIT(BHU)/Met-VJ/DRDO/2021-22/01 | Metallurgical, IIT(BHU), Varanasi | CHARPY IMPACT TESTER MACHINE | 29/11/2021 | 17/12/2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/WS/2021-2022/134 | Main Workshop, IIT(BHU), Varanasi | Investment casting setup with specifications | 26/11/2021 | 15.12.2021 03.00 PM | Download BOQ |
| IIT(BHU)/WS/2021-2022/132 | Main Workshop, IIT(BHU), Varanasi | Fully Automatic Plastic Injection Moulding Machine with specifications | 25/11/2021 | 15.12.2021 03.00 PM | Download BOQ |
| IIT(BHU)/ASD/Spectrophotometer/2021-22/T01/001 | E-Procurement Cell, IIT(BHU), Varanasi | SINGLE BEAM UV - VISIBLE SPECTROPHOTOMETER | 25/11/2021 | 15/12/2021 (03:00 PM) | Download BOQ |
| IIT(BHU)/Physics/RKS/21-22/66 | Physics, IIT(BHU), Varanasi | Optical Table with Vibration Isolation and Mechanical elements | 24/11/2021 | 14.12.2021, up to 04.00 PM | Download BOQ |
| IIT(BHU)/RECOVERY/GIS/2021-22/8135 | Recovery Section, IIT(BHU), Varanasi | Group Term Insurance | 23/11/2021 | 13/12/2021 (16:00 hrs) | Download BOQ |
| IIT(BHU)/IWD/CT-10/2021-22/796 | IWD, IIT(BHU), Varanasi | Dismantle of old ceiling, guniting of ceiling, distempering and other repair work in 143 nos. of rooms and passage areas of Dhanrajgiri Hostel | 22/10/2021 | 13.11.2021 (3:00 P.M.) | Download BOQ Corrigendum, Dated: 27.10.2022 |
| IIT(BHU)/ME/TD/2021-22/RKG/03 | Mechanical Engineering, IIT(BHU), Varanasi | Two Station Planetary Ball Milling Machine along with all accessories | 11/11/2021 | 01/12/2021, up to 15.00 Hrs. | Download BOQ |
| IIT(BHU)/CE/IMPRINT Project/2021-22/09 | Civil Engineering, IIT(BHU), Varanasi | Portable Data Acquisition System and Portable Data Connectivity System | 09/11/2021 | 30.11.2021 (04:00 PM) | Download BOQ |
| IIT(BHU))/Min/HD/21-22/4005 | Mining Engineering, IIT(BHU), Varanasi | Human CAD | 05/11/2021 | 24.11.2021 (04.00 PM) | Download BOQ |
| IIT(BHU))/SBChE/Flow Cytometer/2021-22/T02/341 | Biochemical Engineering, IIT(BHU), Varanasi | FLOW CYTOMETER | 05/11/2021 | 25/11/2021 (03:00 PM) | Download BOQ |
| IIT(BHU))/IWD/CT-15/2021-22/885 | IWD, IIT(BHU), Varanasi | Renovation of toilet (Mess side) and damaged sewer line of toilet both side of Rajputana Hostel | 03/11/2021 | 23.11.2021 (3:00 P.M.) | Download BOQ |
| IIT(BHU))/BME/SKM/2021-22/001 | Biomedical Engineering, IIT(BHU), Varanasi | Supply of 3D Bioprinting System | 03/11/2021 | 23.11.2021 upto 04:00 PM | Download BOQ |
| IIT(BHU)/MIN/AJ/GORBI/2021-22/159 | Mining Engineering, IIT(BHU), Varanasi | Handheld XRF Analyzer | 29/10/2021 | 15.11.2021, Up (04:00 PM) | Download BOQ |
| IIT(BHU)/Met-VJ/DRDO/2021-22/01 | Metallurgical Engineering, IIT(BHU), Varanasi | CHARPY IMPACT TESTER MACHINE | 28/10/2021 | 15/11/2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/ME/21-22/TD/PROD/SK/05 | Mechanical Engineering, IIT(BHU), Varanasi | 100 TON Capacity Foreword Hot/Cold Extrusion Machine | 27/10/2021 | 15/11/2021, up to 16.00 Hrs. | Download BOQ |
| IIT(BHU)/PH/DKR/2021-22/04 | Pharmaceutical Engg | 100 TON Capacity Foreword Hot/Cold Extrusion Machine | - | - | Download BOQ |
| IIT(BHU)/SMST/2021-22/OH-35/FS/266 | SMST | Fluorescence Spectrophotometer | 26/10/2021 | 15.11.2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/Physics/RKS/21-22/64 | Physics | Mechanical Elements | 25/10/2021 | 15.11.2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/Physics/RKS/21-22/63 | Physics | Optical elements | 25/10/2021 | 15.11.2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/WS/2021-2022/105 | Main Workshop | Investment casting setup | 18/10/2021 | 05.11.2021 (03:00 PM) | Download BOQ |
| IIT(BHU)/WS/2021-2022/104 | Main Workshop | Fully Automatic Plastic Injection Moulding Machine | 14/10/2021 | 05.11.2021 (03:00 PM) | Download BOQ |
| IIT(BHU)/Met-HD/MMD/2021-22/304 | Metallurgical Engg | Tubular Furnace with Vacuum and Gas Purging Facility | 14/10/2021 | 03.11.2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/SMST/2021-22/OH-35/EW/236 | SMST | Electrochemical Workstation | 12/10/2021 | 29.10.2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/Min/SKS/R&D/NCL/21-22/01 | Mining | TDR System for monitoring rock slope displacement | 11/10/2021 | 01.11.2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/ME/TD/21-22/TD/TH/04/AK | Mechanical Engg | CTA System for Flow Velocity Measurement | 08/10/2021 | 29.10.2021 | Download BOQ |
| IIT(BHU)/Physics/RKS/21-22/62 | Physics | He-Ne Laser + CCD Camera | 08/10/2021 | 29.10.2021 | Download BOQ |
| IIT(BHU)/EE/2021-22/15 | Electrical Engg | 3 HP PMBLDC Motor with DC Generator | 08/10/2021 | 22.10.2021 | - |
| IIT(BHU)/SBChE/Flow Cytometer/2021-22/T01/319 | Biochemical Engg | Flow Cytometer | 07/10/2021 | 28.10.2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/FPC/2021-22/002 | FPC | Supply of Kitchen and Dining Items | 06/10/2021 | 27.10.2021 | Download BOQ |
| IIT(BHU)/IWD/ET-08/2021-22/736 | IWD | Cable Supply & Laying for R&D Building | 04/10/2021 | 24.11.2021 | Download BOQ |
| IIT(BHU)/IWD/ET-07/2021-22/735 | IWD | Electrical Wiring & Illumination Works | 04/10/2021 | 09.11.2021 | Download BOQ |
| IIT(BHU)/IWD/Lift/ET-11/2021-22/711 | IWD | AMC of Passenger Lifts | 30/09/2021 | 20.10.2021 | Download BOQ |
| IIT(BHU)/BME/SKM/2021-22/001 | Biomedical Engg | 3D Bioprinting System | 25/09/2021 | 15.10.2021 | Download BOQ |
| IIT(BHU)/IWD/CT-09/2021-22/682 | IWD | Asbestos Sheet Removal Work | 23/09/2021 | 30.09.2021 | - |
| IIT(BHU)/IWD/CT-08/2021-22/681 | IWD | Platform Construction for Aircraft Installation | 23/09/2021 | 30.09.2021 | - |
| IIT(BHU)/IWD/CT-14/2021-22/680 | IWD | Kitchen Renovation Work | 23/09/2021 | 20.10.2021 | Download BOQ |
| IIT(BHU)/IWD/CT-13/2021-22/679 | IWD | Kitchen Renovation (SC De Hostel) | 23/09/2021 | 20.10.2021 | Download BOQ |
| IIT(BHU)/IWD/CT-12/2021-22/678 | IWD | Roofing & Interior Work | 23/09/2021 | 20.10.2021 | Download BOQ |
| IIT(BHU)/IWD/CT-11/2021-22/677 | IWD | Wall Plaster & Finishing Work | 23/09/2021 | 20.10.2021 | Download BOQ |
| IIT(BHU)/SMST/2021-22/OH-35/FS/198 | SMST | Fluorescence Spectrophotometer | 23/09/2021 | 13.10.2021 | Download BOQ |
| IIT(BHU)/IWD/CT-07/2021-22/671 | IWD | Toilet Renovation Work | 22/09/2021 | 13.10.2021 | Download BOQ |
| IIT(BHU)/FPC/2021-22/001 | FPC | Furniture Rate Contract | 22/09/2021 | 11.10.2021 | - |
| IIT(BHU)/IWD/CT-06/2021-22/670 | IWD | Warden Quarter Repair Work | 22/09/2021 | 29.09.2021 | - |
| IIT(BHU)/IWD/CT-05/2021-22/669 | IWD | Warden Quarter Renovation | 22/09/2021 | 29.09.2021 | - |
| IIT(BHU)/IWD/CT-04/2021-22/668 | IWD | Machine Shop Renovation | 22/09/2021 | 29.09.2021 | - |
| IIT(BHU)/IWD/CT-03/2021-22/667 | IWD | Lab Partition Work | 22/09/2021 | 29.09.2021 | - |
| IIT(BHU)/IWD/ET-06/2021-22/622 | IWD | Electrical Work E-Hall | 14/09/2021 | 20.09.2021 | - |
| IIT(BHU)/CE/2021-22/1021 | Civil | Pressure Ageing Vessel & Vacuum Oven | 13/09/2021 | 04.10.2021 | Download BOQ |
| IIT(BHU)/Physics/RKS/21-22/56 | Physics | Honeycomb Bread Board | 10/09/2021 | 29.09.2021 | Download BOQ |
| IIT(BHU)/Che/21-22/RKU/001 | Chemical | BET Surface Area Analyzer | 08/09/2021 | 30.09.2021 | Download BOQ |
| IIT(BHU)/ME/TD/20-21/RKG/02 | Mechanical | Ball Milling Machine | 07/09/2021 | 27.09.2021 | Download BOQ |
| IIT(BHU)/IWD/ET-05/2020-21/576 | IWD | Electrical & Communication Work | 04/09/2021 | 09.09.2021 | - |
| IIT(BHU)/ACD/Convocation/3462 | Academic Affairs | Convocation Modals | 26/08/2021 | 03.09.2021 | - |
| IIT(BHU)/ACD/Convocation/3463 | Academic Affairs | Leatherite Degree Folder | 26/08/2021 | 03.09.2021 | - |
| IIT(BHU)/IWD/ET-04/2021-22/447 | IWD | Electrical Works RKVY Scheme | 24/08/2021 | 14.09.2021 | - |
| IIT(BHU)/IWD/CT-02/2021-22/491 | IWD | Special repair of Slab and beam (Guniting work) of Industrial Metallurgy Division (IMD) Hall -1 | 24/08/2021 | 4:00 P.M on or before 24.09.2021 | - |
| IIT(BHU)/IWD/CT-01/2021-22/490 | IWD | P/L vitrified tiles flooring, false ceiling, aluminium windows shutter and Electrical works | 24/08/2021 | 3:00 P.M on or before 31.08.2021 | - |
| IIT(BHU)/SMST/2021-22/FIST/XRD/137 | SMST | HIGH RESOLUTION X-RAY DIFFRACTOMETER | 23/08/2021 | 13.09.2021 up to 04:00 PM | Download BOQ |
| IIT(BHU)/MET/KC/NRB/21-22/01 | Metallurgical | Automatic Bulk Electropolishing Machine | 23/08/2021 | 10.09.2021 up to 03.00 PM | Download BOQ |
| IIT(BHU)/2021-22/QTN/CE/774 | Civil | ROLLING THIN FILM OVEN | 16/08/2021 | 06-09-2021 up to 15.00 Hrs | Download BOQ |
| IIT(BHU)/2021-22/QTN/CE/773 | Civil | PRESSURE AGEING VESSEL & VACUUM DEGASING OVEN | 16/08/2021 | 06-09-2021 up to 15.00 Hrs | Download BOQ |
| IIT(BHU)/Physics/RKS/21-22/52 | Physics | Spatial light modulator (Phase mode only)- reflective type | 12/08/2021 | 02.09.2021 up to 04.00 PM | Download BOQ |
| IIT(BHU)/Physics/RKS/21-22/53 | Physics | CCD Camera | 12/08/2021 | 02.09.2021 up to 04.00 PM | Download BOQ |
| IIT(BHU)/IWD/ET-02/2021-22/382 | IWD | Annual Operation & Maintenance Contract for Substation systems | 05/08/2021 | 26.08.2021 | Download BOQ |
| IIT(BHU)/IWD/Lift/ET-03/2021-22/381 | IWD | Comprehensive annual maintenance contract of passenger lifts | 05/08/2021 | 26.08.2021 | Download BOQ |
| IIT(BHU)/MIN/AJ/GORBI/2021-22/1355 | Mining | Handheld XRF Analyzer | 04-08-2021 | 25.08.2021 up to 04:00 PM | - |
| IIT(BHU)/IWD/ET-01/2021-22/350 | IWD | Electrical Works in Incubator area | 02-08-2021 | 06.08.2021 (3:00 P.M.) | Download BOQ |
| IIT(BHU)/2021-22/QTN/CE/653 | Civil Engineering | Dynamic Shear Rheometer | 29-07-2021 | 19-08-2021 (03:00 PM) | Download BOQ |
| IIT(BHU)/IDAPT/2021-22/Desktop i7 | IDAPT | i7 Desktop Computer | 23/07/2021 | 12.08.2021 (04:00 PM) | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/47 | Physics | Polarizing cube Beamsplitter | 23/07/2021 | 13.08.2021 | Download BOQ |
| IIT(BHU)/EE/PROJECT/21-22/01 | Electrical Engineering | PEM Fuel Cell System 2000 Watt | 19/07/2021 | 09-08-2021 | Download BOQ |
| IIT(BHU)/Physics/RKS/21-22/45 | Physics | CCD Camera | 15/07/2021 | 05.08.2021 | Download BOQ |
| IIT(BHU)/Physics/RKS/21-22/44 | Physics | Spatial light modulator | 15/07/2021 | 05.08.2021 | Download BOQ |
| IIT(BHU)/R&D/SA/DBT/Pharma/2021-22/D33 | Pharma | HPLC Semi-Preparative | 15/07/2021 | 21.08.2021 16:00 Hrs | Download BOQ |
| IIT(BHU)/GEM/2021/B/1359788 | Higher Education | CPU Based Workstation | 15/07/2021 | 05-08-2021 13:00 | - |
| IIT(BHU)/EE/PROJECT/21-22/04 | Electrical Engineering | Feeder Protection Relay System | 14/07/2021 | 16.08.2021 | Download BOQ |
| IIT(BHU)/SMST/2021-22/FIST/XRD/73 | SMST | High Resolution XRD | 14/07/2021 | 04.08.21 | Download BOQ |
| IIT(BHU)/IDAPT/2021-22/Desktop i7 | IDAPT | i7 Desktop Computer | 09/07/2021 | 29.07.2021 | Download BOQ |
| IIT(BHU)/CSE/QTN/Seed Money-PJC/2021-22/130 | CSE | Smart Water IoT Kit | 08/07/2021 | 29/07/2021 | - |
| IIT(BHU)/CE/DST/01 | Civil Engineering | UAV Drone for mapping | 07/07/2021 | 29-07-2021 | Download BOQ |
| IIT(BHU)/IDAPT/2021-22/Laptop i5 | IDAPT | i5 Laptop | 06/07/2021 | 27.07.2021 | Download BOQ |
| IIT(BHU)/SMST/2021-22/EWS/MM/57 | SMST | Current source & nanovoltmeter system | 05/07/2021 | 26.07.2021 | Download BOQ |
| IIT(BHU)/GEM/2021/B/1324037 | Chemical Engineering | CPU Workstation | 01/07/2021 | 22.07.2021 | - |
| IIT(BHU)/R&D/SERB/SMST/2021-22/BNP/10 | Biochemical Engineering | EQE Measurement Setup | 30/06/2021 | 21.07.2021 | Download BOQ |
| IIT(BHU)/R&D/PC/2021-22/BCE/MBD | Biochemical Engineering | Miniaturized Biosensing Device | 30/06/2021 | 21.07.2021 | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/42 | Physics | He-Ne Laser | 30/06/2021 | 20.07.2021 | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/41 | Physics | Polarizing Cube | 30/06/2021 | 20.07.2021 | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/40 | Physics | Mirror Mount | 25/06/2021 | 15-07-2021 | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/39 | Physics | Round Protected Aluminum Mirror | 25/06/2021 | 15-07-2021 | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/38 | Physics | Beam Splitter Mount | 25/06/2021 | 15-07-2021 | Download BOQ |
| IIT(BHU)/ACD/2020-21/Annual Report/(2020-21)/Quotation/1069 | Academic Affairs | Printing of Annual Report | 18/06/2021 | 28/06/2021 till 17:00hrs | - |
| IIT(BHU)/CER/2021-22/ENQ/12 | Ceramic Engineering | Probe sonicator for nano ceramic/ferrite powder | 03/06/2021 | 17/06/2021 | Download BOQ |
| IIT(BHU)/ME/2021-22/TD/01/AS | Mechanical Engineering | High Speed Camera | 28/05/2021 | 21/06/2021 | Download BOQ |
| IIT(BHU)/RECOVERY/GIS/2021-22 | Recovery Section | Group Term Insurance Tender | 26/05/2021 | 04.06.2021 (17:00 Hrs) | Download BOQ |
| IIT(BHU)/PH/FY/2021-22/QTN/M/02 | Pharmaceutical Engineering | Cryostat Complete Unit | 22/05/2021 | 12.06.2021 15:00 Hrs | Download BOQ |
| IIT(BHU)/PH/FY/2021-22/QTN/M/01 | Pharmaceutical Engineering | Multimode Microplate Reader | 22/05/2021 | 12.06.2021 15:00 Hrs | Download BOQ |
| IIT(BHU)/CIF/2020-21/Confocal/92 | CIF | Confocal Laser Scanning Microscope | 17/03/2021 | 07.04.2021 | Download BOQ |
| IIT(BHU)/CE/IMPRINT/2020-21/48 | Civil Engineering | Portable Data Acquisition System | 16/03/2021 | 08.04.2021 | Download BOQ |
| IIT(BHU)/Physics/20-21/270 | Physics | Dilatometer | 15/03/2021 | 03.04.2021 | Corrigendum |
| IIT(BHU)/IDAPT/2020-21/MacBook | IDAPT | MacBook Supply | 04/03/2021 | 25/03/2021 | Download BOQ |
| IIT(BHU)/IDAPT/2020-21/Desktop | IDAPT | i7 Desktop Supply | 04/03/2021 | 25/03/2021 | Download BOQ |
| IIT(BHU)/CHE/2020-21/QTN/157 | Chemical Engineering | Basic Solar Simulator | 04/03/2021 | 18/03/2021 | - |
| IIT(BHU)/IDAPT/2020-21/Laptop | IDAPT | Laptop Supply | 04/03/2021 | 24/03/2021 | Download BOQ |
| IIT(BHU)/IDAPT/2020-21/Cloud | IDAPT | Private Cloud Setup | 04/03/2021 | 24/03/2021 | Download BOQ |
| IIT(BHU)/SMST/2020-21/EWS/MM/57 | SMST | Thermopower measurement system equipment | 05/07/2021 | 26.07.2021 | Download BOQ |
| IIT(BHU)/GEM/2021/B/1359788 | Higher Education | CPU Workstation Bid | 15/07/2021 | 05-08-2021 | - |
| IIT(BHU)/R&D/SERB/SMST/2021-22/BNP/10 | Biochemical Engineering | EQE Measurement Setup | 30/06/2021 | 21.07.2021 | Download BOQ |
| IIT(BHU)/R&D/PC/2021-22/BCE/MBD | Biochemical Engineering | Miniaturized Biosensing Device | 30/06/2021 | 21.07.2021 | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/42 | Physics | He-Ne Laser System | 30/06/2021 | 20.07.2021 | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/41 | Physics | Polarizing Cube 1 inch | 30/06/2021 | 20.07.2021 | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/40 | Physics | Mirror Mount | 25/06/2021 | 15-07-2021 | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/39 | Physics | Round Protected Aluminum Mirror | 25/06/2021 | 15-07-2021 | Download BOQ |
| IIT(BHU)/RKS/QTN/2021-22/38 | Physics | Beam Splitter Mount | 25/06/2021 | 15-07-2021 | Download BOQ |
| IIT(BHU)/CCIS/2020-21/Tender/08 | CCIS | RHEL OS Licenses Renewal | 18/02/2021 | 11/03/2021 | Download BOQ |
| IIT(BHU)/IWD/CT-030/1044 | IWD | Roof Waterproofing Work | 18/02/2021 | 12.03.2021 | Corrigendum |
| IIT(BHU)/SBChE/Laptop/2020-21/QTN-01/153 | Biochemical Engineering | Laptop Supply & Installation | 17/02/2021 | 03/03/2021 | - |
| IIT(BHU)/ME /HS/2020-21/Tender/02 | Humanistic Studies | IBB SPSS statistics Base/Preminum | 17/02/2021 | 24/02/2021 | |
| IIT(BHU/ME/20-21/TD/05/APH | Mechanical Engineering | Spray Pyrolysis Equipment | 17/02/2021 | 11/03/2021 (03:00 PM) | Download BOQ |
| IIT(BHU/ME/20-21/TD/04/AS | Mechanical Engineering | Engraver | 17/02/2021 | 11/02/2021 (03:00 PM) | ePublishing System |
| IIT(BHU/Physics/20-21/179 | Physics | Dilatometer | 17/02/2021 | 08/03/2021 (03:00 PM) | Download BOQ |
| IIT(BHU/SMST/2020-21/NK/SG/360 | Materials Science | Twin Jet Polisher | 15/02/2021 | 05/03/2021 (04:00 PM) | Download BOQ |
| IIT(BHU/MET/KC/SERB/20-21/02 | Metallurgical Engineering | CNC Wirecut EDM Machine | 11/02/2021 | 02/03/2021 (03:00 PM) | Download BOQ |
| IIT(BHU/BME/20-21/875/O | Biomedical Engineering | CO2 Incubator for Animal Cell Culture | 08/02/2021 | 12/03/2021 (05:00 PM) | |
| IIT(BHU/Physics/QTN/2020-21/170 | Physics | Gamma Ray Equipment | 08/02/2021 | 08/03/2021 (02:00 PM) | Corrigendum |
| IIT(BHU/Physics/QTN/2020-21/169 | Physics | Fresnel Biprism | 08/02/2021 | 08/03/2021 (02:00 PM) | Corrigendum |
| IIT(BHU/Physics/QTN/2020-21/168 | Physics | Couple Pendula | 08/02/2021 | 08/03/2021 (02:00 PM) | Corrigendum |
| IIT(BHU/Physics/QTN/2020-21/167 | Physics | Gyroscope | 08/02/2021 | 08/03/2021 (02:00 PM) | Corrigendum |
| IIT(BHU/BME/2020-21/868 | Biomedical Engineering | Glove Box | 05/02/2021 | 19/02/2021 (02:00 Hrs) | |
| IIT(BHU/IWD/2020-21/CT-029/799 | Institute Works Dept. | Waterproofing and Repair Works | 05/02/2021 | 26/02/2021 (15:00 Hrs) | Download BOQ |
| IIT(BHU/PH/FY/2020-21/QTN/M/64 | Pharmaceutical Engg. | Compression Tablet Machine | 03/02/2021 | 24/02/2021 (03:00 PM) | Download BOQ |
| IIT(BHU/MET/DRDO/VJ/20-21/02 | Metallurgical Engineering | Vacuum Hot Press | 02/02/2021 | 23/02/2021 (05:00 PM) | Download BOQ |
| IIT(BHU/IWD/2020-21/CT-028/798 | Institute Works Dept. | Construction / Flooring / Electrical Works | 02/02/2021 | 19/02/2021 (01:00 Hrs) | |
| IIT(BHU/IWD/2020-21/CT-027/797 | Institute Works Dept. | Refractory Lab & LT-1 Works | 02/02/2021 | 19/02/2021 (01:00 Hrs) | |
| IIT(BHU/IWD/2020-21/CT-026/796 | Institute Works Dept. | False Ceiling & Paneling Works | 02/02/2021 | 19/02/2021 (01:00 Hrs) | |
| IIT(BHU/IWD/2020-21/CT-025/795 | Institute Works Dept. | Lab Renovation Works | 02/02/2021 | 19/02/2021 (01:00 Hrs) | |
| IIT(BHU/IWD/2020-21/CT-024/794 | Institute Works Dept. | Repair & Painting Works | 02/02/2021 | 19/02/2021 (01:00 Hrs) | |
| IIT(BHU/IWD/2020-21/CT-023/793 | Institute Works Dept. | Gymkhana Building Repair Works | 02/02/2021 | 19/02/2021 (01:00 Hrs) | |
| IIT(BHU/IWD/2020-21/CT-022/792 | Institute Works Dept. | Exterior Painting Works | 02/02/2021 | 19/02/2021 (01:00 Hrs) | |
| IIT(BHU/IWD/2020-21/CT-021/969 | Institute Works Dept. | Hostel Renovation (Rajputana) | 29/01/2021 | 18/02/2021 (15:00 Hrs) | Download BOQ |
| IIT(BHU/IWD/2020-21/CT-020/970 | Institute Works Dept. | Hostel Bathroom Renovation | 29/01/2021 | 18/02/2021 (15:00 Hrs) | Download BOQ |
| IIT(BHU/CSE/2020-21/SeedMoney-Tender/445 | Computer Science & Engineering | IoT Modules & Sensors Supply | 28/01/2021 | 19/02/2021 (05:00 PM) | Download BOQ |
| IIT(BHU/HS/2020-21/Tender/01 | Humanistic Studies | Air Quality Sensor Kit | 28/01/2021 | 17/02/2021 (04:00 PM) | Download BOQ |
| IIT(BHU/Physics/QTN/2020-21/149 | Physics | Radiation / Contamination Monitor | 21/01/2021 | 05/02/2021 | |
| IIT(BHU/Physics/QTN/2020-21/148 | Physics | Emission Spectra of Metals | 21/01/2021 | 05/02/2021 | |
| IIT(BHU/Physics/QTN/2020-21/147 | Physics | Mach Zehnder Interferometer | 21/01/2021 | 05/02/2021 | |
| IIT(BHU/ME/20-21/TD/03/APH | Mechanical Engineering | Spray Pyrolysis Equipment | 21/01/2021 | 11/02/2021 | Download BOQ |
| IIT(BHU/SMST/2020-21/CCC/311 | Materials Science | Closed Cycle Cryostat | 21/01/2021 | 10/02/2021 (04:00 PM) | Download BOQ |
| IIT(BHU/PH/FY/2020-21/QTN/AK/02 | Pharmaceutical Engg. | Signal Stain Boost IHC Reagent | 19/01/2021 | 28/01/2021 | |
| IIT(BHU/PH/FY/2020-21/QTN/AK/01 | Pharmaceutical Engg. | AMPure XP 60 mL | 19/01/2021 | 01/02/2021 (01:00 PM) | Corrigendum |
| IIT(BHU/SMST/2020-21/Electrospinning/296 | Materials Science | Electrospinning Instrument | 18/01/2021 | 04/02/2021 (04:00 PM) | Download BOQ |
| IIT(BHU/HS/2020-21/Tender/01 | Humanistic Studies | Vehicle Mountable Air Pollution Monitoring System | 15/01/2021 | 21/01/2021 (15:00 Hrs) | |
| IIT(BHU/CE/2020-21/1173 | Civil Engineering | Profoscope (Rebar Locator) | 15/01/2021 | 04/02/2021 (06:00 PM) | Annexures |
| IIT(BHU/SG/NCL/QTN/02 | Mining Engineering | Isograph Suite Software | 14/01/2021 | 29/01/2021 | |
| IIT(BHU/MET.AKM/CSIR/20-21/01 | Metallurgical Engineering | Corrosion Testing Equipment | 13/01/2021 | 02/02/2021 (03:00 PM) | Download BOQ |
| IIT(BHU/SBChE/Texture Analyzer/2020-21/T06/131 | Biochemical Engineering | Texture Analyzer | 13/01/2021 | 02/02/2021 (05:00 PM) | Download BOQ |
| IIT(BHU/BCE/PD/2020-21/001 | Biochemical Engineering | 3D Bioprinter | 13/01/2021 | 02/02/2021 (05:00 PM) | Download BOQ |
| IIT(BHU/Physics/RKS/QTN/2020-21/2 | Physics | Motorized Rotation Stage Mount | 13/01/2021 | 02/02/2021 | |
| IIT(BHU/Physics/RKS/QTN/2020-21/1 | Physics | He-Ne Laser | 13/01/2021 | 02/02/2021 | |
| IIT(BHU/IWD/2020-21/CT-019/877 | Institute Works Dept. | Repair & Painting Works (Limbdi Hostel) | 11/01/2021 | 02/02/2021 (15:00 Hrs) | Download BOQ |
| IIT(BHU/IWD/2020-21/CT-018/876 | Institute Works Dept. | Exterior Painting (GSC Hostel) | 11/01/2021 | 02/02/2021 (15:00 Hrs) | Download BOQ |
| IIT(BHU/IWD/2020-21/CT-017/859 | Institute Works Dept. | Door Shutter & Frame Work | 08/01/2021 | 20/01/2021 (03:00 PM) | Corrigendum |
| IIT(BHU/IWD/2020-21/CT-016/858 | Institute Works Dept. | Mosquito Net & Vitrified Tiles Work | 08/01/2021 | 20/01/2021 (03:00 PM) | Corrigendum |
| IIT(BHU/IWD/2020-21/CT-015/857 | Institute Works Dept. | Exterior Painting (Limbdi Hostel) | 08/01/2021 | 20/01/2021 (03:00 PM) | Corrigendum |
| IIT(BHU/min/QTN/3424 | Mining Engineering | Ultrasonic Pulse Velocity Tester | 07/01/2021 | 21/01/2021 | |
| IIT(BHU/min/QTN/3418 | Mining Engineering | Resistive Strain Gauge System | 07/01/2021 | 21/01/2021 | |
| IIT(BHU/SBChE/Bioelectrochemical Analyzer/2020-21/T05/119 | Biochemical Engineering | Bioelectrochemical Analyzer | 05/01/2021 | 26/01/2021 (03:00 PM) | Download BOQ |
| IIT(BHU/CHY/IIT(BHU)/2021/Rota/JK/01 | Chemistry | Rotational Instrument (Rota) | 04/01/2021 | 26/01/2021 (04:00 PM) |