Ref. No.Dept. NameDescriptionUpload DateClosing DateAttachments
IIT(BHU)/IWD/ET-44/2025-26/1890IWDSITC of Split air conditioners in the warden office of the C.V Rraman, Morvi, Dhanrajgiri, Rajputana, Limbdi, S.C Day, Vivekanand. Vishwakarma19/03/202601.04.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ENQ/55IWDCost of lifting and disposal18/03/202602.04.2026 (5:00 P.M.) 
IIT(BHU)/IWD/CT-60/2025-26/1674IWDRenovation Work for Training and placement cell, IIT(BHU), Varanasi12/03/202618.03.2026 (4:00 P.M.)Download BOQCorrigendumCorrigendum
IIT(BHU)/IWD/CT-56/2025-26/1642IWDProviding and fixing of sign board and nomenclature of GTFRC and New Faculty Apartment12/03/202618.03.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/IWD/ET-37/2025-26/1622IWDSupply, Installation and commissioning of Decorative Lighting illuminations work in the Various Locations of IIT(BHU), Varanasi12/03/202618.03.2026 (4:00 P.M.)Download BOQCorrigendum
GEM/2026/B/7327263Biomedical IoT Pro Kit with Raspberry Pi Module 4 GB RAM as per the technical specifications document uploaded in the bid document.11/03/202631-03-2026 18:00:00 
GEM/2026/B/7324798Biomedical ELECTROSPINNING03/03/202627-03-2026 14:00:00 
IIT(BHU)/IWD/CT-61/2025-26/1805IWDRenovation of different labs and chambers in department of Electrical Engineering03/03/202617.03.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-43/2025-26/18IWDRepair and Maintenance of air duct installed in the Aryabhatta Hostel03/03/202623.03.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/COE/MTD/2025-26/TD/007Centre of Excellence on Machine Tools DesignFabrication, assembling and installation of Ram Type Design for Heavy Duty CNC Horizontal Boring & Milling machine (Floor Type)02/03/202624.03.2026, (03:00 PMDownload BOQ
GEM/2026/B/7302796CIFArgon Ion Broad Beam Milling System02/03/202620-03-2026 18:00:00Notice Inviting Tender on GeM
IIT(BHU)/IWD/ET-35/2025-26/1608IWDElectrical Installation, wiring, light & fan point works in the Architecture planning and Design Dept27/02/202609.03.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/IWD/ET-34/2025-26/1607IWDElectrical repair/ refurbishment of internal wiring in office and meeting hall of TPO27/02/202609.03.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/IWD/ET-33/2025-26/1613IWDElectrical wiring, illumination, Power Point, Light & Fan point works in Dr. Samya Banerjee Lab, Dr. Indrajit Sinha Office and Dr. Sarvana Kumar Elangovan Office & Lab of Chemistry Department27/02/202609.03.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/COE/MTD/2025-26/TD/006Mechanical Fabrication, Assembling and Installation of CNC Heavy Duty Roll Grinding Machine with Wheel Head Traverse Type27/02/202621.03.2026, (03:00 PM)Download BOQ
IIT(BHU)/IWD/ET-41/2025-26/1788IWDElectrical wiring, illumination, power point, light and fan point works in the new section of IWD27/02/202619.03.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-42/2025-26/1787IWDElectrical wiring, illumination, power point, Light & Fan point works in Light weight structure of Structure Lab in Civil Engineering Department27/02/202619.03.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-53/2025-26/1621IWDP/F Aluminium partition and false ceiling work and making of working platform in laboratory - 9 in the Department of Pharmaceutical Engineering & Technology27/02/202609.03.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/IWD/CT-54/2025-26/1606IWDRenovation of two Washroom at second floor of the Faculty Building in the department of Mathematical Science27/02/202605.03.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/IWD/ET-39/2025-26/1644IWDElectrical wiring, illumination, power point, light & fan point works in Mezzanine floor of Surveying & Structure Lab of Civil Engg Dept24/02/202616.03.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-40/2025-26/1643IWDElectrical installation, wiring, illumination, power point, light & fan point works for sample preparation laboratory of NELMIF area in Metallurgical Engg. Department,24/02/202616.03.2026 (4:00 P.M.)Download BOQ
GEM/2026/B/7274038CIFPower Generator - DG Set (up to 900 KVA) (Q223/02/202603-03-2026 17:30:00GensetATC
IIT(BHU)/CCIS/2025-26/124CCISPROCUREMENT OF Graphic Processing Unit (GPU)18/02/202604.03.2026, (04.00 PM)Download BOQCorrigendum
IIT(BHU)/CCIS/2025-26/122CCISEXPRESSION OF INTEREST (EoI) For GPU-centric High-Performance Computing (HPC) cluster17/02/202609.03.2026, (04:00 PM)Corrigendum
GEM/2026/B/7228318Biomedical Chemical Vapour Deposition16/02/202606-03-2026 18:00:00 
IIT(BHU)/EE/RKSMAHAEV/25-26/OEMSChemistryOnline Electrochemical Mass Spectrometer13/02/202612.03.2026, (04:00 PM)Download BOQ
IIT(BHU)/Admin./2025-26/02Establishment SectionCleaning, Sanitation and Disposal of Solid Waste12/02/202606-03-2026 19:00:00Download BOQCorrigendum
IIT(BHU)/IWD/CT-44/2025-26/1578IWDRenovation of newly allocated space for Te-mobix project in Academic Building11/02/202618.02.2026 (4:00 P.M.)Download BOQCorrigendum
GEM/2026/B/7214114CIFSimultaneous TGA-DTA Modular System11/02/202602-03-2026 (20:00:00)Bid Document
GEM/2026/B/7214381CIFDynamic Light Scattering (DLS) system (Nano Particle Size, Zeta Potential and Concentration Analyzer)11/02/202602-03-2026 (20:00:00)Bid Document
GEM/2026/B/7215902CIFMultipurpose Powder X-Ray Diffractometer (PXRD)11/02/202603-03-2026 (12:00:00)Bid Document
GEM/2026/B/7216087CIFWavelength Dispersive X-Ray Fluorescence Spectrometer (WD-XRF)11/02/202603.03.2026 (13:00:00)Bid Document
IIT(BHU)/IWD/CT-60/2025-26/1674IWDRenovation Work for Training and placement cell10/02/202624.02.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/ECE/MT/DRDO/2025-26/Tender/271ElectronicsRack Server with 15 Thin Client Dual Processors including Dual GPU Card/Co-Processor10/02/202609.03.2026 (04:00 PM)Download BOQCorrigendum
IIT(BHU)/IWD/CT-37/2025-26/1652IWDRenovation of toilets, construction of shed and false ceiling in Chief Proctor Office08/02/202627.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-31/2025-26/1312IWDElectrical internal, wiring, illumination, power point, light & fan point works in the Laboratory-09 in Pharmaceutical engg06/02/202612.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-32/2025-26/1514IWDSupply, Installation, Testing and Commissioning of Electrical installation & Air Conditioner Works in the C.V Raman06/02/202619.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-38/2025-26/1648IWDEstimation for Electrical installation, wiring, illumination, PowerPoint, light & fan point works in the 10 No. of Quarters05/02/202624.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-36/2025-26/1647IWDSITC of supply and laying of UG cable from feeder pillar to Residential Quarters05/02/202624.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/EE/RKSMAHAEV/25-26/52ChemicalFluorescence Optical Microscope04/02/202602.03.2026, (04:00 PM)Download BOQCorrigendum
IIT(BHU)/IWD/CT-59/2025-26/1634IWDRenovation of Dean academic Chamber and office of DOAA04/02/202617.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-56/2025-26/1642IWDProviding and fixing of sign board and nomenclature of GTFRC and New Faculty Apartment04/02/202624.02.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/IWD/CT-59/2025-26/1634IWDRenovation of Dean academic Chamber and office of DOAA04/02/202617.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-55/2025-26/1633IWDRepair, maintenance of sanitary & plumbing fittings, repair of door, window and painting of Apartment, GRTA, old quarter of IIT(BHU), P/L paver block for parking02/02/202623.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-57/2025-26/1615IWDP/F of platform with granite top in lab of Dr. Saravana Kumar, Aluminium partition in Lab of Dr. Prabhat and Aluminium work in Lab of Dr. Arindam and Renovation work in the Lab02/02/202623.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-58/2025-26/1614IWDP/F Aluminium Partition and False Celling in Production Lab, Department of Mechanical Engineering02/02/202623.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-37/2025-26/1622IWDSupply, Installation and commissioning of Decorative Lighting illuminations work in the Various Locations02/02/202623.02.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/EE/RKSMAHAEV/25-26/45ChemicalAtomic Force Microscope31/01/202602.02.2026, (04:00 PM)Download BOQCorrigendum
GEM/2026/B/7165327Biomedical MASK ALIGNER30/01/202620-02-2026 17:00:00 
IIT(BHU)/IWD/CT-53/2025-26/1621IWDP/F Aluminium partition and false ceiling work and making of working platform in laboratory30/01/202613.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-33/2025-26/1613IWDElectrical wiring, illumination, Power Point, Light & Fan point works in Dr. Samya Banerjee Lab30/01/202613.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/PHY/RKS/QTN/25-26/213PhysicsLaser with Spatial Filter Assembly30/01/202621.02.2026, (04:00 PM)Download BOQ
IIT(BHU)/IWD/ET-34/2025-26/1607IWDElectrical repair/ refurbishment of internal wiring in office and meeting hall of TPO29/01/202612.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-54/2025-26/1606IWDRenovation of two Washroom at second floor of the Faculty Building in the department of Mathematical Science29/01/202612.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-35/2025-26/1608IWDElectrical Installation, wiring, light & fan point works in the Architecture planning and Design Dept29/01/202612.02.2026 (4:00 P.M.)Download BOQ
GEM/2026/B/7095367Biomedical MOTION CAPTURE SYSTEM WITH 8 OPTOELECTRONIC CAMERAS23/01/202612-02-2026 18:00:00 
IIT(BHU)/MET/DRDO/SDY/2025-26/02MetallurgicalSupply of Tungsten based Heavy Alloy Rods21/01/202610.02.2026, (04:00 PM)Download BOQCorrigendum
IIT(BHU)/IWD/CT-44/2025-26/1578IWDRenovation of newly allocated space for Te-mobix project in Academic Building20/01/202609.02.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/ET-31/2025-26/1312IWDElectrical internal, wiring, illumination, power point, light & fan point works in the Laboratory-0916/01/202630.01.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/IWD/CT-48/2025-26/1326IWDRemoving Building Vegetation / Weeds in all hostel ,Departments etc16/01/202630.01.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/IWD/CT-40/2025-26/1517IWDProviding and fixing tiles, painting false ceiling and Aluminium partition, Renovation of work shop16/01/202603.02.2026 (4:00 P.M.)Download BOQ
GEM/2026/B/7111110Biomedical THERMAL IMAGING15/01/202604-02-2026 13:00:00 
GEM/2026/B/7112387Biomedical 3D BIOPRINTER15/01/202604-02-2026 17:00:00 
GEM/2026/B/7108020Biomedical Physical Vapor Deposition System14/01/202603-02-2026 17:00:00 
IIT(BHU)/ME/PS/2025-26/TD/142MechanicalSupply of Combined Vacuum Inert Gas Atomization (VIGA) and Electrode Inert Gas Atomization (EIGA) System13/01/202602.02.2026, (04:00 PM)Download BOQ
IIT(BHU)/ECE/2025-26/Cleanroom/01ElectronicsEXPRESSION OF INTEREST (EoI) For Turnkey Design, Supply, Installation & Commissioning of Semiconductor Processing Cleanroom12/01/202610.02.2026, (04:00 PM)Corrigendum
IIT(BHU)/CIF/2025-26/MTMSCIFSupply, Installation and Commissioning of Magneto Transport Measurement System09/01/202620/01/2026, (04:00 PM)Download BOQ
IIT(BHU)/IWD/ET-32/2025-26/1514IWDSupply, Installation, Testing and Commissioning of Electrical installation & Air Conditioner Works in the C.V Rraman, Morvi, Dhanrajgiri, Rajputana, Limbdi, S.C Day, Vivekanand09/01/202630.01.2026 (4:00 P.M.)Download BOQCorrigendum
IIT(BHU)/COE/MTD/2025-26/TD/005Centre of Excellence on Machine Tools DesignNon-Contact Metrology System08/01/202624.01.2026, (03:00 PM)Download BOQ
GEM/2026/B/7064171Biomedical RHEOMETER05/01/202627-01-2026 11:00:00 
IIT(BHU)/IWD/CT-20/2025-26/1069IWDRenovation work in Room no G-15, School of Material Science and Technology05/01/202608.01.2026 (4:00 P.M.)Download BOQ
IIT(BHU)/Civil/2025-26/5232CivilComputer-controlled fluorescence spectrometer that is capable of multi collection modes including fluorescence, phosphorescence, chemiluminescence and bioluminescence.01/01/202621.01.2026, (04:00 PM)Download BOQ
GEM/2025/B/6990543Biomedical Corrosion Test Kit01/01/202620-01-2026 18:00:00 
IIT(BHU)/IWD/CT-32/2025-26/1054IWDInterconnection of one tubewell with the connection of all Hostel IIT(BHU)31/12/202506.01.2026 (4:00 P.M.)Download BOQ