Dr. Nawal Kishore

Assistant Professor
Department/School/Unit Name
Department of Mining Engineering IIT BHU
Phone No(s): 9713110209
Email: nawalkishore.min@iitbhu.ac.in
Area of Interest: Mine Planning, Surface Mining Operation
Examination Univ./ Board Year % of Marks Div. Subjects
B.Sc. Engg. BIT,Sindri,Dhanbad 1995 64.7% I Mining Engineering
M.Tech. ITBHU, Varanasi 1999 73.8% I Mining Engineering
Ph.D. ITBHU, Varanasi 2004 - - Mining Engineering

 

Organization Designation From To
Dept. of Mining Engg. IIT(BHU) Assistant Professor Grade-II 21/12/2015 Till Date
Dept. of Mining Engg. N.I.T, Raipur Assistant Professor Grade-I 20/05/2009 19/12/2015
Gujarat Mineral Development Crop. LTD.(Undertaking , Govt. of Gujarat) Senior Manager(Mines) 26/10/2007 16/05/2009
Monnet Ispat & Energy Ltd. Assistant Manager (Mines) 18/12/2006 18/10/2007
Gulf Oil Corp. Ltd. (GOCL)
( Formerly IDL)
Assistant Manager (Mines) 05/05/2004 17/12/2006
Institute of Technology, B.H.U. Varanasi. Senior Research Fellow 02/05/2000 30/04/2004

Total post Ph.D. experiences is 19 years  in which teaching experiences is almost 14 years

  1. Acquired Ist Class Mine & Manager’s Certificate under MMR (R) & Mines Act (1952)

(It is the highest professional recognition to mining engineers given by Ministry of Employment & Welfare, DGMS after clearing written and viva-voice examination)

  1. Acquired IInd Class Mines Manager’s certificate under CMR & Mines Act(1952)
  2. Senior Research Fellowship by UGC for pursuing PhD at Mining Engg. Dept., IT-BHU
  3. M.Tech. Fellowship by UGC, New Delhi
  4. Qualified GATE – 1996 with a score of 90.09 %
  5. Acquired Gas Testing certificate under CMR & Mines Act
  6. Acquired Medallion First Aid certificate under Mines Act
  7. INSO (Lifetime Achivement Award International Research Award ) 2022

Citation Details
Total = 150, H Index = 4, I-10 Index = 3 

  Publication in National/ International Journals - 34

  Publication in National/ International Seminars and Conferences- 19

   List of Publications in National/ International Journals as follows:

SI No.

Author(s)

Month & Year

Title

Complete Reference of Journal (Indexing,Page No., Volume No. etc)

Impact Factor of Journal

Citations of Paper

1

Patel R.K, Alok and N.Kishore

08-2017

Assessment of

Comparative Cost of Continuous

Surface Miner Vs.

Conventional

Drilling and

Blasting in Major

Opencast Mines

Minetech

( CMPDIL), Vol.38, No.4,

Oct.-Dec.2017, pp27-34

(Non-Indexed)

-----

NIL

2

Patel R.K, Alok and N.Kishore

09-2017

Assessment of

Comparative Operating Cost of New Dragline Vs.

Outlive dragline

Asian Journal of

Science and

Technology ,

Sept.2017, pp.5511-5516(

SCImago)

H Index-14,

SJR-0.146

NIL

3

Dipanjan Das,

M.Mutyal Rao and

N.Kishore

04-2017

Planning of a

Surface Miner in a

Mega Opencast

Project- A Case

Study

Minetech

( CMPDIL), Vol. 38,

No.2,April-June,2017, pp.3-14 (

Non-Indexed)

----

NIL

4

Alok, Patel R.K,

Rao M Mutyal and

N.Kishore

07-2017

Cost and

Economics

Analysis of

Continuous

Surface Miner in

Major Opencast

Coal Mines- A

Case Study

Minetech

( CMPDIL), Vol. 38,

No.3,July-Sept.,2017, pp.28-34(Non-Indexed)

------

NIL

5

P.Y.Dhekne,

N.Kishore and

Romil Mishra

01-2017

Minimisation of Surface Mining Costs using Artificial Neural Network

Int'l Journal of Research in

Chemical, Metallurgical and Civil Engg. (IJRCMCE) Vol. 4,Issue 1 pp.156-160 (Non-Indexed)

----

NIL

6

Wadhwani H,

 Lokhande R D and

N.Kishore

07-2015

Highwall Mining

Minetech(CMPDIL),

Ranchi,

Vol.36,No.3 y-Sept.,2015(Non-Inde

xed)         ----

NIL

7

Trivedi R, Kishore

N and Mishra D

08-2013

A Study of Cost

Analysis of Closure of an Opencast

Limestone

Indian Journal of

Environmental

Protection, Vol.33, No. 08. pp.617-628 (SCI

Journal)

H Index-17, 0.09

NIL

8

Dewangan,P.,Pradhan, and Kishore,N

M.

04-2013

Slope Stability

Radar System For

Monitoring Open

Pit Slopes

The Indian Mining

& Engineering Journal

Vol.52,No.4, pp.18-21. (UGC

Approved)

------

NIL

9

Kishore,N.,Dewangan

P. and Dhekne,P.Y

03-2012

Method of DrawingJo

Balancing Diagram

The Indian Mining

& Engineering urnal,Vol.51,No.3,pp.18

(UGC Approved)

-21

-----

NIL

10

Dewangan,P.,Pradhan, and Kishore,N

M.

01-2012

Use of Coal

Combustion

Residues in Mining

Industry for

Sustainable

Development of

Mining and PowerJo

Sector Together

The Indian Mining

& Engineering urnal,Vol.51,No.1,pp.24

(UGC Approved)

-31

-----

NIL

11

Dewangan,P.,Pradhan, and Kishore,N,

M.

08-2010

Utilization of Fly

Ash as a Structural

Fill Material for

Safe and

Sustainable

TheIndianMiningD velopme t: &

Need of the Hour

EngineeringJournal,Vol.

(UGC Approved)

49 ,No.8,pp. 134-139

-----

10

12

Kishore,N. and

Dewangan, P

08-2010

Estimation of

Operating Cost of

Dragline in Various

Modes of

Operation

The Indian Mining

&Engineering

Journal,Vol.49,

No.8,pp.131-133.

(UGC Approved)

----

NIL

13

Kishore,N.and Jaiswal,A.

07-2005

Application of computer software package for

preparation of

Dragline Balancing

Diagram

Minetech(CMPDIL),

Vol.26,

No.3,pp.13-19

(Non-Indexed)

----

NIL

14

Kishore,N. and Jaiswal,A.

10-2004

Design And

Planning Of

Dragline Pits- A

Few Consideration

Mining Engineers Journal,

Hyderabad,Vol. 5,

No. 10,pp.26-29

(peer-reviewed)

-----

NIL

15

Rai,P., Kishore,N.

and Nath,R

03-2001

Increasing dragline

output – Cut width analysis in a

tandem dragline operation

World Mining

Equipment (U.K),

Vol.25, No. 3, pp.48-52

(Non-Indexed)

-----

3

16

Rai,P., Kishore,N.

and Nath,R

08-2000

Influence of overburden

thickness and

width of key cut on

the performance of Draglines in

Horizontal Tandem

The Institution of

Engineers (India),

Series-D, Vol. 81, pp10-13

(SCImagoJournal)

0.84

NIL

17

Rai,P., Kishore,N. and Nath,R..

10-1999

Effects of cut width on performance of

dragline operating in horizontal

tandem-A Case

Study

Coal international mining & quarry world (U.K),

Vol.-247, No.6,

Oct./

Nov.,pp.216-220.

(Non-Indexed)

-----

NIL

18

Anand Kumar,

Sunil Kumar,

Sanjay Kumar

Sharma, Nawal Kishore, C. S.

Singh

01-2020

Assessment of

Blast-Induced

Ground Vibration

Frequency in

Opencast Coal

Mine: a

Multivariate

Statistical

Regression Model

International

Journal of Recent

Technology and

Engineering

( IJRTE) ISSN :

2277-3878 ,

Volume-8 Issue-5, January 2020

(Scopus Indexed)

1.0

NIL

19

Gagan Gupta,

Sanjay K. Sharma,

G. S. P. Singh,

Nawal Kishore

08-2021

Numerical

Modelling-Based

Stability Analysis of Waste Dump

Slope Structures in

Open-Pit Mines-A

Review

Journal of The

Institution of

Engineers India,

Series D,

Springer,Vol.

102(4)

1.42

-

20

Anand Kumar,

Sanjay Kumar

Sharma, and

Nawal Kishore

07-2021

Prediction of

Blast-Induced

Ground Vibration

Using Multi-Variate

Regression

Analysis in an

Opencast Mine

Journal of Mines,

Metals &

Fuels,Vol.69, Issue

7, p.216-224

H Index-11,

I.F-0.07

-

21

D.C.Jharia,

T.Kumar,H.K Pandey,

Dharmendra

Kumar and

N.Kishore

10-2019

Assessment of groundwater

vulnerability to

pollution by

modified DRASTIC model and analytic hierarchy process

Environmental Earth

Sciences(SCI

Journal) Issue 78, Vol.10,Page 1 to

19 of 610

1.435

17

22

D.C.Jharia,

T.Kumar,Gobi

Nath.M, P.Diwan and N.Kishore

10-2016

Assessment of groundwater

potential zone using remote

sensing, GIS and multi criteria

decision analysis techniques

Journal of the

Geological Society of India ,88 (4),

pp.481-492 (SCI

Journal)

0.547

57

23

Shah Izhar

Ahmed,Nawal

Kishore and

D.C.Jhariya

05-2021

Evaluation of

Groundwater

Quality in Jampali

Coal Mine, Raigarh

Environmental

Quality

Management,Article

DOI:10.1002/tqem 21767 , Internal Article ID:

17100785 , Wiley

Publication

0.961

NIL

24

Vikram Seervi,

Nawal Kishore,

Amit Kumar Verma

03-2022

Selection of mode of tandem dragline operations by utilizing

3-dimensional computer graphics

balancing diagram: a case study

JOURNAL OF

MINES, METALS

& FUELS, Vol.70, No.3, MARCH

2022 , p -112-123

(Scopus Indexed)

0.07

-

25

Dharmendra

Kumar Singh,

Nawal Kishore

02-2022

Geoelectrical

Sounding to identify

Sub-surface and

Groundwater state at Village Banauli, Singrauli District,

Madhya Pradesh,

India

Nature

Environment and

Pollution

Technology, ISSN

0972-6268( PRINT); ISSN

2395-3454( ONLINE), Vol.21,No.4,2022

,Paper No. B3883

(Scopus Indexed)

0.42

-

26

Dharmendra

Kumar Singh,

Nawal Kishore,

Birendra Pratap,

Vijayendra Pratap

Dheeraj

06-2022

Geoelectrical

Sounding for

Aquifer characterization in and around

Nandgao, Majan

Singrauli District,

Madhya Pradesh,

India

Indian Journal of Environmental

Protection, ISSN:

0253  – 7141,Paper No. 20211122

(Scopus Indexed)

0.20

-

27

Vijayendra Pratap

Dheeraj; C S

Singh; Nawal

Kishore; Ashwani

Kumar Sonkar

10-2022

Heavy Metal

Pollution Indices

Used to Assess the Quality of

Groundwater in

Korba Coalfield

(KCF) Region

Chhattisgarh, India

Journal of the

Geological Society of India (SCI

Journal)

1.459

-

28

Vikram Seervi;

Nilesh Pratap

Singh; Nawal

Kishore; Amit

Kumar Verma

08-2022

Critical Analysis of

Tandem Dragline

Performance in

Open Cast Coal

Mines- A Case

Study

Journal of The

Institution of

Engineers (India):

Series D Springer

India (Scopus

Indexed)

1.423

-

29

Nilesh Pratap

Singh; Vikram

Seervi; Sonu

Meena; Aarif

Jamal;Nawal

Kishore

01-2023

Development of

Multiple Regression Model for Assessment of Coal Calorific

Value in Indian

Opencast Mines

Journal of The

Institution of

Engineers (India):

Series D Springer

India (Scopus

Indexed)

1.423

NIL

30

Nilesh Pratap

Singh; Vikram

Seervi; Nawal

Kishore; Amit

Kumar Verma

01-2023

An Investigation into statistical correlations

between coal

production and key productivity

indicators of

surface miners in

Indian Opencast

Mines

Mining, Metallurgy

& Exploration, Springer

Journals(SCI

Journal),

1.71

NIL

31

Nilesh Pratap

Singh; Vikram

Seervi; Nawal

Kishore; Amit

Kumar Verma

02-2023

Impact of Surface

Miner Utilisation on

Production

Efficiency in

Opencast Coal

Mines using Least Squares Method:

A Case Study

Journal of The

Institution of

Engineers (India):

Series D Springer

India (Scopus

Indexed),

Vol.104(1)

1.423

NIL

32

Ali Amaan Md Ajaj

Ansari; Vikram

Seervi; Nawal

Kishore; Nilesh

Pratap Singh

02-2023

An Investigation into the Effect of Rain on

Fragmented Coal:

A Case Study

Journal of The

Institution of

Engineers (India):

Series D Springer

India (Scopus

Indexed),

Vol.104(1)

1.423

NIL

33

Anand Kumar,

Pusker Singh,

Sanjay Kumar

Sharma, Nawal

Kishore and C. S.

Singh

07-2021

Quantitative assessment of

BIGV and

structural response

based on velocity

and frequency around an opencast mine

CURRENT

SCIENCE, VOL.

121 , NO. 2,  25

JULY 2021,

p.275-285, SCI

Indexed

1.102

-

34 Vikram Seervi, Nilesh Pratap Singh, Nawal Kishore and Rajeev Verma 09-2022 Breakdown and Productivity Prediction of Dragline using Machine Learning Algorithms

Journal of Mines, Metals and Fuels

Vol.70(9), September 2022

p.476-483

0.07

Publications in Conference/Seminars( National and International) proceedings

SI No.

Author(s)

Month & Year

Title

Complete Reference of

Conference

1

Kishore N and A Agrawal

02-2020

Mine Closure Planning

Vis-à-vis Sustainable

Development

Recent Practices and

Advancement in Mineral Industry (RPAMI), 21st – 22 nd Feb. 2020.

RPAMI-MSP-05 Held at

VNIT Nagpur

2

A.Agrawal and Kishore N

12-2019

Comparison of mine closure cost estimation technique

globally

IInd International

Conference on Opencast

Mining Technology &

Sustainability,ICOMS-2019,

13-14  December

2019 ,Singrauli, M.P.

3

Kishore N

12-2017

Determination ofAnnual

Production Capacity of

Different Draglines

Advances in Mine

Environment, Geo techniques and Ground

Control (AMEGGC-2017),

National Institute of

Technology, Raipur

Chhattisgarh, 492010

4

Patel R.K and Kishore N

12-2017

Cost Analysis and

Estimation of Continuous

Surface Miner at Different geo-mining Condition in

Indian Coal Mines

Advances in Mine

Environment,

Geotechniques and Ground

Control (AMEGGC-2017),

National Institute of

Technology, Raipur

Chhattisgarh, 492010

5

G.Gupta, Sanjay.K

Sharma,GSP Singh,T

Verma andN. Kishore

12-2017

Advances in Mine

Environment,

Geotechniques and Ground

Control (AMEGGC-2017),

National Institute of

Technology, Raipur

Chhattisgarh, 492010

Advances in Mine

Environment, Geo techniques and Ground

Control (AMEGGC-2017),

National Institute of

Technology, Raipur

Chhattisgarh, 492010

6

Patel R.K and Kishore N

09-2017

Continuous Surface Miner

An Environmental Friendly

Prospective in Indian Coal

Mines

Current Practices in Mining and Allied Industries

( CPMAI-2017), National

Conference Held at GCE

Keonjhar (Odisha)

7

Singh N P, Jamal A, Singh

R P and Kishore N

01-2017

Impact of Coal Quality on

Longevity of Picks of

Surface miner- A Case

Study

DEEP16, International

Conference held from 24 –

26  January,2017, IIT

Kharagpur

8

Rao M Mutyal, Patel R.K and Kishore N

01-2017

Planning and Deployment of

Continuous Surface Miner at Moderate Depth

Opencast Mine- A Blast

Free Excavation Technique

DEEP16, International

Conference held from 24 – 26  January,2017, IIT Kharagpur.

9

Jain A., Rai R., Kishore N.

And Jaiswal A

02-2016

Applicability of Surface Miner in Opencast Mines

Proceedings of Seminar on

Recent Practices and

Innovations in Mining

Industry; RPIMI 2016, 19-20 February 2016.

10

Verma L.K., and Kishore N

02-2016

Predicting Dangerous

Seismic Events in Active

Coal Mines Through Data

Mining

Proceedings of Seminar on

Recent Practices and

Innovations in Mining

Industry;RPIMI-2016,19-20,February2016,

NIT Raipur

11

Sandeep Kumar Sahoo, Roshan Kumar Patel ,

GyanWrat NawalKishore

02-2018

Effect of Cutting Operation of Picks on the Reliability of

Surface Miner

Third National Conference on Mining Equipment: New

Technologies, Challenges &

Applications( MENTCA-18),

9-10  Feb.,2018, IIT-ISM

Dhanbad

12

Kishore,N. and Dewangan,

P

03-2015

Occupational Health Surveillance in Indian Mines

MiCTM-2015 3rd international conference on technology management

held on 25-26th March 2015

at School of Engineering & Information Technology,

Manipal University, Dubai, UAE.

13

Dewangan,P.,Pradhan,M.

and Kishore,N

03-2014

Opencast Coal Mining

Technology in India-

Present Scenario and

Challenges Ahead

National Seminar on

Problems in Mining Industry and Technological

Advancements on March

7-8,2014  at Udaipur

14

Dewangan,P.,Pradhan,M.

and Kishore,N.

05-2013

Advancement in

Geotechnical

Instrumentation for

Monitoring Unstable Open

Pit Mine Slopes: An

Overview

Clean Mining

TechnologyMINETECH’13,3-4

May 2013,Bhubaneswar

15

Kishore,N. and Dewangan,

P

05-2010

Estimation of Operating

Cost of Dragline in Various

Modes of Operation

Mining Technology for

Sustainable Development

MineTECH’10 Bhubaneswar

16

Dharmendra Kumar Singh

,Nawal Kishore, Vijayendra

Pratap Dheeraj

02-2021

Use of Genetic algorithm and Least Square method

for inversion of Aki-Richard and Yanghua Wang

approximation of Zoeppritz

equation

International Conference On

Recent Advances in

Science & Engineering

( RASE 2K21), Rajkiya

Engineering College,

Sonbhadra,

17

Vikram Seervi, Nawal

Kishore

12-2021

Application Of

3-Dimensional Balancing Diagram For Effective

Draglines Operating In

Tandem

4 th INTERNATIONAL CONFERENCE ON

OPENCAST MINING

TECHNOLOGY &

SUSTAINABILITY, ICOMS -2021 , 13-14 December 2021 ,Singrauli, M.P.

18

Dharmendra Kumar Singh,

Dr. Nawal Kishore

01-2021

Numerical Approach to

Solve Approximation of

Zoeppritz Equation Using

Least square Method And

Genetic Algorithm

3 rd INTERNATIONAL CONFERENCE ON

OPENCAST MINING

TECHNOLOGY &

SUSTAINABILITY, ICOMS -2021 , 22-23 January 2021 ,Singrauli, M.P.

19

Dharmendra Kumar

Singh,Nawal

Kishore,Birendra

Prataph,Ashwani Kumar

Sonkar,Vijayendra Pratap

Dheeraj

12-2021

Geoelectrical Sounding for

Groundwater Exploration around Nigahi colony,

Singrauli District, Madhya

Pradesh, India

4 th INTERNATIONAL CONFERENCE ON

OPENCAST MINING

TECHNOLOGY &

SUSTAINABILITY, ICOMS -2021 , 13-14 December 2021 ,Singrauli, M.P.

 

  1. Two Ph.D Research Scholar acquired the degree and Three research scholars will be submitting thesis shortly.

SI No.

Name of The

Student(s)

Date of Registration

Date of Submission

Year of

Completion or in

Progress

Name of

Institute

Title of

Thesis

Guide or Co-guide

1

Prasant Kumar Singh

29-07-2019

Ongoing

In Progress

IIT BHU Varanasi

Assessment

of the Impact of Openpit Mining on

Groundwater

Guide

2

Nilesh Pratap

Singh

22-07-2016

22-07-2022

In Progress

IIT BHU Varanasi

Productivity

Analysis of

Continuous

Surface miner in different geo-mining condition

Guide

3

Shah Izhar

Ahmed

19-07-2015

26-12-2021

2022

IIT BHU Varanasi

Impact of

Mining on

Ground Water Quality in and around

Jampali

Opencast

Coal Mine.

Guide

4

Dharmendra Kumar Singh

28-12-2015

21-12-2021

2022

IIT BHU Varanasi

Ground

Water

Exploration

Using

Geophysical Method in

Mining Area

Guide

5

Vikram Seervi

26-12-2017

Degree Awarded

2022

IIT BHU Varanasi

Three-Dimension al

Balancing

Diagram for

Planning of

Tandem

Dragline

Operations in

Large

Opencast

Mines

Guide

6

Anand Kumar

23-07-2014

Degree Awarded

2021

IIT BHU Varanasi

A Study of the Effects of Blasting

Vibrations on the nearby

Structures

Co-guide

   2.Twenty M.Tech. Thesis has been supervised and degree awarded and presently three more students are doing their research work under my supervision.

SI No.

Name of The

Student(s)

Date of Registration

Date of Submission

Year of

Completion or in

Progress

Name of

Institute

Title of

Thesis

Guide or Co-guide

1

Alok

20-07-2015

19-07-2017

2017

IIT BHU Varanasi

Cost and

Economic

Analysis of

Continuous Surface Miner in Indian Coal Mines- A

Case Study

Guide

2

Dipanjan Das

20-07-2015

19-07-2017

2017

IIT BHU Varanasi

Planning of

Surface Miner in a Mega

Opencast

Project

Guide

3

K Sampath

Raj

23-07-2012

07-06-2017

2017

IIT BHU Varanasi

Optimization of Production in Dragline

Operations

Using Overall

Equipment

Efficiency

Co-guide

4

Rajendra

Prasad

28-07-2016

17-05-2018

2018

IIT BHU Varanasi

Open Pit

Optimization and Design by Using

SURPAC and

WHITTLE

Software

Guide

5

Abhash

Shikhar

26-07-2013

17-05-2018

2018

IIT BHU Varanasi

Numerical

Modelling of

Waste Dump-

A case Study

Guide

6

Bodda

Prabhu Prem

Kumar

28-07-2014

03-06-2019

2019

IIT BHU Varanasi

The Study of Fly Ash

Utilization in

Overburden

Dumps

Guide

7

Narendra

Singh

Dhaked

23-07-2017

06-07-2019

2019

IIT BHU Varanasi

Planning of

Drainage

System In

Opencast

Mines

Guide

8

Dhananjay

Kumar

23-07-2017

06-07-2019

2019

IIT BHU Varanasi

Estimation of Threshold

Limit Value of

Dump Slope

Stability in

Opencast

Mines

Guide

9

Ajeet Kumar

Tripathi

29-07-2018

30-05-2020

2020

IIT BHU Varanasi

Relationship of working

Conditions and Individual

Characteristic to

Occupational

Accidents

Guide

10

Pankaj Kumawat

29-07-2018

10-06-2020

2020

IIT BHU Varanasi

Assessment

of

Performance of Heavy

Earth Moving

Machinery in Opencast

Coal Mine-A

Case Study

Guide

11

Abhishek Kumar Uttam

29-07-2020

06-06-2020

2020

IIT BHU Varanasi

Planning of

Drainage

System in

Opencast

Mining

Project

Co-guide

12

Abhishek

Singh

26-07-2015

30-05-2020

2020

IIT BHU Varanasi

Design pattern and stability of

contiguous seamanalysis

Guide

13

Vinod Rajak

26-07-2015

30-05-2020

2020

IIT BHU Varanasi

Mixing of Fly Ash with

Overburden to inhance the slope

stability of

overburden dump

Guide

14

Vishal Kumar

Singh

25-07-2019

30-06-2021

2021

IIT BHU Varanasi

EIA

Enhancement of Production of an

Opencast

Mines- A

Case Study

Guide

15

Gaje Deepak

25-07-2019

30-06-2021

2021

IIT BHU Varanasi

Assessment of Cost and

Economics of

Mine Closure in Opencast

Mine

Guide

16

Pravin Kumar

Prajapati

25-07-2019

30-06-2021

2021

IIT BHU Varanasi

Assessment of Damage

Criteria due to Blasting in

Opencast

Mines

Guide

17

Aditya Patra

23-07-2016

30-06-2021

2021

IIT BHU Varanasi

Development

of a

Computer

Graphics

Package to

Construct

3- Dimensional Balancing

Diagrams and

Optimize the

Operation of

Tandem

Draglines

Guide

18

Vijay Utkarsh

Pratap Singh

23-07-2016

30-06-2021

2021

IIT BHU Varanasi

Optimization of Blasting

Parameters in

Opencast

Mines

Guide

19

Bavandlapally

Sandeep

26-07-2020

27-06-2022

2022

IIT BHU Varanasi

Assessment of EIA for

Opencast

Coal Mine with

enhanceing the annual

production- A case Study

Guide

20

Ankit Yadav

27-07-2017

07-07-2022

2022

IIT BHU Varanasi

Breakdown and

Productivity

Prediction of

Dragline

Operations

Using

Machine

Learning

Guide

 

Sl. No. Title of Project Funding Agency Status completed or in progress
1 Scientific study in compliance of CMR 2017 (106) (2) to opencast mine of CESC, Asansol CESC Kolkatta Completed
2 Scientific study on blasting pattern in OB bench of Dipka Expansion project of Dipka area, SECL to prevent cracks in buildings of nearby villages South Eastern Coalfields Limited Completed
3 Scientific study for preparation and formulation of strata control and monitoring plan as per reg. 123 of CMR 2017 for Baherabandh U/G mine, Hasdeo area South Eastern Coalfields Limited Completed
4 Scientific study for preparation and formulation of strata control and monitoring plan in No. 1 seam of Bartunga Hill mine as per Reg. 123 of CMR 2017 South Eastern Coalfields Limited Completed
5 Scientific study and preparation of scientific study report of Chhal, Baroud, Jampali, GP IV/2&3, GP IV/1 and Bijari  OCP of Raigarh area, SECL in compliance of CMR 106 (2). South Eastern Coalfields Limited Completed
6 Scientific Study for Dipka OCP, SECL to work out threshold limit during slope stability monitoring with Radar South Eastern Coalfields Limited Completed
7 Scientific Study for Kushmunda OCP, SECL to work out threshold limit during slope stability monitoring with Radar South Eastern Coalfields Limited Completed
8 Determination/Formulation of SOR (schedule of Rates) for Outsourcing Work of Removal of Overburden, Loading of coal into Tippers/trucks, transportation of coal, wagon loading, drilling in coal strata, crushing of coal by mobile crusher and extraction of coal by surface miner etc. in SECL South Eastern Coalfields Limited Completed
9 Scientific study in compliance of CMR 2017 (106) (2) of Madhaipur OCP, Pandaveswar area, ECL Eastern Coalfields Ltd., (CIL) Completed
10 Scientific study for design of blast pattern and ground vibration monitoring at Billi Markundi Stone Mine, Sonbhadra M/s Krishna Mining Works Completed
11  Consultancy Service for “Study of Slope Stability and Analysis of Existing Internal and External OB Dump of the 05 Opencast projects of NCL Northern Coalfields Limited Completed
12 Scientific study for preparation and formulation of strata control and monitoring plan as per reg. 123 of CMR 2017 for Bijuri U/G mine, Hasdeo area South Eastern Coalfields Limited Completed
13 Scientific study for preparation of strata control and monitoring plan as per Reg. 123 of CMR 2017 for Jhiria UG mine of Hasdeo area South Eastern Coalfields Limited Completed
14 Scientific study of slope stability  of Parsa East and Kanta Basan Open cast coal mine Adani Completed
15 Technical study for Utilisation of fly ash mixing with OB and backfilling in Jampali Opencast Project, Raigarh area, SECL South Eastern Coalfields Limited Completed
16 Scientific study at Hirakhand Bundia mine, Orient Area, MCL Mahanadi Coalfields Limited Completed
17 Scientific study of development of cracks and potholes in the area between edges of western quarry and Gandhi Sagar dump to ascertain the exact cause of disturbance in western quarry of Manikpur colliery South Eastern Coalfields Limited Completed
18 Scientific Study for Gevra OCP, SECL to work out threshold limit during slope stability monitoring with Radar South Eastern Coalfields Limited Completed
19 Scientific study of Gevra OCP SECL for planning, design and working in respect to method of working, ultimate pit slope, dump slope and monitoring of slope stability South Eastern Coalfields Limited Completed
20 Scientific Study for Preparation of Strata Control and Monitoring Plan (SCAMP) and Preparation and Formulation of SCAMP as per Reg. 123 of CMR-2017 in respect of Orient Colliery Mine # 3, Orient Area, Mahanadi Coalfields Limited
 
Mahanadi Coalfields Limited Completed
21 Review/Vetting of the Existing SoR and Determination/Formulation of a New SoR for Outsourcing Work of Removal of Overburden, Loading of Coal into Tippers/Trucks, Transportation of Coal, Wagon Loading, Drilling in Coal Strata, Crushing of Coal by Mobile Crusher and Extraction of Coal by Surface miner etc in SECL South Eastern Coalfields Limited Completed
22 Scientific Study to Plan and Design Ultimate Pit Slope of One Number of Pit of Opencast Working Involving Extraction of Multiple Developed Coal Seams Previously Worked by Underground Bord and Pillar Method) with Removal of Overburden at Pindra colliery, Kuju Area, Central Coalfields Limited Central Coalfields Ltd., (CIL) Completed
23 Scientific Study for Stability of Parting Between Contiguous Coal Seams G-III Top and Bottom of Bagdewa Underground Coal Mine, SECL  South Eastern Coalfields Limited Completed
24 Scientific Study for Preparation of Strata Control and Monitoring Plan (SCAMP) for Depillaring Panel 57N in Seam V at NCPH Colliery R-6 Mine, Chirimiri Area SECL South Eastern Coalfields Limited Completed
25 Scientific Study to Determine the stability of ground over depillared area for establishing surface coal gasification plant at Bhatgaon Colliery of Bhatgaon Area South Eastern Coalfields Limited Completed
26 Scientific Study in Manikpur Opencast Mine of korba Area,SECL as per the guidelines issued by DGMS(TECH.) Circular No. 03 of 2020 dated 16.01.2020 South Eastern Coalfields Limited In progress
27 Scientific Study to extract the property of Seam IV and V standing on pillars in the Northern(Zone-1) and Middle(Zone-2) parts of Kurasia Colliery, SECL South Eastern Coalfields Limited In progress

 

Sl. No. Name of Body Status of Membership
1 International Society of Rock Mechanics (ISRM), India Life member
2 Mining Geological and Metallurgical Society of India (MGMI) Life member
3 Indian Meteorological Society, New Delhi, India (IMS). Life member
4 Mining Engineering Association Of India(MEAI) Life member
5 Indian Geotechnical Society, New Delhi Life member
6 Mining Engineering Society, IIT BHU, Varanasi. Life member

 

Sl. No. Year  Place Date and Duration Title of STC(CEP)
1 2016 IIT(BHU) Sept, 12-17,2016 / Six Days Coal beneficiation  (CB-2016)
2 2017 IIT(BHU) July 24-29,2017 / Six Days Coal quality management & Utilization (CQMU-2017)
3 2017 IIT(BHU) Oct, 9-14, 2017 / Six days Environmental Management In Mining And Allied Industries(EMMAI-2017)

 

  1. Convener DUGC, Mining Engineering Department
  2. Departmental Representative , Training & Placement Cell, IIT(BHU)
  3. Member Secretary, Departmental Condemnation Committee,IIT(BHU)
  4. Member Secretary, Departmental Purchase Committee, IIT(BHU)
  5. Member , DUGC/ DPGC
  6. Assistant Dean Students Welfare, NIT Raipur
  7. Faculty in charge, Mining Engineering Society, NIT Raipur
  8. Verification Officer for three consecutive years in Central Counseling for M.Tech  (CCMT) admission  2012-14,NIT Raipur

1. 26 Practice Sets for Competitive Mining Exams,

Authors-NawalKishore, Roshan Kumar Patel and Sanjay
Kumar Sharma

Denett & Co.Nagpur Central Techno Publishers

ISBN 978-81-933566-7-8 , Year-2017

2. Recent Methods and Techniques in Surface Mining

Authors-NawalKishore, Roshan Kumar Patel

         
Denett & Co.Nagpur Central Techno Publishers          
ISBN 978-81-933566-7-8 , Year-2022