bkshrivastva.min's picture
Dr. B. K. Shrivastav
Professor
Department of Mining Engineering IIT BHU
bkshrivastva.min@iitbhu.ac.in
0542 - 2369434
Area of Interest: 
Mining Machinery, Rock Mechanics & Ground Control

Name                                   : Prof. B.K. SHRIVASTVA
Date of Birth                       : 20th June, 1957
Present Designation          : Professor
Coordinator,  
                                                Centre of Advanced studies
Institution                           :   Department of Mining Engineering
                                                Indian Institute of Technology(Banaras Hindu University),
                                               Varanasi - 221 005
Academic                             :

S.No. Qualification Institution Year Remarks
1 Ph.D.* BHU 1986  
2. B.Tech. in Mining Engineering BHU 1979 First class with Hons.
( IInd in order of merit)
3. Secondary School Examination Bihar School Examination Board 1972 Ist Class
  1. Head, Department of Mining Engineering, Institute of Technology, Banaras Hindu University, 30 June 2001 – 29 June 2004 and 1st March 2009 – 28th Feb., 2012.
  2. Coordinator, Centre of Advanced Studies in the area of Rock Mechanics, Ground Control and Geo-environment, Department of Mining Engineering, Institute of Technology, Banaras Hindu University, Varanasi – continuing. 
  3. Members of Various Academic And Administrative Bodies of IIT(BHU) and Banaras Hindu University (Academic Council, Policy Planning Committee of Institute of Technology etc.) and Member of Selection Committees of Research Organizations and Universities/ Indian Institute of Technology, Member of Board of Studies of ISM, Dhanbad;  Member of Board of examinations of DGMS, Dhanbad.
  4. Coordinator, QIP&CEP, IIT(BHU) since August, 2016
  1. Rock Mechanics and Ground Control
  1. Subsidence Engineering
  2. Rock slope Engineering
  3. Numerical Modelling of Underground Structures
  1. Mining Machinery
  2. Mine Planning
  3. Mine Environment
  1. Planning of underground mining machinery
  2. Planning of surface mine machinery
  3. Subsidence engineering
  4. Rock mechanics and ground control
  5. Numerical methods in geomechanics

Recent Publications 

  1. Rizwan Hasim, Ashok Jaiswal and BK Shrivastva, (2018), “Estimation of rock load height during development operation in bord and pillar coal mine using numerical simulation method”, Modelling C, Vol. 79; No. 2; pp 24-34

 

  1. Shailendra Chawla, Ashok Jaiswal and B. K. Shrivastva, (2018), “Design of Snook in Depillaring Panel Using Continuous Miner”, Journal of the Institute of Engineering (India) Series D, Vol. 99 (1); pp 39-49

 

  1. Rizwan Hasim, Ashok Jaiswal and BK Shrivastva, (2018), “Support Design during Depillaring Operation in Bord and Pillar Panel Using Numerical Simulation Method”, Modelling C, Vol. 78; No.3; pp 351-363

 

  1. Rizwan Hasim, Ashok Jaiswal and BK Shrivastva, (2017), “Analysis of laminated Roof with Rock Bolt Using Numerical Simulation Method”, The Indian Mining & Engineering Journal, Vol. 56 No.1 0, October 2017, pp.19- 24.

 

  1. Ashish Kumar Vishwakarma, Rajesh Rai and B. K. Shrivastva, (2019), “Distribution Characteristics of Micronutrients in Mining Induced Subsided Land of an Underground Coal Mine of South Eastern Coalfields, India”,  Nature Environment

 
 

  • THE HINDUSTAN ZINC LIMITED PRIZE FOR 1992-93, BY THE INSTITUTION OF ENGINEERS (INDIA), for the Paper "Numerical Simulation of Underground Opening in Jointed Rockmass".

 

  • Dr. RAJENDRA PRASAD GOLD MEDAL 2000 BY THE INSTITUTION OF ENGINEERS (INDIA) for the paper “Prediction of Mining Subsidence and Ground Strain Patterns over a Longwall panel” - A Numerical Approach, Journal of the Institution of Engineers, Vol.80, May 1999, pp 11-15.

 

  • Distinguished alumnus award from IIT(BHU), Varanasi, 2014.

 

  • Prof. S.K. Bose Memorial Awards for the year 2017 – 18 for excellence in teaching in Mining Engineering
  1. Convener “National Seminar on Rockmass I.T., BHU Varanasi,17-19, Jan, 2002.
  2. Chairman “National Seminar on Rock Fragmentation (NSRF-2004)” Dept. of Mining Engineering, I.T., BHU Varanasi, 23-24, Jan, 2004.
  3. Chairman “National Seminar on Status of Environmental Management in Mining Industry SEMMI-2003”, Dept. of Mining Engineering, I.T., BHU Varanasi, 17-18, Jan, 2003.
  4. Chairman Technology Exchange Programme on Instrumentation in Rock Mechanics, Dept. of Mining Engineering Reinforcement”, Department of Mining Engineering, I.T., B.H.U., Varanasi, 28-29 Jan., 2000.
  5. Convener “Platinum Jubilee Symposium on Productivity Improvement in Indian Mining Industry”, Jan. 29-30, 1999, Department of Mining Engineering, I.T., BHU, Varanasi.           
  6. Convener “National Workshop on Mining in Public and Private Sector in 21st Century”, Jan 30-31, 1998 Department of Mining Engineering, I.T., BHU, Varanasi.
  7. Convener “Winter School On "Mine Environment - Planning & Management (Sponsored by ISTE)”, December 1988, Department of Mining Engineering, I.T., BHU, Varanasi.
  8. Coordinator “Short term course on ROCK MECHANICS & GROUND CONTROL”, Centre of Advanced Studies, Department of Mining Engineering, IT, BHU, (held every year in summer).
  9. Coordinator “Short term course on APPLICATION OF NUMERICAL MODELLING IN STRATA CONTROL”, Centre of Advanced Studies, Department of Mining Engineering, IT, BHU, ( held every year in winter).

Research Experience           : Over 38 years
No. of Ph.D. Guided            : Completed (10); Guiding (3)  
No. of M. Tech. guided       : Sixty (60)

Phd Students 
.  S.K.Chaulya - "Environmental Management of Overburden Dump Stability – an Integrated Study".

  1. M.K.Cakravarti - "Water pollution due to mining and allied Industry - A carrying capacity approach".
  2. H.L. Jaiswal - "Prediction of ground movement above a Longwall coal mining panel based on numerical simulation".
  3. C. S. Singh - "Numerical Simulation of Jointed Rockmass In A Depillaring District By Finite Element Method".
  4. S.K. Sharma - "Field Investigations and Numerical Simulation of A bord and Pillar Panel".
  5. Ashok Jaiswal – “Design of Partial Extraction Method for Underground Coal Mines – A Numerical Simulation Approach”. 
  6. Rajesh Rai – “Stabilisation of Mine Waste Dump by Vegetation – A Numerical Approach”.
  7. Sharad Singh – “A Study of the Slope Stability in Magnesite Mine of Pithoragarh District, Uttaranchal”.
  8. Mukesh Kumar – “The Effect of Production Blasting on Dump Stability”.
  9. Tarun Verm - "Air Pollution in deep opencast mining" 

. Effect of Joint Set on Mining structures - A Numerical Simulation by FEM (Completed).
Investigator (s): Dr. B. K. Shrivastva (Principal Investigator)
                          Shri S. K. Sharma (Co-Investigator)
 
2. Simulation of large underground excavations in coal mines using numerical methods (finite element technique) with special reference to longwall faces (Completed).
Investigator (s) : Dr. B. K. Shrivastva (Principal Investigator after Prof. B.B.Dhar left BHU)
                                      Prof. B. B. Dhar (Principal Investigator)
                                      Dr. S. Ratan (Investigator)
3. “A Study of Quantification and Their Weightages for Parameters of Environmental Impact Assessment”, funded by Ministry of Environment and Forests, Government of India for capacity building Completed on 31st Dec. 2002 (Completed).
Investigator (s): Dr. B. K. Shrivastva (Principal Investigator)
                          Shri S. K. Sharma (Co-Investigator)
 
4. “Studies in Ancient Mining and Metallurgy in Sonbhadra-Sidhi Region (running).
Investigator (s): Dr. B. K. Shrivastva (Co-Investigator)
                           Dr. V. Tripathi (Principal investigator)
                        Prof. Gupta (Co-Investigator)
 
 

  1. An environmental study for Air and Water, Rajmahal Coalfield, Godda, Bihar. CMPDI, RI-I, Asansol, (Rs.50, 000/-.)
  2. Prediction of Subsidence by Numerical Modelling of Sargipalli Lead-Zinc Mines of H.Z.L., Kriloskar Consultants Ltd., Pune, (Rs 40,000/.)
  3. Subsidence Prediction by Numerical Modelling for Churi Mine, C.C.L., RI-III, CMPDI, (Rs. 62,500/-.)
  4. Subsidence Prediction by Numerical Modelling for Nakrakunda underground project of E.C.L., CMPDI, RI-I, Asansol, (Rs. 1,40,000/-
  5. Subsidence Prediction by Numerical Modelling for Ray-Bachra Underground Project of C.C.L., RI-III, CMPDIL, (Rs. 1,20,000/-.)
  6. Integrated Subsidence Prediction by Numerical Modelling for Saunda-'D' UG/OCP Project (Integrated Report), RI-III, CMPDIL, (Rs. 85,000/-.)
  7. Integrated Subsidence Prediction of Numerical Modelling for Parej-east  (UG/OCP) Integrated Project.,RI-III, CMPDIL, (Rs. 90,000/-.)
  8. Subsidence Prediction by Numerical Modelling for Urimari UG Project, RI-III, CMPDIL, (Rs. 75,000/-.)
  9. Assessment of Subsidence of Amarpur-Bagdewa Underground Mine of SECL, Korba Area Through 3-D Numerical Modelling, (Rs. 1,10,000/-)
  10. Subsidence Prediction of 3-D Numerical Modelling for KTK - 5 & 5A Incline   Underground Mine SCCL, Kothagudem, Andhra Pradesh, (Rs. 2,00,000/-.)
  11. Subsidence Prediction by 3-D Numerical Modelling for Ravindrakhani-Six (RK-6) Underground Mine of SCCL, Kothagudem, Andhra Pradesh (Rs. 1,80,000/-.)
  12. Subsidence Prediction by 3-D Numerical Modelling for Ravindrakhani-New Tech (RK-NT) Underground Mine of SCCL, Kothagudem, Andhra Pradesh  (Rs. 1,70,000/-.)
  13. Subsidence Prediction by 3-D Numerical Modelling for Ravindrakhani-Seven (RK-7) Underground Mine of SCCL, Kothagudem, Andhra Pradesh (Rs. 2,75,000/-.)
  14. Subsidence Prediction by 3-D Numerical Modelling for Dhanpuri Mines SECL, Burhar Area,  (Rs. 1,80,000/-.)
  15. Subsidence Prediction by 3-D Numerical Modelling for Sub block IV/4 Gare Area, Jayswals Neco Limited, Nagpur, (Rs. 1,50,000/-.)
  16. Subsidence Prediction by 3-D Numerical Modelling for Adriyala Shaft Project Underground Mine of SCCL, Kothagudem, Andhra Pradesh, (Rs. 2,05,000/-.)
  17. Subsidence Prediction by 3-D Numerical Modelling for Goleti 1-A Project Underground Mine of SCCL, Kothagudem, Andhra Pradesh,  (Rs. 1,55,000/-.)
  18. Subsidence Prediction by 3-D Numerical Modelling for KTK-6 Project Underground Mine of SCCL, Kothagudem, Andhra Pradesh  (Rs. 1,55,000/-.)
  19. Subsidence Prediction by 3-D Numerical Modelling for Shantikhani Longwall Project Underground Mine of SCCL, Kothagudem, Andhra Pradesh, ( Rs. 1,45,000/-.)
  20. Subsidence Prediction by 3-D Numerical Modelling for Dhelwadih Project Underground Mine of Korba Area SECL, Chhatisgarh, (Rs. 1,65,000/-.)
  21. Blast Vibration Study and impact over Ground Water Level around Bina Project NCL, Sonebhadra, Uttar Pradesh, (Rs. 1,60,000/-)
  22. Design of Foundation, Diesel Locomotive Works, Varanasi, Uttar Pradesh, (Rs. 45,000/-)
  23. 3D- Numerical Modelling- for prediction of Subsidence due to proposed Underground Mining operations at Peddampet shaft project Area, (Rs. 2,40,000/-)
  24. Assessment of subsidence of Chotia I mine of Prakash Industries Limited, Bilaspur through 3D numerical model, (Rs. 1,90,000/-)
  25. Assessment of subsidence of Chotia II mine of Prakash Industries Limited, Bilaspur through 3D numerical model, (Rs. 1,30,000/-)
  26. Support Design through Numerical modelling for GDK 8A incline, Ramagundam Area, SCCL, Andhra Pradesh, (Rs. 2,10,000/-)
  27. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Churi project of Central Coalfields Limited, (Rs. 97, 500/-)
  28. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Sayal-D project of Central Coalfields Limited, (Rs. 97, 500/-)
  29. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Karo project of Central Coalfields Limited, (Rs. 97, 500/-)
  30. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Kargali project of Central Coalfields Limited, (Rs. 97, 500/-)
  31. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Khasmahal project of Central Coalfields Limited, (Rs. 97, 500/-)
  32. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Dhori-Khas project of Central Coalfields Limited, (Rs. 97, 500/-)
  33. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of NSD project of Central Coalfields Limited, (Rs. 97, 500/-)
  34. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Argada project of Central Coalfields Limited, (Rs. 97, 500/-)
  35. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Kuju project of Central Coalfields Limited, (Rs. 97, 500/-)
  36. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Laiyo project of Central Coalfields Limited, (Rs. 97, 500/-)
  37. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Kedla U/G project of Central Coalfields Limited, (Rs. 97, 500/-)
  38. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Tisri project of Central Coalfields Limited, (Rs. 97, 500/-)
  39. Subsidence Prediction study Using 3D-Numerical Modelling for the proposed Jallaram Shaft (an Underground Coal Mining) Project of SCCL, (Rs. 1,76,320/-)
  40. Subsidence Prediction study Using 3D-Numerical Modelling for the 21 Incline (an Underground Coal Mining) Project of SCCL, (Rs. 1,76,320/-)
  41. Subsidence Prediction study Using 3D-Numerical Modelling for the Gare IV/8 Coal Mining Project of JNL, (Rs. 1,79,380/-)
  42. Scientific study of simultaneous extraction in three section of two seams of 21 Incline, Yellundu area, SCCL (Rs. 3,10,000/-)
  43. Subsidence Prediction study of Jayaswal Nico Limited U/G project at IV/8 coal block, (Rs. 1,79840)
  44. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of Under ground Kayar Lead-Zinc project of HZL, (Rs,2,24,480)
  45. Numerical Modelling in 3-Dimension for subsidence prediction to assess long term damage on surface and their mitigation measures of 21 Incline Yellandu Area SCCl (Rs.2,50,000).
  46. Subsidence Prediction study Using 3D-Numerical Modelling for the Chinora Coal Mine, M/s Fieldmining & Ispat Ltd., Nagpur.
  47. Subsidence Prediction study Using 3D-Numerical Modelling for the Mandla North U/G Project M/s Jai Prakash Associate, New Delhi.
  48. Subsidence Prediction by 3-D Numerical Modelling for Adriyala Shaft Project Underground Mine of SCCL, Kothagudem, Andhra Pradesh.
  49. Subsidence Prediction by 3-D Numerical Modelling for KK-I Incline of SCCL, Kothagudem, Andhra Pradesh. (Rs. 2,24,720/-.)
  50. Subsidence Prediction by 3-D Numerical Modelling for KK-5 Incline of SCCL, Kothagudem, Andhra Pradesh. (Rs. 2,24,720/-.)
  51. Subsidence Prediction by 3-D Numerical Modelling for SRP-3&3A of SCCL, Kothagudem, Andhra Pradesh. (Rs. 2,22,660/-.)
  52. Subsidence Prediction by 3-D Numerical Modelling for RK-5 of SCCL, Kothagudem, Andhra Pradesh. (Rs. 2,22,660/-.)
  53. Subsidence Prediction by 3-D Numerical Modelling for Kondapuram Mine of SCCL, Kothagudem, Andhra Pradesh. (Rs. 2,24,720/-.)
  54. Subsidence Prediction by 3-D Numerical Modelling for Madanpur (North) Underground Coal Mine, Corba Area, Chhatishgarh. (Rs. 2,00,394/-.)
  55. Subsidence Prediction by 3-D Numerical Modelling for PVK-5 incline of SCCL, Kothagudem, Andhra Pradesh. (Rs. 2,24,720/-.)
  56. Subsidence Prediction by 3-D Numerical Modelling for VK-7 incline of SCCL, Kothagudem, Andhra Pradesh. (Rs. 2,24,720/-.)
  57. Subsidence Prediction by 3-D Numerical Modelling for PVK-5 incline of SCCL, Kothagudem, Andhra Pradesh. (Rs. 2,24,720/-.)
  58. Study on Subsidence and Measures for Mitigation/Prevention of Subsidence for Bhatgaon Mine M/s Bhatgaon Extension Mines Pvt. Ltd., Bilaspur, Chhatishgarh. (Rs. 1,98,540-.)
  59. Subsidence Prediction study Using 3D-Numerical Modelling for the Mandla South U/G Project M/s Jai Prakash Associate, New Delhi. (Rs. 3,19,870/-.)
  60. Study on Subsidence and Measures for Mitigation/Prevention of Subsidence in respect of Gare-pelma sector III coal block in Raigarh, KSK Energy Venture Limited, Hyderabad. (Rs. 3,36,415/-.)
  61. Study on Subsidence and Measures for Mitigation/Prevention of Subsidence in Rawanwara North Underground Mine No.1 M/s SKS Ispat & Power Ltd., Madhya Pradesh. (Rs. 4,13,625/-.)
  62. Study on Subsidence and Measures for Mitigation/Prevention of Subsidence in Bander Coal Block, Chandrapur, Maharastra, Bander Coal Company Private Limited. (Rs. 468775/-.)
  63. Study on Subsidence and Measures for Mitigation/Prevention of Subsidence in Bhaskarpara Coal Block, Surguja for Pramarsh Consulting Engineers (Nagpur). (Rs. 38,60,50/-.)
  64. Study on Subsidence and Measures for Mitigation/Prevention of Subsidence in Kosara Dongargaon Block, Yavatmal, Maharastra. (Rs. 33,09,00/-.)
  65. Study on Subsidence and Measures for Mitigation/Prevention of Subsidence in Shahpur East Coal Block, NMDC, Madhya Pradesh. (Rs.4,68,775/-.)
  66. Study on Subsidence and Measures for Mitigation/Prevention of Subsidence in Shahpur West Block, NMDC, Madhya Pradesh. (Rs. 4,68,775/-.)