Dr. Nawal Kishore

Associate Professor
Department of Mining Engineering
Email:
nawalkishore.min@iitbhu.ac.in
Phone(s):
9713110209
Area of Interest:
Mine Planning, Surface Mining Operation, Mine Closure Planning

Examination

Univ./ Board

Year

% of Marks

Div.

Subjects

B.Sc. Engg.

BIT, Sindri, Dhanbad

1995

64.7%

I

Mining Engineering

M.Tech.

IIT BHU, Varanasi

1999

73.8%

I

Mining Engineering

Ph.D.

IIT BHU, Varanasi

2004

    -

-

Mining Engineering

 

Organization | Designation | From | To

Dept. of Mining Engg., IIT (BHU) | Associate Professor | 26/02/2026 | Till now

Dept. of Mining Engg., IIT (BHU) | Assistant Professor | 21/12/2015 | 26/02/2026

Dept. of Mining Engg., NIT Raipur | Assistant Professor | 20/05/2009 | 19/12/2015

Gujarat Mineral Development Corp. Ltd. (Undertaking, Govt. of Gujarat) | Senior Manager (Mines) | 26/10/2007 | 16/05/2009

Monnet Ispat & Energy Ltd. | Assistant Manager (Mines) | 18/12/2006 | 18/10/2007

Gulf Oil Corp. Ltd. (GOCL) (Formerly IDL) | Assistant Manager (Mines) | 05/05/2004 | 17/12/2006

Institute of Technology, B.H.U., Varanasi | Senior Research Fellow | 02/05/2000 | 30/04/2004

Total post Ph.D. experiences are 25 years 9 Months in which teaching experiences is almost 16 years

  1. Dr Rajendra Prasad Memorial Prize for Technical Paper, The Institution of Engineers (India), 2025
  2. INSO (Lifetime Achievement Award – International Research Award), 2022
  3. Shrimati Saroma Sanyal Memorial Prize for Technical Paper, The Institution of Engineers (India), 2022
  4. Acquired First Class Mine Manager’s Certificate under MMR (R) & Mines Act (1952)

Citation Details
Total = 487, H Index = 9, I-10 Index = 9 

  Publication in National/ International Journals - 52

  Publication in National/ International Seminars and Conferences- 21

   List of Publications in National/ International Journals as follows:

SI No. | Author(s) | Month & Year | Title | Complete Reference of Journal | Impact Factor | Citations

1 | Nilesh Pratap Singh; Vikram Seervi; Nawal Kishore; Amit Kumar Verma | 02-2023 | Impact of Surface Miner Utilisation on Production Efficiency in Opencast Coal Mines using Least Squares Method: A Case Study | Journal of The Institution of Engineers (India): Series D, Springer India, Vol.104(1) (Scopus Indexed) | 1.423 | NIL

2 | Ali Amaan Md Ajaj Ansari; Vikram Seervi; Nawal Kishore; Nilesh Pratap Singh | 02-2023 | An Investigation into the Effect of Rain on Fragmented Coal: A Case Study | Journal of The Institution of Engineers (India): Series D, Springer India, Vol.104(1) (Scopus Indexed) | 1.423 | NIL

3 | Nilesh Pratap Singh; Vikram Seervi; Sonu Meena; Aarif Jamal; Nawal Kishore | 01-2023 | Development of Multiple Regression Model for Assessment of Coal Calorific Value in Indian Opencast Mines | Journal of The Institution of Engineers (India): Series D, Springer India (Scopus Indexed) | 1.423 | NIL

4 | Nilesh Pratap Singh; Vikram Seervi; Nawal Kishore; Amit Kumar Verma | 01-2023 | An Investigation into Statistical Correlations between Coal Production and Key Productivity Indicators of Surface Miners in Indian Opencast Mines | Mining, Metallurgy & Exploration, Springer Journals (SCI Journal) | 1.71 | NIL

5 | Vijayendra Pratap Dheeraj; C.S. Singh; Nawal Kishore; Ashwani Kumar Sonkar | 10-2022 | Heavy Metal Pollution Indices Used to Assess the Quality of Groundwater in Korba Coalfield (KCF) Region, Chhattisgarh, India | Journal of the Geological Society of India (SCI Journal) | 1.459 | —

6 | Vikram Seervi; Nilesh Pratap Singh; Nawal Kishore; Rajeev Verma | 09-2022 | Breakdown and Productivity Prediction of Dragline using Machine Learning Algorithms | Journal of Mines, Metals and Fuels, Vol.70(9), September 2022, pp.476–483 | 0.07 | —

7 | Vikram Seervi; Nilesh Pratap Singh; Nawal Kishore; Amit Kumar Verma | 08-2022 | Critical Analysis of Tandem Dragline Performance in Open Cast Coal Mines – A Case Study | Journal of The Institution of Engineers (India): Series D, Springer India (Scopus Indexed) | 1.423 | —

8 | Dharmendra Kumar Singh; Nawal Kishore; Birendra Pratap; Vijayendra Pratap Dheeraj | 06-2022 | Geoelectrical Sounding for Aquifer Characterization in and around Nandgao, Majan, Singrauli District, Madhya Pradesh, India | Indian Journal of Environmental Protection (Scopus Indexed) | 0.20 | —

9 | Vikram Seervi; Nawal Kishore; Amit Kumar Verma | 03-2022 | Selection of Mode of Tandem Dragline Operations using 3D Computer Graphics Balancing Diagram: A Case Study | Journal of Mines, Metals & Fuels, Vol.70(3), March 2022, pp.112–123 (Scopus Indexed) | 0.07 | —

10 | Dharmendra Kumar Singh; Nawal Kishore | 02-2022 | Geoelectrical Sounding to Identify Sub-surface and Groundwater State at Village Banauli, Singrauli District, Madhya Pradesh, India | Nature Environment and Pollution Technology, Vol.21(4), 2022 (Scopus Indexed) | 0.42 | —

11 | Gagan Gupta; Sanjay K. Sharma; G.S.P. Singh; Nawal Kishore | 08-2021 | Numerical Modelling-Based Stability Analysis of Waste Dump Slope Structures in Open-Pit Mines – A Review | Journal of The Institution of Engineers (India): Series D, Springer, Vol.102(4) | 1.42 | —

12 | Anand Kumar; Pusker Singh; Sanjay Kumar Sharma; Nawal Kishore; C.S. Singh | 07-2021 | Quantitative Assessment of BIGV and Structural Response based on Velocity and Frequency around an Opencast Mine | Current Science, Vol.121(2), 25 July 2021, pp.275–285 (SCI Indexed) | 1.102 | —

13 | Anand Kumar; Sanjay Kumar Sharma; Nawal Kishore | 07-2021 | Prediction of Blast-Induced Ground Vibration using Multivariate Regression Analysis in an Opencast Mine | Journal of Mines, Metals & Fuels, Vol.69(7), pp.216–224 | H-Index 11, IF 0.07 | —

14 | Shah Izhar Ahmed; Nawal Kishore; D.C. Jhariya | 05-2021 | Evaluation of Groundwater Quality in Jampali Coal Mine, Raigarh | Environmental Quality Management, Wiley Publication | 0.961 | NIL

15 | Anand Kumar; Sanjay Kumar Sharma; Nawal Kishore; C.S. Singh | 01-2020 | Assessment of Blast-Induced Ground Vibration Frequency in Opencast Coal Mine: A Multivariate Statistical Regression Model | International Journal of Recent Technology and Engineering (IJRTE), Vol.8(5) (Scopus Indexed) | 1.0 | NIL

16 | D.C. Jharia; T. Kumar; H.K. Pandey; Dharmendra Kumar; Nawal Kishore | 10-2019 | Assessment of Groundwater Vulnerability to Pollution using Modified DRASTIC Model and AHP | Environmental Earth Sciences, Vol.78 (SCI Journal) | 1.435 | 17

17 | Patel R.K.; Alok; N. Kishore | 09-2017 | Assessment of Comparative Operating Cost of New Dragline vs Outlived Dragline | Asian Journal of Science and Technology, Sept. 2017, pp.5511–5516 (SCImago) | H-Index 14, SJR 0.146 | NIL

18 | Patel R.K.; Alok; N. Kishore | 08-2017 | Assessment of Comparative Cost of Continuous Surface Miner vs Conventional Drilling & Blasting | Minetech (CMPDIL), Vol.38(4), pp.27–34 (Non-Indexed) | — | NIL

19 | Alok; Patel R.K.; Rao M. Mutyal; N. Kishore | 07-2017 | Cost and Economics Analysis of Continuous Surface Miner in Opencast Coal Mines – A Case Study | Minetech (CMPDIL), Vol.38(3), pp.28–34 (Non-Indexed) | — | NIL

20 | Dipanjan Das; M. Mutyal Rao; N. Kishore | 04-2017 | Planning of a Surface Miner in a Mega Opencast Project – A Case Study | Minetech (CMPDIL), Vol.38(2), pp.3–14 (Non-Indexed) | — | NIL

21 | P.Y. Dhekne; N. Kishore; Romil Mishra | 01-2017 | Minimisation of Surface Mining Costs using Artificial Neural Network | IJRCMCE, Vol.4(1), pp.156–160 (Non-Indexed) | — | NIL

22 | D.C. Jharia; T. Kumar; Gobi Nath M.; P. Diwan; N. Kishore | 10-2016 | Assessment of Groundwater Potential Zone using Remote Sensing, GIS and MCDA Techniques | Journal of the Geological Society of India, Vol.88(4), pp.481–492 (SCI Journal) | 0.547 | 57

23 | Wadhwani H.; Lokhande R.D.; N. Kishore | 07-2015 | Highwall Mining | Minetech (CMPDIL), Vol.36(3) (Non-Indexed) | — | NIL

24 | Trivedi R.; N. Kishore; D. Mishra | 08-2013 | Cost Analysis of Closure of an Opencast Limestone Mine | Indian Journal of Environmental Protection, Vol.33(8), pp.617–628 (SCI Journal) | H-Index 17 | NIL

25 | Dewangan P.; Pradhan; N. Kishore | 04-2013 | Slope Stability Radar System for Monitoring Open Pit Slopes | Indian Mining & Engineering Journal, Vol.52(4), pp.18–21 (UGC Approved) | — | NIL

26 | Kishore N.; Dewangan P.; Dhekne P.Y. | 03-2012 | Method of Drawing Job Balancing Diagram | Indian Mining & Engineering Journal, Vol.51(3), pp.18–21 (UGC Approved) | — | NIL

27 | Dewangan P.; Pradhan; N. Kishore | 01-2012 | Use of Coal Combustion Residues in Mining Industry for Sustainable Development | Indian Mining & Engineering Journal, Vol.51(1), pp.24–31 (UGC Approved) | — | NIL

28 | Dewangan P.; Pradhan; N. Kishore | 08-2010 | Utilization of Fly Ash as Structural Fill Material for Safe Mining | Indian Mining & Engineering Journal, Vol.49(8), pp.134–139 (UGC Approved) | — | 10

29 | Kishore N.; Dewangan P. | 08-2010 | Estimation of Operating Cost of Dragline in Various Modes | Indian Mining & Engineering Journal, Vol.49(8), pp.131–133 (UGC Approved) | — | NIL

30 | Kishore N.; Jaiswal A. | 07-2005 | Application of Computer Software for Dragline Balancing Diagram | Minetech (CMPDIL), Vol.26(3), pp.13–19 (Non-Indexed) | — | NIL

31 | Kishore N.; Jaiswal A. | 10-2004 | Design and Planning of Dragline Pits – Considerations | Mining Engineers Journal, Hyderabad, Vol.5(10), pp.26–29 (Peer-reviewed) | — | NIL

32 | Rai P.; Kishore N.; Nath R. | 03-2001 | Increasing Dragline Output – Cut Width Analysis in Tandem Operation | World Mining Equipment (UK), Vol.25(3), pp.48–52 (Non-Indexed) | — | 3

33 | Rai P.; Kishore N.; Nath R. | 08-2000 | Influence of Overburden Thickness on Dragline Performance | IEI Series D, Vol.81, pp.10–13 (SCImago) | 0.84 | NIL

34 | Rai P.; Kishore N.; Nath R. | 10-1999 | Effects of Cut Width on Dragline Performance – Case Study | Coal International Mining & Quarry World (UK), Vol.247(6), pp.216–220 (Non-Indexed) | — | NIL

 

Publications in Conference/Seminars (National and International) proceedings

SI No. | Author(s) | Month & Year | Title | Complete Reference of Conference

1 | Vikram Seervi; Nawal Kishore | 12-2021 | Application of 3-Dimensional Balancing Diagram for Effective Draglines Operating in Tandem | 4th International Conference on Opencast Mining Technology & Sustainability (ICOMS-2021), 13–14 December 2021, Singrauli, M.P.

2 | Dharmendra Kumar Singh; Nawal Kishore; Birendra Pratap; Ashwani Kumar Sonkar; Vijayendra Pratap Dheeraj | 12-2021 | Geoelectrical Sounding for Groundwater Exploration around Nigahi Colony, Singrauli District, Madhya Pradesh, India | 4th International Conference on Opencast Mining Technology & Sustainability (ICOMS-2021), 13–14 December 2021, Singrauli, M.P.

3 | Dharmendra Kumar Singh; Dr. Nawal Kishore | 01-2021 | Numerical Approach to Solve Approximation of Zoeppritz Equation using Least Square Method and Genetic Algorithm | 3rd International Conference on Opencast Mining Technology & Sustainability (ICOMS-2021), 22–23 January 2021, Singrauli, M.P.

4 | Dharmendra Kumar Singh; Nawal Kishore; Vijayendra Pratap Dheeraj | 02-2021 | Use of Genetic Algorithm and Least Square Method for Inversion of Aki-Richard and Yanghua Wang Approximation of Zoeppritz Equation | International Conference on Recent Advances in Science & Engineering (RASE 2K21), Rajkiya Engineering College, Sonbhadra

5 | Kishore N; A. Agrawal | 02-2020 | Mine Closure Planning Vis-à-vis Sustainable Development | Recent Practices and Advancement in Mineral Industry (RPAMI), 21–22 February 2020, VNIT Nagpur

6 | A. Agrawal; Kishore N | 12-2019 | Comparison of Mine Closure Cost Estimation Techniques Globally | IInd International Conference on Opencast Mining Technology & Sustainability (ICOMS-2019), 13–14 December 2019, Singrauli, M.P.

7 | Sandeep Kumar Sahoo; Roshan Kumar Patel; GyanWrat; Nawal Kishore | 02-2018 | Effect of Cutting Operation of Picks on Reliability of Surface Miner | Third National Conference on Mining Equipment: New Technologies, Challenges & Applications (MENTCA-18), 9–10 February 2018, IIT-ISM Dhanbad

8 | Kishore N | 12-2017 | Determination of Annual Production Capacity of Different Draglines | Advances in Mine Environment, Geotechniques and Ground Control (AMEGGC-2017), NIT Raipur, Chhattisgarh

9 | Patel R.K.; Kishore N | 12-2017 | Cost Analysis and Estimation of Continuous Surface Miner at Different Geo-Mining Conditions in Indian Coal Mines | Advances in Mine Environment, Geotechniques and Ground Control (AMEGGC-2017), NIT Raipur, Chhattisgarh

10 | G. Gupta; Sanjay K. Sharma; G.S.P. Singh; T. Verma; N. Kishore | 12-2017 | Advances in Mine Environment, Geotechniques and Ground Control | Advances in Mine Environment, Geotechniques and Ground Control (AMEGGC-2017), NIT Raipur, Chhattisgarh

11 | Patel R.K.; Kishore N | 09-2017 | Continuous Surface Miner: An Environment-Friendly Prospect in Indian Coal Mines | Current Practices in Mining and Allied Industries (CPMAI-2017), National Conference, GCE Keonjhar, Odisha

12 | Singh N.P.; Jamal A.; Singh R.P.; Kishore N | 01-2017 | Impact of Coal Quality on Longevity of Picks of Surface Miner – A Case Study | DEEP16 International Conference, 24–26 January 2017, IIT Kharagpur

13 | Rao M. Mutyal; Patel R.K.; Kishore N | 01-2017 | Planning and Deployment of Continuous Surface Miner at Moderate Depth Opencast Mine – A Blast-Free Excavation Technique | DEEP16 International Conference, 24–26 January 2017, IIT Kharagpur

14 | Jain A.; Rai R.; Kishore N.; Jaiswal A | 02-2016 | Applicability of Surface Miner in Opencast Mines | Seminar on Recent Practices and Innovations in Mining Industry (RPIMI-2016), 19–20 February 2016

15 | Verma L.K.; Kishore N | 02-2016 | Predicting Dangerous Seismic Events in Active Coal Mines through Data Mining | Seminar on Recent Practices and Innovations in Mining Industry (RPIMI-2016), 19–20 February 2016, NIT Raipur

16 | Kishore N.; Dewangan P | 03-2015 | Occupational Health Surveillance in Indian Mines | 3rd International Conference on Technology Management (MiCTM-2015), 25–26 March 2015, Manipal University, Dubai, UAE

17 | Dewangan P.; Pradhan M.; Kishore N | 03-2014 | Opencast Coal Mining Technology in India – Present Scenario and Challenges Ahead | National Seminar on Problems in Mining Industry and Technological Advancements, 7–8 March 2014, Udaipur

18 | Dewangan P.; Pradhan M.; Kishore N | 05-2013 | Advancement in Geotechnical Instrumentation for Monitoring Unstable Open Pit Mine Slopes: An Overview | Clean Mining Technology MINETECH’13, 3–4 May 2013, Bhubaneswar

19 | Kishore N.; Dewangan P | 05-2010 | Estimation of Operating Cost of Dragline in Various Modes of Operation | Mining Technology for Sustainable Development, MineTECH’10, Bhubaneswar

 

Ph.D. Awarded Research Scholars and currently under supervision

SI No. | Name of Student(s) | Date of Registration | Date of Submission | Completion Status | Institute | Title of Thesis | Guide/Co-guide

1 | Prasant Kumar Singh | 29-07-2019 | Ongoing | In Progress | IIT (BHU), Varanasi | Assessment of the Impact of Opencast Mining on Groundwater | Guide

2 | Shah Izhar Ahmed | 19-07-2016 | 26-12-2023 | 2024 | IIT (BHU), Varanasi | Impact of Mining on Ground Water Quality in and around Jampali Opencast Coal Mine | Guide

3 | Nilesh Pratap Singh | 22-07-2017 | Degree Awarded | Degree Awarded | IIT (BHU), Varanasi | Productivity Analysis of Continuous Surface Miner in Different Geo-mining Conditions | Guide

4 | Vikram Seervi | 26-12-2017 | Degree Awarded | 2022 | IIT (BHU), Varanasi | Three-Dimensional Balancing Diagram for Planning of Tandem Dragline Operations in Large Opencast Mines | Guide

5 | Dharmendra Kumar Singh | 28-12-2015 | Degree Awarded | 2022 | IIT (BHU), Varanasi | Ground Water Exploration using Geophysical Method in Mining Area | Guide

6 | Anand Kumar | 23-07-2014 | Degree Awarded | 2021 | IIT (BHU), Varanasi | A Study of the Effects of Blasting Vibrations on Nearby Structures | Co-guide

On-going thesis

7 | Jatin Mahour | 20-07-2025 | Pursuing Ph.D.| Ongoing | IIT (BHU), Varanasi | Topic not decided Supervisor 

8 | Vivek Kumar | 27-12-2025 | Pursuing Ph.D.| Ongoing | IIT (BHU), Varanasi | Topic not decided Supervisor 

 

   2.Twenty Five  M.Tech. Thesis has been supervised and degree awarded and presently two more students are doing their research work under my supervision.

SI No. | Name of The Student(s) | Date of Registration | Date of Submission | Year of Completion / In Progress | Name of Institute | Title of Thesis | Guide or Co-guide
1 | Alok | 20-07-2015 | 19-07-2017 | 2017 | IIT BHU Varanasi | Cost and Economic Analysis of Continuous Surface Miner in Indian Coal Mines – A Case Study | Guide
2 | Dipanjan Das | 20-07-2015 | 19-07-2017 | 2017 | IIT BHU Varanasi | Planning of Surface Miner in a Mega Opencast Project | Guide
3 | K Sampath Raj | 23-07-2012 | 07-06-2017 | 2017 | IIT BHU Varanasi | Optimization of Production in Dragline Operations Using Overall Equipment Efficiency | Co-guide
4 | Rajendra Prasad | 28-07-2016 | 17-05-2018 | 2018 | IIT BHU Varanasi | Open Pit Optimization and Design by Using SURPAC and WHITTLE Software | Guide
5 | Abhash Shikhar | 26-07-2013 | 17-05-2018 | 2018 | IIT BHU Varanasi | Numerical Modelling of Waste Dump – A Case Study | Guide
6 | Bodda Prabhu Prem Kumar | 28-07-2014 | 03-06-2019 | 2019 | IIT BHU Varanasi | Study of Fly Ash Utilization in Overburden Dumps | Guide
7 | Narendra Singh Dhaked | 23-07-2017 | 06-07-2019 | 2019 | IIT BHU Varanasi | Planning of Drainage System in Opencast Mines | Guide
8 | Dhananjay Kumar | 23-07-2017 | 06-07-2019 | 2019 | IIT BHU Varanasi | Estimation of Threshold Limit Value of Dump Slope Stability in Opencast Mines | Guide
9 | Ajeet Kumar Tripathi | 29-07-2018 | 30-05-2020 | 2020 | IIT BHU Varanasi | Relationship of Working Conditions and Individual Characteristics to Occupational Accidents | Guide
10 | Pankaj Kumawat | 29-07-2018 | 10-06-2020 | 2020 | IIT BHU Varanasi | Assessment of Performance of Heavy Earth Moving Machinery in Opencast Coal Mine – A Case Study | Guide
11 | Abhishek Kumar Uttam | 29-07-2020 | 06-06-2020 | 2020 | IIT BHU Varanasi | Planning of Drainage System in Opencast Mining Project | Co-guide
12 | Abhishek Singh | 26-07-2015 | 30-05-2020 | 2020 | IIT BHU Varanasi | Design Pattern and Stability of Contiguous Seamanalysis | Guide
13 | Vinod Rajak | 26-07-2015 | 30-05-2020 | 2020 | IIT BHU Varanasi | Mixing of Fly Ash with Overburden to Enhance Slope Stability of Overburden Dump | Guide
14 | Vishal Kumar Singh | 25-07-2019 | 30-06-2021 | 2021 | IIT BHU Varanasi | EIA Enhancement of Production of an Opencast Mine – A Case Study | Guide
15 | Gaje Deepak | 25-07-2019 | 30-06-2021 | 2021 | IIT BHU Varanasi | Assessment of Cost and Economics of Mine Closure in Opencast Mine | Guide
16 | Pravin Kumar Prajapati | 25-07-2019 | 30-06-2021 | 2021 | IIT BHU Varanasi | Assessment of Damage Criteria due to Blasting in Opencast Mines | Guide
17 | Aditya Patra | 23-07-2016 | 30-06-2021 | 2021 | IIT BHU Varanasi | Development of a Computer Graphics Package to Construct 3-Dimensional Balancing Diagrams and Optimize Operation of Tandem Draglines | Guide
18 | Vijay Utkarsh Pratap Singh | 23-07-2016 | 30-06-2021 | 2021 | IIT BHU Varanasi | Optimization of Blasting Parameters in Opencast Mines | Guide
19 | Ankit Yadav | 27-07-2017 | 07-07-2022 | 2022 | IIT BHU Varanasi | Breakdown and Productivity Prediction of Dragline Operations Using Machine Learning | Guide
20 | Bavandlapally Sandeep | 26-07-2020 | 27-06-2022 | 2022 | IIT BHU Varanasi | Assessment of EIA for Opencast Coal Mine with Enhancing Annual Production – A Case Study | Guide
21 | Aditya Yadav | — | — | 2024–2025 | IIT BHU Varanasi | Development of the Methodology for the Assessment of Mine Closure Cost | Sup: Nawal Kishore (Co-Sup: Industry)
22 | Aditya Nagar | — | — | 2024–2025 | IIT BHU Varanasi | Effective Utilization of Mine Water in the Vicinity of Mine | Sup: Nawal Kishore
23 | Harsh Raj | — | — | 2024–2025 | IIT BHU Varanasi | Assessment of Air Quality Index Nearby Opencast Mines | Sup: Nawal Kishore
24 | Anushka Shah | — | — | 2024–2025 | IIT BHU Varanasi | Assessment of the Cost of Water Drainage in Opencast Coal Mine | Sup: Nawal Kishore
25 | N. Jaya Avinash Yadav | — | — | 2024–2025 | IIT BHU Varanasi | Fragmentation and Ground Vibration Analysis in Blast Holes Featuring Air Space: A Case Study | Sup: Nawal Kishore 
26 | Udatha Subhash | — | — | 2024–2025 | IIT BHU Varanasi | Assessment of Water and Soil Quality in the Vicinity of Iron Ore Opencast Mine: A Case Study | Sup: Nawal Kishore 

 

 

More than fifty R&D Consultancy Projects have been completed and two more is ongoing

Sl. No. | Title of Project | Funding Agency | Status
1 | Scientific study in compliance of CMR 2017 (106)(2) to opencast mine of CESC, Asansol | CESC Kolkata | Completed
2 | Scientific study on blasting pattern in OB bench of Dipka Expansion project of Dipka area, SECL to prevent cracks in nearby villages | South Eastern Coalfields Limited | Completed
3 | Scientific study for preparation and formulation of strata control and monitoring plan as per Reg. 123 of CMR 2017 for Baherabandh UG mine, Hasdeo area | South Eastern Coalfields Limited | Completed
4 | Scientific study for preparation and formulation of strata control and monitoring plan in No. 1 seam of Bartunga Hill mine as per Reg. 123 of CMR 2017 | South Eastern Coalfields Limited | Completed
5 | Scientific study and preparation of report of Chhal, Baroud, Jampali, GP IV/2&3, GP IV/1 and Bijari OCP of Raigarh area in compliance of CMR 106(2) | South Eastern Coalfields Limited | Completed
6 | Scientific Study for Dipka OCP to determine threshold limit during slope stability monitoring with Radar | South Eastern Coalfields Limited | Completed
7 | Scientific Study for Kushmunda OCP to determine threshold limit during slope stability monitoring with Radar | South Eastern Coalfields Limited | Completed
8 | Determination/Formulation of SOR for outsourcing works of OB removal, coal loading, transportation, drilling, crushing, surface miner extraction etc. in SECL | South Eastern Coalfields Limited | Completed
9 | Scientific study in compliance of CMR 2017 (106)(2) of Madhaipur OCP, ECL | Eastern Coalfields Limited | Completed
10 | Scientific study for design of blast pattern and ground vibration monitoring at Billi Markundi Stone Mine, Sonbhadra | Krishna Mining Works | Completed
11 | Consultancy study of slope stability and internal/external dump analysis of 5 OCPs of NCL | Northern Coalfields Limited | Completed
12 | Scientific study for strata control and monitoring plan for Bijuri UG mine as per CMR 123 | South Eastern Coalfields Limited | Completed
13 | Scientific study for strata control and monitoring plan for Jhiria UG mine | South Eastern Coalfields Limited | Completed
14 | Scientific study of slope stability of Parsa East and Kanta Basan OC mine | Adani | Completed
15 | Technical study for fly ash utilization with OB and backfilling in Jampali OCP | South Eastern Coalfields Limited | Completed
16 | Scientific study at Hirakhand Bundia mine, MCL | Mahanadi Coalfields Limited | Completed
17 | Study of crack development near western quarry and Gandhi Sagar dump in Manikpur colliery | South Eastern Coalfields Limited | Completed
18 | Scientific Study for Gevra OCP slope stability monitoring using Radar | South Eastern Coalfields Limited | Completed
19 | Scientific study of Gevra OCP planning, design and slope monitoring | South Eastern Coalfields Limited | Completed
20 | Strata Control and Monitoring Plan for Orient Colliery Mine #3, MCL | Mahanadi Coalfields Limited | Completed
21 | Review/Vetting and formulation of new SOR for outsourcing works in SECL | South Eastern Coalfields Limited | Completed
22 | Study for ultimate pit slope design at Pindra colliery, CCL | Central Coalfields Limited | Completed
23 | Study of stability of parting between G-III seams in Bagdewa UG mine | South Eastern Coalfields Limited | Completed
24 | SCAMP for depillaring panel 57N, NCPH Colliery R-6 mine | South Eastern Coalfields Limited | Completed
25 | Stability study of depillared area for surface coal gasification plant at Bhatgaon | South Eastern Coalfields Limited | Completed
26 | Scientific study of Manikpur OCP as per DGMS circular 03 of 2020 | South Eastern Coalfields Limited | Completed
27 | Study of extraction of Seam IV & V pillars in Kurasia Colliery | South Eastern Coalfields Limited | Completed
28 | Scientific study of slope cracks and bench stability at Singhori OC mine | Western Coalfields Limited | Completed
29 | Method of working study at Amgaon OCP | South Eastern Coalfields Limited | Completed
30 | Dump slope stability and controlled blasting study | EMIL Mines & Mineral Resources Ltd | Completed
31 | Safety audit of Khanak mines, HSIIDC | HSIIDC Haryana | Completed
32 | Physico-mechanical properties study of coal & rock samples | JMS Mining Pvt Ltd | Completed
33 | Borehole rock property study in Makri-Barka East & Inguri-A block | CMPDIL RI-6 | Completed
34 | Techno-economic study of Raniganj seams mining (UG + OC optimization) | MP Natural Resources Pvt Ltd (Adani Group) | Completed
35 | Conversion study of Mahamaya UG to OC mine | South Eastern Coalfields Limited | Completed
36 | Safety audit of Khanak mines, HSIIDC (second record) | HSIIDC Haryana | Completed

 

Sl. No.Name of BodyStatus of Membership
1International Society of Rock Mechanics (ISRM), IndiaLife member
2Mining Geological and Metallurgical Society of India (MGMI)Life member
3Indian Meteorological Society, New Delhi, India (IMS).Life member
4Mining Engineering Association Of India(MEAI)Life member
5Indian Geotechnical Society, New DelhiLife member
6Mining Engineering Society, IIT BHU, Varanasi.Life member

 

Sl. No.Year PlaceDate and DurationTitle of STC(CEP)
12016IIT(BHU)Sept, 12-17,2016 / Six DaysCoal beneficiation  (CB-2016)
22017IIT(BHU)July 24-29,2017 / Six DaysCoal quality management & Utilization (CQMU-2017)
32017IIT(BHU)Oct, 9-14, 2017 / Six daysEnvironmental Management In Mining And Allied Industries(EMMAI-2017)

 

  1. Convener DUGC, Mining Engineering Department
  2. Departmental Representative, Training & Placement Cell, IIT(BHU)
  3. Member Secretary, Departmental Condemnation Committee,IIT(BHU)
  4. Member Secretary, Departmental Purchase Committee, IIT(BHU)
  5. Member, DUGC/ DPGC

1. 26 Practice Sets for Competitive Mining Exams,

Authors-NawalKishore, Roshan Kumar Patel and Sanjay
Kumar Sharma

Denett & Co.Nagpur Central Techno Publishers

ISBN 978-81-933566-7-8 , Year-2017

2. Recent Methods and Techniques in Surface Mining

Authors-NawalKishore, Roshan Kumar Patel

     
Denett & Co.Nagpur Central Techno Publishers     
ISBN 978-81-933566-7-8 , Year-2022