Dr. Siva Prasad B N V

Assistant Professor
Department/School/Unit Name
Department of Mining Engineering IIT (BHU)
Phone No(s): 77268 11680
Email: sivaprasadbnv.min@itbhu.ac.in; sivaprasadbnv@yahoo.in
Area of Interest: Design of Underground Space, Metal Mining, Hydroelectric Projects, Caverns, Numerical Modelling, Applied Rock Mechanics, Rock Excavation, Instrumentation

Dr. Siva Prasad BNV is a professional, enthusiastic faculty, geo-scientist and consultant. Having executed over 58 inter-disciplinary industry-research projects in mining, civil, tunnelling, hydel, irrigation, energy and infrastructure sectors, crucial industrial requirements are well understood and solved. His expertise lies in the application of rock mechanics principles to solve industrial problems using numerical modelling techniques, drilling and blasting for underground and surface excavations, geodetic and geotechnical instrumentation in mines, tunnels, civil structures, and hydro-electric projects, design of ground control methods and support systems, determination of in-situ stress regimes, geotechnical mapping, rock mass characterization, and mine development. He has rich experience working for lead-zinc, gold, copper, iron ore, uranium, aluminium, iron ore, and coal mining. His international assignments include Bhutan, South Korea, Singapore, and Austria. He was on foreign deputation to Punatsangchhu-II Hydroelectric Project, Bhutan for four years. Prior to joining NIRM, he worked at Zawar Mines, Hindustan Zinc Limited contributing to mine transformation vis-à-vis mining, rock mechanics, and geotechnical aspects and also he is certified with a Second Class Mine Manager Certificate of Competency in metalliferous mines.

    Degree

    Discipline

    Year

    Institute / Organisation

    Ph.D.

    Mining Engineering

    2022

    Indian Institute of Technology (Indian School of Mines), Dhanbad

    Professional Course Work

    Rock Mechanics (Basic and Advanced)

    2014

    Indian Institute of Technology (Indian School of Mines), Dhanbad

    Second Class Mine Managers Certificate of Competency (Metal-Unrestricted)

    2014

    Directorate General of Mines Safety, GoI

    B. Tech

    Mining Engineering

    2013

    National Institute of Technology, Rourkela

    Tenure

    Role

    14 Feb 2024 to Till Date

    Assistant Professor, Department of Mining Engineering, Indian Institute of Technology (Banaras Hindu University), Varanasi

    Apr 2021 – 13 Feb 2024

    Scientist-II, National Institute of Rock Mechanics (NIRM), Bengaluru

    June 2017 – Aug 2021

    Foreign Deputation to Punatsangchhu-II Hydroelectric Project, Bhutan from NIRM

    Apr 2016 – Apr 2021

    Scientist-I, National Institute of Rock Mechanics, Bengaluru

    2013 – 2016

    Assistant Manager, Mining; Ground Control Officer, Department of Rock Mechanics, Zawar Group of Mines, Hindustan Zinc Limited, Development-in-charge, Zawarmala mine, HZL

     

    Countries Visited

    Year

    Country

    2017-2021

    Bhutan (Foreign Deputation)

    2020

    Austria

    2018

    South Korea

    2018

    Singapore

    Role

    Society / Association

    Member

    International Society for Rock Mechanics

    Life Member

    Mining Engineer’s Association of India

    Member

    The Institution of Engineers (India)

    Editorial Board Member

    Journal of Geological Research

    Reviewer

    Bulletin of Engineering Geology, UPorto Journal of Engineering, Geotechnical and Geological Engineering, Journal of Geological Research and Rock Mechanics and Rock Engineering, Journal of Sustainable Mining, Sustainability Journal.

     

    • Exemplary work done at the Punatsangchhu-II Hydroelectric Project, Bhutan was appreciated by Honourable MD, JMD and DT of project.
    • ISRM Rocha Medal 2024 and Young Rock Engineering Award 2021 Nominee from India
    • Was a Technical Advisor for the execution of Geotechnical Instrumentation Works at Punatsangchhu-II Hydroelectric Project, Bhutan (June 2017 to Aug 2021)
    • Former Member of the Technical Committee for monitoring cavity filling and assessing the stability of large underground caverns of PHEP-II, Bhutan (15th May 2022 to 21st Aug 2021)
    • Was Camp Office In-charge, PHEP-II, Bhutan (June 2017 to Aug 2021)
    • Served as Secretary, Process Safety Management for Zawar Group of Mines (2014 to 2016)
    • Chief Core Member of Film & Music Society, Lead Violinist at Heartbeats-Fusion Band, Chief Coordinator of National Service Scheme (NSS) at NIT Rourkela (2009 to 2013)
    • Recognised as the foundation member of Society for Promotion of Indian Classical Music and Culture Amongst Youth (SPIC MACAY), NIT Rourkela chapter

     

    Competence

    Software Skills

    • Rock Mass Characterization
    • 3D Numerical Modelling
    • Metal and Coal Mining 
    • Rock Excavation (Drilling & Blasting)
    • Geotechnical Instrumentation
    • Laboratory & In-situ Testing
    • Excavation & Support Design
    • Dam Engineering
    • Slope – Design and Failure Analysis
    • Data Analytics
    • Blast Design
    • Structural Health Monitoring
    • Determination of in-situ stress
    • Hands-on experience with mining software
    • Cavity Monitoring

    • 2D & 3D Numerical Modelling
    • FLAC2D & 3D, Slope
    • 3DEC
    • UDEC
    • PFC
    • Rocscience, Phase
    • Dips
    • Unwedge
    • Rhinoceros, CAD
    • Grapher
    • Surfer
    • SPSS
    • Blastware
    • WIPFRAG
    • CMS
    • CloudCompare
    • Microsoft Office

    Key research areas I am keen to work on, but not limited to include:

    • Numerical modelling applications to Rock Engineering
    • Rock excavation processes such as drilling, blasting and mechanical cutting.
    • To design underground space, mining methods, and backfilling.
    • To study damage and rock fracture mechanics using discrete element modelling for petroleum and gases extraction.
    • Design of excavation methods in high-stress environments
    • Mining deep-seated deposits.
    • For strategic projects.
    • For mining, tunnelling, civil, large underground caverns, nuclear repositories, pump house complexes, defence and significant infrastructure projects.
    • Design of Backfill Technology – For improving the extraction ratio and providing safety to the miners.
    • Development of an early warning system using smart sensors / IoT and assess the rock burst potential for providing safe and risk-free conditions.
    • To assess the role of geodynamics and dynamic properties of rock and rock mass, on the stability of excavations.
    • Field Investigations – To extend the Petro-Physico-Mechanical (PPM) approach for rock engineering projects.
    • Application of advanced Artificial Intelligence / Machine Learning tools for taking smart decisions in operations.
    • Coal Mining
    • Extraction of the locked-up coal in underground coal mines.
    • Develop a standard methodology for dam design.
    • Develop suitable methods for thick seams extraction.
    • Metal Mining
    • Design of mining methods for extracting narrow reefs.
    • Design of supports to take up dynamic loads.
    • Assess the risk potential using the micro-seismic network.
    • Design of mine ventilation system.

    The following innovative solutions to rock engineering problems of mega engineering projects were provided by applying rock mechanics principles. Worked on over 58 national and international sponsored projects in various capacities. Some of the research contributions sector-wise include the following:

    Mining Sector

    • Hands-on experience in executing mining operations in lead-zinc, gold, copper, iron ore, uranium, aluminium, and coal mines.
    • Design of Mining methods – Sublevel Stoping, Cut and Fill, Vertical Retreat Method, Block Caving, Board & Pillar, Longwall, Blasting Gallery, and Open Pit – helped ore extraction from high & de-stressed geo-environments.
    • Stope and Pillar Design – Sequencing, dimension optimisation, and support design – for economic mining.
    • Backfill Technology – Design, driving through paste fill, stability analysis – for improved extraction ratio.
    • Subsidence – Modelling, determination of alarming limits – for safety of surface structures.
    • Mining Geology – Rock mass characterization, analysis – kinematic, overhung key block failure and fold closure – for orebody delineation, and assessing influence of structural features.
    • Numerical Modelling – Conducted continuum, discontinuum and discrete element modelling using FLAC3D, 3DEC, UDEC, FLAC slope, Phase2, Slide, Dips, Unwedge, and PFC.
    • Drilling and Blasting – Rock mass damage evaluation, drill and blast design for development headings and stopes, vibration monitoring, fragmentation analysis using Blastware and WIPFRAG.
    • Scanning – Stope & overbreak assessment.
    • Slopes – Design and failure analysis.
    • Instrumentation – For monitoring rock mass behaviour pre and post excavation.

    Tunnelling, Hydel, Infrastructure and Irrigation Sectors

    • Exemplary work done at the Punatsangchhu-II Hydroelectric Project, Bhutan has given momentum to the project which was halted for three-years due to a massive rock mass failure.
    • Geotechnical and Geodetic instrumentation – Planning, designing, networking, installing, monitoring, data analysis, and interpretation – for large underground caverns (powerhouse, pumphouse), tunnelling, slopes, and dam complexes.
    • Fabricated and developed unique indigenous instrumentation setups to monitor load and stress in muck, and 3D strain components in dam body under tough environments. Prototypes were developed, installed and monitored successfully for over two years.
    • Cavity Scanning, Delineation, Profile and Volumetric Analysis – Determined accurately from seismic cross-hole tomography and cavity monitoring system results, which aided PHPA, Government of India and Royal Government of Bhutan to assess the project schedule correctly.
    • 3D Numerical Modelling – Assessed rock mass behaviour of powerhouse and dam complexes, spillway, pump house caverns, surge shaft, surge galleries, etc.
    • Design of Caverns, Tunnelling and Excavation methods – In soft soils and hard rocks.
    • In-situ Tests – Conducted Hydro-fracture, deformability and shear tests to measure in-situ stress regimes, stress gradients, rock mass shear and deformation modulus – required for designing excavations, dams and assess their stability.

    Ph.D.

    • Research contributed to rock drilling fraternity. Developed Granularity Index from petrographic studies, and drillability models for estimating the penetration rate.
    • Static and Dynamic Rock Properties – Determined rock’s physico-mechanical, static and dynamic properties.
    • Proposed petro-physico-mechanical approach for rock drillability assessment.
    • Selection of right drilling equipment – Connected micro and macro-level/field-scale drilling outputs – developed nomographs for rapid selection.
    • 3D Discrete Element Modelling – For drilling phenomena simulation.

    Innovations & Products Developed

    • Fabricated and developed unique indigenous instrumentation setups to monitor load and stress in muck, and 3D strain components in dam body under tough environments. Prototypes were developed, installed and monitored successfully.
    • Cavity Scanning, Delineation, Profile and Volumetric Analysis – Determined accurately from seismic cross-hole tomography and cavity monitoring system results, which aided PHPA, Government of India and Royal Government of Bhutan to assess the project schedule correctly.

    Sl. No.

    Project Number

    Sponsoring Agency

    Title of Project

    Start

    End

     
     

    58

    GC2303

    Prime Technology Services

    Assessment of Granite Building Stone Quarry of Thomas O D at Re Survey Nos: 234/1,234/2&234/5 in Muppiyanadu Village, Vythiri Taluk, Wayanad District, Kerala for an extent of 1.3307 Ha

    Dec-2023

    Feb-2024

     

    57

    GC2302

    Llyods Metals and Energies Pvt. Limited

    Mine and Dump Slope Stability Analysis for Lloyds Metals & Energy Ltd., Surjagarh, Gadchiroli, Maharashtra

    Dec-2023

    Feb-2024

     

    56

    GC2301

    Western Coalfields Limited

    Scientific Study for Prediction of 3D Subsidence of 373.2 Ha of land (206.826 Ha Forest Land) of Tandsi Underground Mine, Kanhan Area, WCL

    Oct-2023

    Dec-2023

     

    55

    NM2309

    Gujarat Mineral Development Corporation Ltd.

    Numerical Modelling Studies for Optimisation of of Mining Parameters at Ambaji Underground Mine of GMDC Ltd. Gujarat

    Dec-2023

    Mar-2023

     

    54

    NM2308

    Gujarat Mineral Development Corporation Ltd.

    Numerical Modelling Studies for Optimisation of Mining Parameters at the Open Cast Mines (Kadipani fluorspar and Kadipani Expansion project) of GMDC Ltd. Gujarat

    Dec-2023

    Mar-2023

     

    53

    NM2303

    NorthEast Frontier Railway

    Design Review and Audit of Under Construction Railway Tunnels in Dimapur-Kohima Railway Line

    Sep-2023

    Dec-2023

     

    52

    NM2301

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of geotechnical and geodetic instrumentation data at C3 package of Punatsangchhu-II Hydroelectric Project (2023-2024)

    July-2023

    Jun-2024

     

    51

    NM2208

    Uttarakhand Jal Vidyut Nigam Limited

    3D numerical modelling studies of powerhouse complex for Lakhwar multipurpose project (300MW), Uttarakhand

    Nov-2022

    Apr-2023

     

    50

    NM2207

    Sardar Sarovar Narmada Nigam Ltd.

    Monitoring of permanent DGPS points established on spillway blocks 35,43, and 47 of Sardar Sarovar Dam, Gujarat

    Sep-2022

    Sep-2023

     

    49

    NM2206

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of geotechnical and geodetic instrumentation data at C3 package of Punatsangchhu-II Hydroelectric Project (2022-2023)

    Jul-2022

    Jun-2023

     

    48

    NM2205

    Sardar Sarovar Narmada Nigam Ltd.

    Geodetic monitoring of Sardar Sarovar Dam

    Aug-2022

    Aug-2023

     

    47

    NM2204

    THDC India Ltd.

    3D numerical modelling of Vishnugad Pipalkoti powerhouse complex – Analysis with different geological and geotechnical parameters

    Jul-2022

    Dec-2022

     

    46

    NM2203

    National Thermal Power Corporation (NTPC)

    3D slope stability analysis of already excavated slopes of plunge pool area of Koldam HPP

    Oct-2022

    Apr-2023

     

    45

    NM2202

    Sardar Sarovar Narmada Nigam Ltd.

    Deformation monitoring of underground riverbed powerhouse cavern of Sardar Sarovar Project

    Jul-2022

    Jul-2023

     

    44

    NM2201

    Sardar Sarovar Narmada Nigam Ltd.

    3D numerical modelling of underground powerhouse complex and surge shaft for Reoli Dugli Hydroelectric Project (456 MW)

    Jun-2022

    Dec-2022

     

    43

    NM2111

    Southern Railways

    Design Methodology - Railway Tunnels between Trivandrum and Kanyakumari, Southern Railways

    Jan-2022

    Jan-2023

     

    42

    NM2110

    Hindustan Copper Limited

    Geotechnical Mapping and Numerical Modelling of Underground Workings at Malanjkhand Copper Project, Hindustan Copper Limited

    Dec-2021

    Dec-2022

     

    41

    NM2109

    Hindustan Copper Limited

    Geotechnical Mapping, Slope Stability Analysis, Risk and Impact Assessment of Open Pit at Malanjkhand Copper Project, Hindustan Copper Ltd.

    Dec-2021

    May-2022

     

    40

    NM2108

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of PHPA-II

    Sep-2021

    Sep-2022

     

    39

    NM2107

    Sardar Sarovar Narmada Nigam Ltd.

    Establishment of Permanent DGPS Points on spillway blocks 35, 44, and 47 on Main Dam and verification of the points, Sardar Sarovar Dam.

    Sep-2021

    Sep-2022

     

    38

    NM2106

    Megha Engineering & Infrastructures Ltd (MEIL)

    Stability analysis of crane beam rock ledge using 3D numerical modelling at Palamuru Ranga Reddy Lift Irrigation Scheme-1

    Aug-2021

    Nov-2021

     

    37

    NM2105

    Sardar Sarovar Narmada Nigam Ltd.

    Geodetic Monitoring of Sardar Sarovar Project for the Year 2021-2022

    Aug-2021

    Aug-2022

     

    36

    NM2104

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of Instrumentation Data and Guidance during Installation & Monitoring of Instruments in powerhouse complex (C-3 Package) of Punatsangchhu-II Hydroelectric Project

    Jul-2021

    July-2022

     

    35

    NM2103

    Satluj Jal Vidyut Nigam Limited (SJVNL)

    3D Numerical Modelling of Powerhouse Complex for Sunni Dam Hydroelectric Project (382 MW), Himachal Pradesh

    July-2021

    Oct-2021

     

    34

    NM2102

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of instrumentation data at Dam Complex, Punatsangchhu-II Hydroelectric Project, Bhutan

    Apr-2021

    Apr-2022

     

    33

    NM2004

    Hindustan Zinc Limited (Vedanta)

    CapRock Stability at Central Baroi Mine vis-a-vis Depillaring of Remnant Pillars – A Critical Appraisal

    Sep-2020

    Feb-2021

     

    32

    NM2003

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of Punatsangchhu-II Hydroelectric Project, Bhutan (2020-21)

    July-2020

    Jun-2021

     

    31

    NM2002

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of Geotechnical & Geodetic Instrumentation Data at C-3 Package of Punatsangchhu-II Hydroelectric Project, Bhutan

    July-2020

    Jun-2021

     

    30

    NM2001

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of Instrumentation Data at Dam Complex, Punatsangchhu-II Hydro Electric Project, Bhutan

    Apr-2020

    Mar-2021

     

    29

    NM1906

    THDC India Ltd.

    3D Numerical modelling of powerhouse complex & surge tank for Vishnugad Pipalkoti Hydroelectric project, Uttarakhand

    Jun-2019

    Apr-2022

     

    28

    NM1905

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of instrumentation data and guidance for installation and monitoring of instruments at C#3 package of Punatsangchhu-II Hydroelectric Project, Bhutan

    July-2019

    Jun-2020

     

    27

    NM1901

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Networking and Analysis of Instrumentation Data at Dam Complex, Punatsangchhu-II Hydroelectric Project, Bhutan

    Apr-2019

    Apr-2020

     

    26

    NM1811

    Hindustan Zinc Limited (Vedanta)

    Scientific Studies for Evaluation of Stope and Pillar Stability vis-à-vis Stope Sequencing through Numerical Modelling at Baroi Mine, HZL, Rajasthan

    Apr-2019

    Sep-2021

     

    25

    NM1809

    Hindustan Zinc Limited (Vedanta)

    Review and determination of alarming limits for surface subsidence through numerical modelling at Rajpura Dariba Mines, HZL, Rajasthan

    Jan-2019

    Jul-2020

     

    24

    NM1808

    Hindustan Zinc Limited (Vedanta)

    Failure Analysis of CP-03A Stope and Evaluation of Extraction Sequence of Different Stopes in C-Block at Sindesar Khurd Mines, HZL, Rajasthan

    Dec-2018

    Dec-2019

     

    23

    NM1804

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of Instrumentation data and assistance in installation and monitoring of Instruments at C#3 Package of Punatsangchhu-II hydroelectric Project, Bhutan (2018-19)

    July-2018

    Jun-2019

     

    22

    GE1803

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Determination of In-situ stress regimes at the Downstream surge gallery of Punatsangchhu-II Hydroelectric project, Bhutan.

    Jun-2018

    Oct-2018

     

    21

    NM1802

    Water and Power Consultancy Services (India) Limited (WAPCOS)

    3D Numerical Modelling Studies of Powerhouse Complex at Punatsangchhu-II Hydroelectric Project, Bhutan

    Jun-2018

    Aug-2022

     

    20

    RF1801

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Laboratory Geotechnical Investigations on Jointed Rock Samples from Punatsangchhu-II Hydroelectric Project, Bhutan

    Jul-2018

    Sep-2018

     

    19

    NM1716

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Development of Geotechnical Instrument Network for C#3 package of PHPA-II Hydroelectric Project

    Jan-2018

    Dec-2018

     

    18

    NM1713

    Hindustan Zinc Limited (Vedanta)

    Audit of ground Control Management Plan of Zawar Group of Mines

    Jan-2017

    Dec-2018

     

    17

    NM1710

    Hindustan Zinc Limited (Vedanta)

    Audit of ground Control Management Plan of Rampura Agucha Underground Mines, HZL

    Sep-2017

    Sep-2018

     

    16

    NM1709

    Hindustan Zinc Limited (Vedanta)

    Scientific studies to Design Geotechnical Instrumentation Plan at Rampura Agucha Underground Mines, HZL

    Sep-2017

    Sep-2018

     

    15

    NM1708

    Hindustan Zinc Limited (Vedanta)

    Design of ground Support Below -233 mRL upto -533mRL at Rampura Agucha Underground Mines, HZL

    Sep-2017

    Sep-2018

     

    14

    NM1707

    Hindustan Zinc Limited (Vedanta)

    Scientific Studies to Assess the stability of Drives through Paste fill Rampura Agucha Underground Mines, HZL

    Sep-2017

    Sep-2018

     

    13

    NM1706

    Hindustan Zinc Limited (Vedanta)

    Scientific Studies to Assess the feasibility of Underground mining methods at Rampura Agucha Underground Mines, HZL

    Sep-2017

    Sep-2018

     

    12

    NM1704

    Mangdechhu Hydroelectric Project (MHPA), Bhutan

    Stability Analysis of Butterfly Valve Chamber using 3D Numerical Models at Mangdhechu Hydroelectric Project, Bhutan

    Jun-2017

    Sep-2018

     

    11

    NM1702

    Satluj Jal Vidyut Nigam Limited (SJVNL)

    3D Numerical Model Studies for Stress Analysis of Underground Powerhouse Complex and Underground Surge Shaft of Naitwar Mori Hydroelectric Project, Uttarakhand

    Feb-2017

    Dec-2018

     

    10

    NM1701

    Punatsangchhu-II Hydroelectric Project Authority, Bhutan

    Analysis of instrumentation data and assistance in installation & Monitoring of Instrumentation at C-3 package of Punatsangchhu-II Hydroelectric Project Bhutan

    Jun-2017

    Jun-2018

     

    9

    NM1609

    Hindustan Zinc Limited (Vedanta)

    Establishing the dimensions of caprock and estimating the stoping parameters for K Series and Northern series of lenses at North Baroi Mine, HZL

    jan-2017

    Mar-2017

     

    8

    NM1607

    Hindustan Zinc Limited (Vedanta)

    Assessment of stability of the mine pertaining to extraction of an Ore block at Baroi Mine, HZL

    Dec-2016

    Mar-2017

     

    7

    NM1606

    Hindustan Zinc Limited (Vedanta)

    Scientific study to assess the stress and displacement limits at Zawar Mines, HZL

    Dec-2016

    Mar-2017

     

    6

    NM1605

    Megha Engineering & Infrastructures Ltd (MEIL)

    Geotechnical instrumentation installation and monitoring at Kaleswaram Project-Package-11, Telangana

    Nov-2016

    Nov-2017

     

    5

    NM1604

    Megha Engineering & Infrastructures Ltd (MEIL)

    3D numerical modelling analysis for the pump house and surge pool caverns of Pranahita-Chevella Sujala Sravanthi Lift Irrigation Scheme Package-8, Telangana

    Sep-2016

    Jan-2017

     

    4

    NM1603

    Megha Engineering & Infrastructures Ltd (MEIL)

    Support design of underground surge pool and pump house by 3D Numerical Modelling of Pranahita-Chevella Sujala Sravanthi Lift Irrigation Scheme (PCSSLIS) Package-11, Telangana

    Oct-2016

    Jan-2017

     

    3

    NM1504

    Vedanta Limited

    Pit slope stability analysis of North East benches of A Narrain Mines, Chitradurga, Karnataka

    Dec-2015

    Apr-2017

     

    2

    GC1504

    Hutti Gold Mines Limited

    To carry out rock mechanics investigations, evaluation of the stability of excavations & optimization of stoping parameters, design of support system at Uti and Hirabuddini mines of the Hutti Gold Mines Company Limited, Karnataka

    Jun-2015

    Jul-2017

     

    1

    GC1503

    Hutti Gold Mines Limited

    To carry out rock mechanics investigations, evaluation of the stability of excavations & optimization of stoping parameters, design of support system etc. below 20th level in all the reefs of Hutti Gold Mines, Karnataka

    Jun-2015

    Jul-2017

     

    Published in Journals

    • Siva Prasad BNV, Murthy VMSR, and Sripad RN. " Compendious Index for Drillability: A Rapid Tool to Assess Drill Penetration Rate and Bit Life for Rock Engineering Applications." Bulletin of Engineering Geology and the Environment, vol 82 Article 79, pp.1-20, Feb 2023. https://doi.org/10.1007/s10064-023-03081-y  (SCIE)
    • Siva Prasad BNV, Murthy VMSR and Sripad RN. "Drillability Predictions in Aravalli and Himalayan Rocks – A Petro-Physico-Mechanical Approach". Current Science Journal, Indian Academy of Sciences. vol.122, no.08, pp.907-917, Apr 2022. https://doi.org/10.18520/cs/v122/i8/907-917 (SCIE)
    • Siva Prasad BNV, Murthy VMSR and Sripad RN. "Influence of Static and Dynamic Rock Properties on Drillability Prognosis for Mining and Tunnelling Projects". Indian Geotechnical Journal. vol.52, no.04, pp.765-779, Mar 2022 (Online), Aug 2022 (Journal). https://doi.org/10.1007/s40098-022-00608-0 (ESCI/Scopus)
    • Siva Prasad BNV and Sripad RN. "Importance of Instrumentation in Hydropower Projects". Journal of Geological Research. vol.3, no.2, pp.53-59, Apr 2021. https://doi.org/10.30564/jgr.v3i2.3018
    • Siva Prasad BNV, Thapliyal AP, Bhusan R, and Sripad RN. "Delineation of Cavity in Downstream Surge Chamber at Punatsangchhu-II Hydroelectric Project, Bhutan". Journal of Geological Research. vol.01, no.01, pp.5-11, April 2019. https://doi.org/10.30564/jgr.v1i1.392
    • Jayanthu S, and Siva Prasad BNV. "Evaluation of Strata Behaviour in Blasting Gallery Panel in Underground Coal Mines – A Case Study". Geominetech The Indian Mineral Industry Journal. vol.4, no.02, pp.105-111, May 2016.
    • Jayanthu S, Nagaraja Rao GM, and Siva Prasad BNV. "Acoustic emission trends in Kaiser effect of rocks - A new approach for estimation of in-situ stress". The Indian Mining & Engineering Journal. vol.52, no.04, pp.23-27, Apr 2013.

    Published in the Proceedings of International / National Conferences / Symposiums

    1. Venkatesh HS, Siva Prasad BNV, and Sripad RN. "Numerical modelling and determination of alarming limits for surface subsidence in hard rock lead-zinc mine". International Symposium on Recent Trends in Mineral Industry-2022. PP.1-12, Sep 2022 (SCOPUS)
    2. Prasad, B.N.V.S., Murthy, V.M.S.R., Naik, S.R. (2021). Challenges in Drill Equipment Selection vis-à-vis Underground Excavations – A Methodology. In: Proceedings of Geotechnical Challenges in Mining, Tunneling and Underground Infrastructures. ICGMTU 2021, Malaysia. https://doi.org/10.1007/978-981-16-9770-8_9 (SCOPUS)
    3. Naveen, G.C., Prasad, B.N.V.S., Balachander, R., Gopinath, G., Venkatesh, H.S., Naik, S.R. (2021). “Tunnel Excavation in Highly Stressed Weak Rockmass Condition.” In: Proceedings of Geotechnical Challenges in Mining, Tunneling and Underground Infrastructures. ICGMTU 2021. https://doi.org/10.1007/978-981-16-9770-8_14 (SCOPUS)
    4. Siva Prasad, B.N.V., Sripad. R.N., Vijay Sekar, B.H., & Bhusan, R., “Determination of Stoping methodology for mining secondary stopes by FLAC3D” Applied Numerical Modeling in Geomechanics – 2020 – Billaux, Hazzard, Nelson & Schöpfer (eds.) Paper: 11-06, PP.1-4, ISBN 978-0-9767577-5-7, 5th International Itasca Symposium, 17-21st Feb, Vienna, Austria.
    5. Bhusan, R., Vijay Sekar, B.H., Sudhakar, K., Siva Prasad, B.N.V., and Sripad, R.N., “Stability analysis and optimisation of pit slope for an open cast iron ore mine: A case study", Recent Practices and Advancement in Mineral Industry (RPAMI)” on 21-22nd February 2020, Nagpur, PP.1-5.
    6. Siva Prasad BNV and Jennifer PD. "Instrumentation in hydropower projects vis-à-vis quality control". Quality Control of Concrete & Construction Materials for Hydroelectric Projects by PHEP-II, Bhutan. PP. 31-39, 28-30 Aug 2019
    7. Siva Prasad BNV and Murthy VMSR (2018) Laboratory Investigations into Fracture
      Propagation Characteristics of Rock Material. 2nd International Symposium on Material Science and Engineering, American Institute of Physics, Seoul, South Korea. PP.020009(1-6), Jan 2018, https://doi.org/10.1063/1.5030313 (Scopus)
    8. Siva Prasad BNV, and Sripad RN. "Planning for Geotechnical and Geodetic Instrumentation in Underground Caverns". ISRM International Symposium - 10th Asian Rock Mechanics Symposium (ARMS-10), Singapore, 29- October – 03 November 2018.
    9. Siva Prasad BNV and Murthy VMSR (Oct 2017) Influence of Rock Abrasivity and Bit Wear on Drill Penetration Rate. Indorock, 7th Indian Rock Conference 387-395
    10. Siva Prasad BNV, Murthy VMSR and Pandey SK (Nov 2016) Investigations on rock drillability applied to underground mine development vis-à-vis drill selection. International Conference on Recent Advances in Rock Engineering (RARE), ATLANTIS PRESS, Advances in Engineering Research. vol.91, PP.399-403, https://doi.org/10.2991/rare-16.2016.62
    11. Siva Prasad B.N.V. & Jayantu S., 2016, "Evaluation of Strata Behaviour in Blasting Gallery Panel in Underground Coal Mines – A Case Study", International Symposium on New Equipment, New Technology, Management & Safety in Mining & Mineral Based Industries, 11-12 May 2016, Bhubaneshwar.
    12. Jayanthu S, Nagaraja Rao GM, and Siva Prasad BNV. "Acoustic emission trends in Kaiser effect of rocks - A new approach for
      estimation of in-situ stress". MINETECH’12 – Workshop on Exploration, Exploitation, Equipment, Safety and Environment. PP.1-
      8, May 2012

    Published as Book Chapters

    1. Prasad, B.N.V.S., Murthy, V.M.S.R., Naik, S.R. (2022). Challenges in Drill Equipment Selection vis-à-vis Underground Excavations – A Methodology. Lecture Notes in Civil Engineering, vol 228 PP.167-182, Springer, Singapore. https://doi.org/10.1007/978-981-16-9770-8_9 (SCOPUS)
    2. Naveen, G.C., Prasad, B.N.V.S., Balachander, R., Gopinath, G., Venkatesh, H.S., Naik, S.R. (2022). “Tunnel Excavation in Highly Stressed Weak Rockmass Condition.” Lecture Notes in Civil Engineering, vol 228. PP 241-258 Springer, Singapore. https://doi.org/10.1007/978-981-16-9770-8_14 (SCOPUS)
      • 07 Mar 2024 - "Safe Monitoring Practices in Tunnelling" for the officials of ITD Cementation India Limited.